Search NASA⌕ Search

SEARCH · Search NASA

Results for “project design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

System design projects for undergraduate design education

Design education has received considerable in the recent past. This paper is intended to address one aspect of undergraduate design education and that is the selection and development of the design project for a capstone design course. Specific goals for a capstone design course are presented and their influence on the project selection are discussed. The evolution of a series of projects based upon the design of remotely piloted aircraft is presented along with students' perspective on the capstone experience.

Batill, S. M.↗

Summary of 1989 - 1990 aeronautics design projects

Four design projects were completed at Auburn University this year under the sponsorship of the NASA/Universities Space Research Association Advanced Design Program. The topics discussed are the design of a high speed civil transport; the design of a 79 passenger, high efficiency, commercial transport; the design of a low cost short takeof vertical landing export fighter; and the design of an ozone monitoring vehicle.

Source record↗

The 1994 NASA/USRA/ADP Design Projects

The NASA/USRA/ADP Design Projects from Vanderbilt University, Department of Mechanical Engineering (1994) are enclosed in this final report. Design projects include: (1) Protein Crystal Growth, both facilities and methodology; (2) ACES Deployable Space Boom; (3) Hybrid Launch System designs for both manned and unmanned systems; (4) LH2 Fuel Tank design (SSTO); (5) SSTO design; and (6) Pressure Tank Feed System design.

Cruse, Thomas↗

Reengineering the Project Design Process

In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

Jet Propulsion Laboratory JPL project design concu↗

Lunar base and Mars base design projects

The space design classes at the University of Texas at Austin undertook seven projects in support of the NASA/USRA advanced space design program during the 1988-89 year. A total of 51 students, including 5 graduate students, participated in the design efforts. Four projects were done within the Aerospace Engineering (ASE) design program and three within the Mechanical Engineering (ME) program. Both lunar base and Mars base design efforts were studied, and the specific projects were as follows: Lunar Crew Emergency Rescue Vehicle (ASE); Mars Logistics Lander Convertible to a Rocket Hopper (ME); A Robotically Constructed Production and Supply Base on Phobos (ASE); A Mars/Phobos Transportation System (ASE); Manned Base Design and Related Construction Issues for Mars/Phobos Mission (ME); and Health Care Needs for a Lunar Colony and Design of Permanent Medical Facility (ME).

Amos, J.↗

Spacecraft design project: High latitude communications satellite

The spacecraft design project was part of AE-4871, Advanced Spacecraft Design. The project was intended to provide experience in the design of all major components of a satellite. Each member of the class was given primary responsibility for a subsystem or design support function. Support was requested from the Naval Research Laboratory to augment the Naval Postgraduate School faculty. Analysis and design of each subsystem was done to the extent possible within the constraints of an eleven week quarter and the design facilities (hardware and software) available. The project team chose to evaluate the design of a high latitude communications satellite as representative of the design issues and tradeoffs necessary for a wide range of satellites. The High-Latitude Communications Satellite (HILACS) will provide a continuous UHF communications link between stations located north of the region covered by geosynchronous communications satellites, i.e., the area above approximately 60 N latitude. HILACS will also provide a communications link to stations below 60 N via a relay Net Control Station (NCS), which is located with access to both the HILACS and geosynchronous communications satellites. The communications payload will operate only for that portion of the orbit necessary to provide specified coverage.

