Search NASA⌕ Search

SEARCH · Search NASA

Results for “project development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Criticality Safety Evaluation Project Development for University of California Berkely Nuclear Criticality Safety Pipeline Course

The Nuclear Criticality Safety Division at Lawrence Livermore National Laboratory (LLNL) has taken a unique approach to developing criticality safety evaluation topics in support of the University of California Berkeley criticality safety pipeline course. The evaluation topics are designed to go beyond the typical evaluation examples used for many training courses including vault storage and variations on storage arrays. These types of evaluations provide in-depth analysis into the fundamentals of criticality safety and are complex but may be far off from what a new criticality safety engineer may actually be evaluating. To provide more practical examples of criticality safety evaluation topics that are better fit for the knowledge level of a criticality safety engineer in-training, variations of current and future operations and research operations performed at LLNL are used as evaluation topics. Additionally, an emphasis on research is included in all evaluation topics as it allows students to take advantage of the concepts learned in class to apply them for process improvement, engineering equipment that is favorable for criticality safety, and negotiation tactics to work with operations personnel. The process used by LLNL to develop project topics for the pipeline course is provided in this paper. The intent is to provide an alternative technique for training students and potentially younger staff members in criticality safety on developing criticality safety evaluations.

42 ENGINEERING↗

Shandiin Solar Project Development

The project is located on CBN lands 20 miles west of Albuquerque, New Mexico and will consist of approximately 200 acres of solar photovoltaic (PV) panels and other equipment with a name plate capacity of 30 Megawatts. This project has recently been incorporated under the name Shandiin Solar, LLC. The goal of this project is to provide a vehicle for CBN economic development. The U.S. Department of Energy (DOE) funded aspect of the project will be to conduct development activities for the 30 Megawatt (MW) Shandiin Solar projects, including: complete final engineering and design, obtain an interconnect agreement, obtain lease agreement, finalize financing, complete business agreements and obtain a power purchase agreement.

14 SOLAR ENERGY↗

Managing Knowledge Over Time for Supporting Radioactive Waste Geological Disposal Project Development - 19028

Projects designed to define, build, operate and monitor radioactive waste disposal solutions require the transmission of knowledge over several decades and the preservation of memory over several centuries. This is particularly acute for the geological disposal project 'Cigeo' led by the French national radioactive waste management agency (Andra) as far as the requirements in terms of reversibility lead to the choice of an incremental design that allows to integrate learning resulting from continuous improvement of knowledge. For instance, for robustness purposes, Cigeo is designed on the basis of currently proven technologies, but its step-by-step construction in successive stages must make it possible to integrate improvements derived from the scientific and technical progress as well as from experience feedback from its exploitation. In the field of industrial activity, a significant proportion of the knowledge and skills implemented by employees of a company are not known or even identified by the human resources organization or the mid-management staff. This is mainly due to the fact that (i) the organized knowledge-sharing is often based on documentary tools but little on social modalities and (ii) the organization of knowledge is mostly cross-cutting to the managerial lines. To overcome this bias, a global and integrated approach to knowledge management is currently the focus of Andra's specific efforts. Cross-disciplinary groups and close intergenerational links positioned throughout the life of the projects aim specifically at continuous and participative knowledge sharing, capitalization and transmission. Then, devices aiming at systematic dissemination of and access to knowledge support experience feedback and provide unified collaboration, traceability and decision-support at all scales. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fast Charging Electric Vehicle Research & Development Project

The research and development project supported the engineering, design and implementation of on-road Electric Vehicle (“EV”) charging technologies. It included development of potential solutions for DC fast chargers (“DCFC”) capable of converting high voltage AC power to the DC power required by EVs. Additional development evaluated solutions related to the packaging of power electronic components and enclosure design, as well as for the design and evaluation of EV charging stations. Research compared different charging technologies to identify optimum applications in a municipal fleet. This project collected EV usage data and generated a report demonstrating that EVs, when supported by adequate charging infrastructure, are capable of replacing traditional internal combustion vehicles in many municipal applications. The project’s period of performance has demonstrated various methods of incorporating EVs into a municipal environment, and has identified three general categories for EV applications: Short Commute: Defined as EVs performing in limited duration, routine commutes. - Long Commute: Defined as tasks that require EVs to operate in longer daily mileage patterns. - Critical Needs: Defined as the need for EVs to be ready at every moment for indefinite periods. Together, the City of Charlottesville, VA (the “City”) and Aker Wade Power Technologies, LLC (“Aker Wade”) concluded that the EV has a viable position in many municipal fleets but with limited recommendation for use in Critical Needs applications such as Police fleets. The report also documented that, compared to internal combustion vehicles, BEVs have lower vehicle-related greenhouse gas (“GHG”) emissions and contribute to a reduction of air pollution in urban areas. The enhanced integration of EVs in a municipal fleet can result in reduced demand for imported oil and reduced municipal operating costs. The conclusions indicated in the project’s Engineering Report (see Attachment A) are intended to assist future implementation of electric vehicle technology. They are based on the cited research and on the empirical data collected and presented. The report is not expected to represent the entire operating conditions of any of the equipment under consideration within this project, and tested equipment may operate differently under other conditions.

