Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Progress update of NASA's free-piston Stirling space power converter technology project

A progress update is presented of the NASA LeRC Free-Piston Stirling Space Power Converter Technology Project. This work is being conducted under NASA's Civil Space Technology Initiative (CSTI). The goal of the CSTI High Capacity Power Element is to develop the technology base needed to meet the long duration, high capacity power requirements for future NASA space initiatives. Efforts are focused upon increasing system power output and system thermal and electric energy conversion efficiency at least five fold over current SP-100 technology, and on achieving systems that are compatible with space nuclear reactors. This paper will discuss progress toward 1050 K Stirling Space Power Converters. Fabrication is nearly completed for the 1050 K Component Test Power Converter (CTPC); results of motoring tests of the cold end (525 K), are presented. The success of these and future designs is dependent upon supporting research and technology efforts including heat pipes, bearings, superalloy joining technologies, high efficiency alternators, life and reliability testing, and predictive methodologies. This paper will compare progress in significant areas of component development from the start of the program with the Space Power Development Engine (SPDE) to the present work on CTPC.

Dudenhoefer, James E.↗

PR100 One-Year Progress Update: Preliminary Modeling Results and High-Resolution Solar and Wind Data Sets

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a 2-year study by the U.S. Department of Energy's (DOE's) Grid Deployment Office and six national laboratories to comprehensively analyze stakeholder-driven pathways to Puerto Rico's clean energy future. In Year 1 of the study, the PR100 team rigorously modeled and analyzed scenarios that meet Puerto Rico's renewable energy targets and achieve short-term recovery goals and long-term energy resilience. This presentation will be showcased in the form of a public webinar, which summarizes PR100 progress in Year 1, provides considerations that can inform potential funding and implementation decisions by key federal and local agencies and stakeholders. The presentation follows the publication in July 2022 of a PR100 Six-Month Progress Update (in English and Spanish), as well as public webinars in February 2022 to kick off the study and in July 2022 to present the 6-month update. A final written report and web-based visuals will be published in late 2023. All publications and public events associated with the study will be available in Spanish and English. This report is also available in Spanish: https://www.nrel.gov/docs/fy23osti/85201.pdf.

100%↗

Goodrich Electro-Optical Systems AMSD Progress Update and Test Plans

The goal of the Advanced Mirror System Demonstrator (AMSD) program is to develop and demonstrate technology for low mass primary mirror systems that can be produced at low cost and with short manufacturing times. In addition, specific performance objectives must be demonstrated at ambient and cryogenic temperatures. The Goodrich approach for AMSD is based on a thin facesheet supported through an array of figure-control actuators by a passive, stiff reaction structure. The facesheet is fused silica figured to the desired sphere by a novel process referred to as Stressed Mirror Polishing and light-weighted by water jet milling. The mirror facesheet and the reaction structure are CTE-matched For cryogenic operation. Progress update on the design, the fabrication and the test plans, both ambient and cryogenic, will be presented.

Garcia, Enrique↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100): Six-Month Progress Update [Slides]

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation provides a six-month progress update on the study, including presentation of four initial scenario frameworks defined with extensive stakeholder input.

14 SOLAR ENERGY↗

Mid-Year Progress Update on ORNL Support for Developing the Guidance for Microreactor Manufacturing Licenses

Factory fueling and assembly, multi-site operation, and the associated transportation of advanced nuclear systems present both new opportunities and challenges for microreactor deployment. These areas have not been demonstrated under Nuclear Regulatory Commission rules and regulations. A goal of the Systems Integration and Analysis technical area under the US Department of Energy Microreactor Program for the current fiscal year is to articulate these challenges and provide industry recommendations. This mid-year progress report describes the progress and some of the contributions to this effort by the Advanced Reactor Engineering and Development section at Oak Ridge National Laboratory. The content provided here is preliminary and may change before being incorporated into a later report, which is expected to be completed in September 2022.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Progress Update from the EV Charging Working Group (#982)

The EV charging working group (#982) was formed in summer 2022 to define the equip, points, relationships, and operational data related to Level 1-2 (AC) and Level 3 (DC) Electric Vehicle Supply Equipment (EVSE). Last year, the working group developed formal EVSE-related equipment definitions, where were merged into the Project Haystack documentation in November 2022. More recently the group has also been working to expand and improve Haystack definitions related to electrical equipment and circuits. This initiative is important both for EV charging related applications and to improve Project Haystack's appeal to other industry verticals such as data centers, commercial building electrification, and more. In this presentation we will share the working group's motivation, progress, and near-term objectives.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) (Six-Month Progress Update) [Slides]

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation was delivered in a public webinar on July 21, 2022, providing a high level summary of the progress in the first six months of the study, including presentation of four initial scenario definitions based on extensive stakeholder input.

14 SOLAR ENERGY↗

PROACTIVE FA4: Progress Update 2024

The Priority Research Objectives for Arms Control Technology Innovation, Verification, and Evaluation (PROACTIVE) venture’s overall goal is to address the technical challenges that will “enable the negotiation and implementation of future nuclear arms limitation/reduction treaties with verification at the level of individual warheads by advancing the state of the art in verification and monitoring capabilities.” One of the four focus areas of the venture, Focus Area 4 (FA4), is a system-of-systems effort to establish methodologies for the integration of monitoring and verification (M&V) technologies into verification systems that support treaty objectives.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Progress Update on the In Situ Load Retention Aging Vessel

To improve upon our conventional thermally accelerated aging study methods which require periodic interruption of aging to perform load testing in an Instron machine, a new aging system is being developed to: (1) automate/facilitate data acquisition/analysis, (2) improve data quality, and (3) enable uninterrupted aging conditions (compression, temperature, atmosphere) which represents the service condition. In FY24, a thermal aging vessel instrumented with load cells was fabricated and tested. That unit demonstrated the primary function of the vessel: to continuously monitor the in situ load retention of up to three compressed polymer coupons undergoing thermally accelerated aging under nitrogen. A secondary objective, not realized in the unit due to inadequate sealing, was to enable a single initial nitrogen backfill (as opposed to a continuous purge) and gas sampling of the vessel headspace during thermal aging. Heating of the vessel was achieved using a custom heater jacket.

36 MATERIALS SCIENCE↗

Ball Aerospace AMSD Progress Update

The current status of the Advanced Mirror System Demonstrator program being performed by Ball Aerospace is presented. The hexagonal low-areal density Beryllium mirror blank has been fabricated and undergoing polishing at the time of this presentation.

Blair, Mark↗

Ares Projects Office Progress Update

NASA's Vision for Exploration requires a safe, reliable, affordable launch infrastructure capable of replacing the Space Shuttle for low Earth orbit transportation, as well as supporting the goal of returning humans to the moon. This presentation provides an overview of NASA's Constellation program and the Ares I and Ares V launch vehicles, including accomplishments and future work.

Vanhooser, Teresa↗