Josefson, Carl↗

Plutonium Age Dating Interlaboratory Comparison Overview - Project Design, Sample Preparation, and Results [Slides]

Project Design – How do you validate measured Pu model age? There are no certified reference materials (CRMs) that are certified for Pu model age or purification dates. There are no Am isotopic CRMs - IRMM 0243 243 Am spike has 241 Am impurity that can be used; Community working toward "consensus ages." This project executed and evaluated results from a Pu age dating interlaboratory comparison with six IAEA NWAL participant laboratories. It also ran the first quality control evaluation of single-picogram to sub-picogram scale interlaboratory 241 Am assay measurements from cotton swipe matrices. Results are promising, with a majority of 241 Am/ 241 Pu model age results agree to within 1 to 4 years. The calculated 241 Am assay results show interlaboratory variability, expanded percent uncertainties on calculated consensus 241 Am concentrations were: PuAge-S1 = 3.1 %, PuAge-S2 = 23 %, and PuAge-S3 = 26 %. Data can be used to investigate laboratory methods and improve precision and accuracy of 241 Pu and 241 Am assay for future campaigns.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Aeroassisted manned transfer vehicle (TAXI) for advanced Mars Transportation: NASA/USRA 1987 Senior Design Project

A conceptual design study of an aeroassisted orbital transfer vehicle is discussed. Nicknamed TAXI, it will ferry personnel and cargo: (1) between low Earth orbit and a spacecraft circling around the Sun in permanent orbit intersecting gravitational fields of Earth and Mars, and (2) between the cycling spacecraft and a Mars orbiting station, co-orbiting with Phobos. Crew safety and mission flexibility (in terms of ability to provide a wide range of delta-V) were given high priority. Three versions were considered, using the same overall configuration based on a low L/D aerobrake with the geometry of a raked off elliptical cone with ellipsoidal nose and a toroidal skirt. The propulsion system consists of three gimballed LOX/LH2 engines firing away from the aerobrake. The versions differ mainly in the size of the aeroshields and propellant tanks. TAXI A version resulted from an initial effort to design a single transfer vehicle able to meet all delta-V requirements during the 15-year period (2025 to 2040) of Mars mission operations. TAXI B is designed to function with the cycling spacecraft moving in a simplified, nominal trajectory. On Mars missions, TAXI B would be able to meet the requirements of all the missions with a relative approach velocity near Mars of less than 9.3 km/sec. Finally, TAXI C is a revision of TAXI A, a transfer vehicle designed for missions with a relative velocity near Mars larger than 9.3 km/sec. All versions carry a crew of 9 (11 with modifications) and a cargo of 10000 lbm. Trip duration varies from 1 day for transfer from LEO to the cycling ship to nearly 5 days for transfer from the ship to the Phobos orbit.

Source record↗

Design project: Viper

The design specification of the primary flight trainer are: must conform to F.A.R. 23, including the crashworthiness standards; is limited to two to four occupants; engine must be FAA certified; must comply with FAA standards for VFR and allow for upgrade to IFR flights; must be at least utility category with good spin recovery characteristics; must have a structural lifetime of at least 10,000 flight hours; capable of either of two training missions: climb to 5,000 ft., cruise 500 Nm. plus reserve, land, or climb to 1,000 ft. and descend ten cycles for landing practice, climb to 3,000 ft., maneuver at two g's for 15 minutes, cruise 100 Nm. and land; must have a cruise speed of at least 120 knots; must take-off or land on a runway no longer than 3,000 ft; and has a cost goal of $50,000, not including avionics, for production of 1,000 airplanes over a five year period.

Haithcock, Stephen↗

A mission design for International Manned Mars Mission - From the 1991 International Space University (ISU) Design Project

The International Space University (ISU) conducted a study of an international program to support human exploration of Mars as its annual Design Project activity during its 1991 summer session in Toulouse, France. Although an ISU Design Project strives to produce an in-depth analysis during the intense 10-week summer session, the International Mars Mission (IMM) project was conducted in a manner designed to provide a learning experience for young professionals working in an unusual multidisciplinary and multinational environment. The breadth of the IMM study exceeds that of most Mars mission studies of the past, encompassing political organization for long-term commitment, multinational management structure, cost analysis, mission architecture, vehicle configuration, crew health, life support, Mars surface infrastructure, mission operations, technology evaluation, risk assessment, scientific planning, exploration, communication networks, and Martian resource utilization. The IMM Final Report has particular value for those seeking insight into the choices made by a multinational group working in an apolitical environment on the problems of international cooperation in space.