42 ENGINEERING↗

Framework for Project Development in the Renewable Energy Sector

The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Offshore Wind Energy Permitting: A Survey of U.S. Project Developers

The U.S. Department of Energy (DOE) has adopted a goal to generate 20% of the nation’s electricity from wind power by 2030. Achieving this “20% Wind Scenario” in 2030 requires acceleration of the current rate of wind project development. Offshore wind resources contribute substantially to the nation’s wind resource, yet to date no offshore wind turbines have been installed in the U.S. Progress developing offshore wind projects has been slowed by technological challenges, uncertainties about impacts to the marine environment, siting and permitting challenges, and viewshed concerns. To address challenges associated with siting and permitting, Pacific Northwest National Laboratory (PNNL) surveyed offshore wind project developers about siting and project development processes, their experience with the environmental permitting process, and the role of coastal and marine spatial planning (CMSP) in development of the offshore wind industry. Based on the responses to survey questions, we identify several priority recommendations to support offshore wind development. Recommendations also include considerations for developing supporting industries in the U.S. and how to use Coastal and Marine Spatial Planning (CMSP) to appropriately consider ocean energy among existing ocean uses. In this report, we summarize findings, discuss the implications, and suggest actions to improve the permitting and siting process.

17 WIND ENERGY↗

Development and application of an environmental risk register for marine energy device and project developers

The marine energy industry is steadily advancing as more devices are deployed worldwide. However, several challenges and barriers remain, such as lingering uncertainty regarding the potential environmental effects of marine energy devices on marine animals, habitats, and ecosystems. Concerns have led to difficulty navigating permitting and consenting processes and receiving authorization to deploy devices in the marine environment, including extended timelines and costs. Based on existing risk registers, a novel marine energy environmental risk register was created to help the marine energy industry move beyond these barriers. This risk register aims to aid marine energy device and project developers identify and assess potential environmental risks early in device design or project planning, document and track potential environmental interactions, prioritize risks and determine risk responses, and make decisions throughout device or project development. It can also be used as a tool to assist in communicating with regulators and advisors during permitting processes and to inform stakeholder and community engagement efforts. This paper details the methods and process to develop a risk register specific to environmental effects of marine energy and describes two use cases (one for wave energy and another for tidal energy) to highlight example results. Due to the tool's novelty, the paper showcases its application for the marine energy industry and acknowledges limitations and possible future improvements. Overall, the environmental risk register shows promise to support marine energy developers when identifying, tracking, and addressing potential environmental risks and to help successfully navigate permitting and deploy marine energy devices responsibly.

Environmental effects↗

FEMP ESPC Project Development Resource Guide

Guide charts the Federal Energy Management Program process for providing project development support to agencies developing energy savings performance contract (ESPC) projects using the U.S. Department of Energy (DOE) indefinite-delivery, indefinite-quantity (IDIQ) ESPC. Within that process, the guide outlines: (1) the resources that Project Facilitators (PFs) and Federal Project Executives (FPEs) are required to use in their lead role in the delivery of project development services, and (2) minimum requirements for project documentation.

ESPCs↗

Identifying and Estimating Project Development Costs [Slides]

This presentation focuses on renewable energy project development and planning and highlights common project costs at each stage of a project's lifecycle. The presentation was produced as part of a series of trainings for awardees of the Energizing Rural Communities prize.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Go slow to go fast? A review of the impacts of permitting on large-scale solar project development

State and local permitting challenges could impede the ability of large-scale solar (LSS) to meet growing electricity demand in the United States. Here, we review research that explores LSS permitting and its impacts on the pace and scale of LSS project development. Research on LSS permitting is relatively scarce, such that we support our review with research in the context of wind permitting, where appropriate. Further, few studies attempt to rigorously quantify the effects of permitting on the pace and scale of LSS project development. The available evidence allows us to identify various hypotheses and identify gaps for further research. Our review suggests that differences in permitting policies, regulations, and ordinances explain relatively little variation in LSS permitting and development outcomes across jurisdictions, except where jurisdictions implement rules designed to impede LSS. The evidence suggests LSS permitting challenges largely accrue during the implementation of permitting processes. Recent research suggests that community opposition to project development is a key driver of LSS permitting challenges, given that project opponents often use permitting processes to translate opposition into legal action. We call on future researchers to more concretely describe the LSS permitting challenge and to identify the specific actors responsible for implementing solutions.