Mendell, Wendell W.↗

Representative Project Design Envelope for Floating Offshore Wind Energy: A Focus on the California 2023 Federal Leases

NREL developed recommendations for a representative project design envelope (RPDE) for floating offshore wind energy projects in the California lease areas, considering industry feedback from offshore wind farm developers. The RPDE provides estimates of minimum and maximum values for project design parameters that are relevant for assessing environmental impacts. The design envelope considers the practical range of technology options that may be deployed and accounts for major physical constraints, technology feasibility, and supply chain readiness. In addition to the RPDE, this report presents four scenarios that illustrate some of the differences between technologies that could be used offshore California, as well as descriptions of the typical installation processes that are expected to be used for floating offshore wind farms.

17 WIND ENERGY↗

ART/Ada design project, phase 1. Task 1 report: Overall design

The design methodology for the ART/Ada project is introduced, and the selected design for ART/Ada is described in detail. The following topics are included: object-oriented design, reusable software, documentation techniques, impact of Ada, design approach, and differences between ART-IM 1.5 and ART/Ada 1.0 prototype. Also, Ada generator and ART/Ada runtime systems are discussed.

Allen, Bradley P.↗

The 1987-1988 advanced space design projects: Results from the fall semester of 1987 and the spring semester of 1988

Students in Aerospace Engineering (ASE) and Mechanical Engineering (ME) at the University of Texas at Austin completed eight separate design projects under the sponsorship of the NASA/USRA Advanced Space Design Program. During the Fall semester of 1987, ASE and ME students worked on various aspects of a 'bootstrap' lunar base. ASE students concentrated on the overall definition of the base while the ME team designed a convertible lunar lander lower stage. Six design projects were executed during the spring semester of 1988. Aerospace engineering students designed a fast Mars mission crew transfer vehicle, an Earth-orbiting transportation node to support the lunar base, a lunar base construction shack/initial habitat vehicle, and carried out a systems assessment aimed at arresting ozone depletion in the Earth's atmosphere. The ME students designed a lunar surface personnel navigation system and investigated radiation shielding structures for a lunar base. The design objectives, a summary of the results, and selected comments are given concerning each of the projects. Due to the number of projects completed, the reader should refer to the text of the final project reports for additional and detailed information.

Source record↗

Various advanced design projects promoting engineering education

The Universities Space Research Association (USRA) Advanced Design Program (ADP) program promotes engineering education in the field of design by presenting students with challenging design projects drawn from actual NASA interests. In doing so, the program yields two very positive results. Firstly, the students gain a valuable experience that will prepare them for design problems with which they will be faced in their professional careers. Secondly, NASA is able to use the work done by students as an additional resource in meeting its own design objectives. The 1994 projects include: Universal Test Facility; Automated Protein Crystal Growth Facility; Stiffening of the ACES Deployable Space Boom; Launch System Design for Access to Space; LH2 Fuel Tank Design for SSTO Vehicle; and Feed System Design for a Reduced Pressure Tank.

Source record↗

Autonomous space processor for orbital debris advanced design project in support of solar system exploration

This paper is regarding a project in the Advanced Design Program at the University of Arizona. The project is named the Autonomous Space Processor for Orbital Debris (ASPOD) and is a NASA/Universities Space Research Association (USRA) sponsored design project. The development of ASPOD and the students' abilities in designing and building a prototype spacecraft are the ultimate goals of this project. This year's focus entailed the development of a secondary robotic arm and end-effector to work in tandem with an existent arm in the removal of orbital debris. The new arm features the introduction of composite materials and a linear drive system, thus producing a light-weight and more accurate prototype. The main characteristic of the end-effector design is that it incorporates all of the motors and gearing internally, thus not subjecting them to the harsh space environment. Furthermore, the arm and the end-effector are automated by a control system with positional feedback. This system is composed of magnetic and optical encoders connected to a 486 PC via two servo-motor controller cards. Programming a series of basic routines and sub-routines has allowed the ASPOD prototype to become more autonomous. The new system is expected to perform specified tasks with a positional accuracy of 0.5 cm.

Ramohalli, Kumar↗

Optics Design for the U.S. SKA Technology Development Project Design Verification Antenna

The U.S. design concept for the Square Kilometer Array (SKA) program is based on utilizing a large number of 15 meter dish antennas. The Technology Development Project (TDP) is planning to design and build the first of these antennas to provide a demonstration of the technology and a solid base on which to estimate costs. This paper describes the performance of the selected optics design. It is a dual-shaped offset Gregorian design with a feed indexer that can accommodate corrugated horns, wide band single pixel feeds or phased array feeds.

Corrugated Horns↗

Safeguards by Design Projects (FY2020 Final Report)

This University Engagement project challenged engineering students at universities, that do not have Bachelor degrees in nuclear engineering but do have research reactors and some nuclear engineering coursework, to incorporate Safeguards by Design concepts into their Senior Capstone Design Project. This University Engagement project was part of the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), Office of Defense Nuclear Nonproliferation, Office of International Nuclear Safeguards, Next Generation Safeguards Initiative, Human Capital Development: University Engagement Program. This program exposed university students with Mechanical Engineering majors and Nuclear Engineering minors to the concepts of international nuclear safeguards. FY20, three teams at the University of Rhode Island and one team at the University of Texas - Austin participated in researching, designing, building, and testing projects to support international nuclear safeguards measurements or verification. The projects involved engaging in activities at the university’s research reactors. All the projects engaged students with prototyping a design and/or tool for application at the Universities’ reactor. At the end of the course, most of the students expressed the experience was a positive and they learned more about international nuclear safeguards and applying requirements than they had previously encountered. This school year the projects were further complicated by the COVID-19 pandemic. Both universities cancelled in class room classes, and limited direct student/professor interactions. Furthermore, Los Alamos National Laboratory (LANL) greatly restricted travel, therefore making it impossible to visit the students at the end of the semester for the review of their design projects. The final design and review meeting for the projects happened via the internet. Additionally, while the teams planned to build prototypes this did not happen since there was a social distancing ban on students meeting in person.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safeguards by Design Projects (Final Report-FY-22)

This University Engagement project challenged engineering students at universities, that do not have Bachelor degree programs in nuclear engineering but do have research reactors and some nuclear engineering coursework, to incorporate Safeguards by Design concepts into their Senior Capstone Design Project. This University Engagement project was part of the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), Office of Defense Nuclear Nonproliferation, Office of International Nuclear Safeguards, Next Generation Safeguards Initiative (NGSI), Human Capital Development (HCD): University Engagement Program. This program exposed university students with Mechanical Engineering majors and Nuclear Engineering minors to the concepts of international nuclear safeguards. In FY22, three teams at the University of Rhode Island and two teams at the University of Texas - Austin participated in researching, designing, building, and testing projects to support international nuclear safeguards measurements or verification. The projects involved engaging in activities at the university’s research reactors. All the projects engaged students with prototyping a design and/or tool for application at the Universities’ reactor. At the end of the course, most of the students expressed the experience was positive and they learned more about international nuclear safeguards and applying requirements than they had previously encountered. This school year the projects were further complicated by the COVID-19 pandemic. Both universities had limited in classes on campus, still relying on Zoom classes, and limited direct student/professor interactions. Furthermore, Los Alamos National Laboratory (LANL) greatly restricted travel, therefore making it impossible to visit the students at the end of the semester for the review of their design projects. The final design and review meeting for the projects happened via meetings over the internet. Additionally, the teams did build and test some prototypes but could only do so in a limited capacity.

42 ENGINEERING↗