Community opposition↗

1995 OMPO Model Development Project

The 1995 Oahu Metropolitan Planning Organization (OMPO) Model Development Project for Oahu Island was intended to document how Oahu residents use the streets, highways, and transit services in the region. These data were used to develop the Travel Demand Forecasting Model, which is used to forecast the traffic impacts of various land use changes. The survey collected complete travel information of 4,060 Oahu households for a 24-hour period, including demographic and socioeconomic data.

1Hz data↗

Assessing human rights impacts in corporate development projects

Human rights impact assessment (HRIA) is a process for systematically identifying, predicting and responding to the potential impact on human rights of a business operation, capital project, government policy or trade agreement. Traditionally, it has been conducted as a desktop exercise to predict the effects of trade agreements and government policies on individuals and communities. In line with a growing call for multinational corporations to ensure they do not violate human rights in their activities, HRIA is increasingly incorporated into the standard suite of corporate development project impact assessments. In this context, the policy world's non-structured, desk-based approaches to HRIA are insufficient. Although a number of corporations have commissioned and conducted HRIA, no broadly accepted and validated assessment tool is currently available. The lack of standardisation has complicated efforts to evaluate the effectiveness of HRIA as a risk mitigation tool, and has caused confusion in the corporate world regarding company duties. Hence, clarification is needed. The objectives of this paper are (i) to describe an HRIA methodology, (ii) to provide a rationale for its components and design, and (iii) to illustrate implementation of HRIA using the methodology in two selected corporate development projects—a uranium mine in Malawi and a tree farm in Tanzania. We found that as a prognostic tool, HRIA could examine potential positive and negative human rights impacts and provide effective recommendations for mitigation. However, longer-term monitoring revealed that recommendations were unevenly implemented, dependent on market conditions and personnel movements. This instability in the approach to human rights suggests a need for on-going monitoring and surveillance. -- Highlights: • We developed a novel methodology for corporate human rights impact assessment. • We piloted the methodology on two corporate projects—a mine and a plantation. • Human rights impact assessment exposed impacts not foreseen in ESIA. • Corporations adopted the majority of findings, but not necessarily immediately. • Methodological advancements are expected for monitoring processes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Modeling the determinants of the social impacts of agricultural development projects

In an attempt to help policy-makers improve the social sustainability of development projects, this study identifies the key determinants of farmers' attitudes relating to the social impacts of the floodwater spreading project (FWSP) on the Gareh-Bygone plain in Iran. In order to analyze the links between the various factors that affect the experience of social impact, a theoretical framework was developed. Stratified random sampling was used to survey 138 farm households from the four villages in the region. One male and one female from each house were interviewed face-to-face using a questionnaire, resulting in a total of 276 interviews. Structural factors were found to be the largest contribution to stakeholders' attitudes relating to the social impacts of the project. Results from a cluster analysis suggested that the level of floodwater information, level of participation, water access, ownership change, and environmental worldview were the most important factors explaining attitude towards social impact of the FWSP.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NTRCI Legacy Engine Research and Development Project Final Technical Report

The Legacy engine is a completely new design, transitional diesel engine, replacing the reciprocating engine with a rotary engine. The Legacy engine offers significant advances over conventional internal combustion engines in 1) power to weight ratio; 2) multiple fuel acceptance; 3) fuel economy; and 4) environmental compliance. These advances are achieved through a combination of innovative design geometry, rotary motion, aspiration simplicity, and manufacturing/part simplicity. The key technical challenge to the Legacy engine's commercialization, and the focus of this project, was the development of a viable roton tip seal. The PST concept for the roton tip seal was developed into a manufacturable design. The design was evaluated using a custom designed and fabricated seal test fixture and further refined. This design was incorporated into the GEN2.5A prototype and tested for achievable compression pressure. The Decision Point at the end of Phase 1 of the project (described below) was to further optimize the existing tip seal design. Enhancements to the tip seal design were incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Compression pressures adequate for compression ignition of diesel fuel were achieved, although not consistently in all combustion volumes. The variation in compression pressures was characterized versus design features. As the roton tip seal performance was improved, results pointed toward inadequate performance of the housing side seals. Enhancement of the housing side seal system was accomplished using a custom designed side seal test fixture. The design enhancements developed with the test fixture were also incorporated into the GEN2.5B prototype and tested and evaluated using the iterative research strategy described below. Finally, to simplify the requirements for the roton tip seals and to enhance the introduction and combustion of fuel, a flush-mount fuel injector was designed, manufactured and demonstrated in the GEN2.5B prototype.

33 ADVANCED PROPULSION SYSTEMS↗

High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

high burnup, dry storage cask, final test plan, fu↗