Search NASA⌕ Search

SEARCH · Search NASA

Results for “project factors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Measurements of the suppression and correlations of dijets in Pb+Pb collisions at $\sqrt{s_{NN}}$ = 5.02 TeV

Studies of the correlations of the two highest transverse momentum (leading) jets in individual Pb+Pb collision events can provide information about the mechanism of jet quenching by the hot and dense matter created in such collisions. In Pb+Pb and $pp$ collisions at $\sqrt{s_{NN}}$ = 5.02 TeV, measurements of the leading dijet transverse momentum ($p_T$) correlations are presented. Additionally, measurements in Pb+Pb collisions of the dijet pair nuclear modification factors projected along leading and subleading jet $p_T$ are made. The measurements are performed using the ATLAS detector at the LHC with 260 pb –1 of pp data collected in 2017 and 2.2 nb –1 of Pb+Pb data collected in 2015 and 2018. An unfolding procedure is applied to the two-dimensional leading and subleading jet $p_T$ distributions to account for experimental effects in the measurement of both jets. Results are provided for dijets with leading jet $p_T$ greater than 100 GeV. Measurements of the dijet-yield-normalized $x_{J}$ distributions in Pb+Pb collisions show an increased fraction of imbalanced jets compared to pp collisions; these measurements are in agreement with previous measurements of the same quantity at 2.76 TeV in the overlapping kinematic range. Measurements of the absolutely normalized dijet rate in Pb+Pb and pp collisions are also presented, and show that balanced dijets are significantly more suppressed than imbalanced dijets in Pb+Pb collisions. It is observed in the measurements of the pair nuclear modification factors that the subleading jets are significantly suppressed relative to leading jets with $p_T$ between 100 and 316 GeV for all centralities in Pb+Pb collisions.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Inversion of dynamical Bragg intensities to complex structure factors by iterated projections. For Ultramic. 2020. ("Pico" Festschrift, May 2021)

We discuss a method for recovering complex structure factors from many simultaneously excited Bragg beam intensities is described. The method is applied to simulated transmission electron diffraction data over a wide range of crystal thickness and beam energies. The method is based on iterated projections between structure and scattering matrices, which are related by a matrix unitary transformation, exponential, which we invert. The algorithm removes multiple-scattering perturbations from diffraction data and might be extended to other fields, including X-ray and neutron diffraction and cryo-electron microscopy. Because coherent multiple scattering involves interference between Bragg beams, the method also solves the phase problem. Unlike dynamical inversion from electron microscope images or ptychography data, the method, which starts with Bragg beam intensities, provides complex structure factors unaffected by focusing errors or resolution limitations imposed by lenses. We provide inversions from simulated data with 441 simultaneously excited Bragg beams over a range of thickness and beam energy. We discuss the retrieval of chirality information from enantiomorphs, the efficient incorporation of symmetry information using the irreducible representation of the group of structure matrices, and the effect of HOLZ lines to provide three-dimensional information.

97 MATHEMATICS AND COMPUTING↗

Non-disruptive error field measurement in DIII-D low safety factor plasmas and projection to ITER

Previous experiments in DIII-D (Paz-Soldan et al 2022 Nucl. Fusion 62 126007) introduced a method to identify intrinsic error fields (EFs) in tokamaks with minimal disruption risk by promptly healing driven magnetic islands during the conventional 'compass scan'. This paper presents recent experimental and numerical advancements in extending this approach to low q 95 plasmas, and projects its applicability to ITER. Non-disruptive EF measurement is achieved at q 95 = 4.5 and 3.9 without any initial EF correction (EFC) by reducing the time between the occurrence of the locked mode (LM) and control action to 10 ms and increasing the density 50%–100%. However, 50% correction of the intrinsic EF is required to achieve island healing at q 95 = 3.2 with 10 ms delay for the control action. Nonlinear two-fluid modeling with the TM1 code reproduces the DIII-D experimental observations, indicating that promptly turning off the 3D coil current reduces both magnetic island width and electromagnetic force, while raising the density increases plasma viscosity, facilitating magnetic island healing. The simulations show that for scenarios with q 95 = 3.2, lowering the control action time to 5 ms will lead to island healing without EFC. TM1 simulations are extended to future ITER scenarios with 5 MA and 7.5 MA plasma currents, predicting the dependence of required density rise on action time and EF amplitude. These simulations indicate that, benefiting from the much longer resistive time, island healing can be successfully achieved in ITER when taking control action 100–500 ms after a LM occurrence.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Surface Finishing and Coating Parameters Impact on Additively Manufactured Binder-Jetted Steel–Bronze Composites

In this paper, electroless nickel plating is explored for the protection of binder-jetting-based additively manufactured (AM) composite materials. Electroless nickel plating was attempted on binder-jetted composites composed of stainless steel and bronze, resulting in differences in the physicochemical properties. We investigated the impact of surface finishing, plating solution chemistry, and plating parameters to attain a wide range of surface morphologies and roughness levels. We employed the Keyence microscope to quantitatively evaluate dramatically different surface properties before and after the coating of AM composites. Scanning electron microscopy revealed a wide range of microstructural properties in relation to each combination of surface finishing and coating parameters. We studied chempolishing, plasma cleaning, and organic cleaning as the surface preparation methods prior to coating. We found that surface preparation dictated the surface roughness. Taguchi statistical analysis was performed to investigate the relative strength of experimental factors and interconnectedness among process parameters to attain optimum coating qualities. The quantitative impacts of phosphorous level, temperature, surface preparation, and time factor on the roughness of the nickel-plated surface were 17.95%, 8.2%, 50.02%, and 13.21%, respectively. On the other hand, the quantitative impacts of phosphorous level, temperature, surface preparation, and time factor on the thickness of nickel plating were 35.12%, 41.40%, 3.87%, and 18.24%, respectively. The optimum combination of the factors’ level projected the lowest roughness of Ra at 7.76 µm. The optimum combination of the factors’ level projected the maximum achievable thickness of ~149 µm. This paper provides insights into coating process for overcoming the sensitivity of AM composites in hazardous application spaces via robust coating.

36 MATERIALS SCIENCE↗

DOE Early Career Project Annual Report: Disentangling the factors controlling the emission of bioparticles that act as ice nucleating particles

This report describes the accomplishments, progress, and obstacles encountered during the first project year of the U.S. Department of Energy Biological and Environmental Research program Early Career project, “Disentangling the factors controlling the emission of bioparticles that act as ice nucleating particles.”

54 ENVIRONMENTAL SCIENCES↗

Insights from Initial Engineering Designs of Point Source Capture at Industrial Facilities

Initial engineering design studies examining the application of state-of-the-art carbon capture technology at industrial plants contain generally overlooked real-world design considerations for near-term deployment of point source capture (PSC). The implementation of PSC across a wide range of industrial applications presents unique challenges associated with fluctuating CO<sub>2</sub> concentrations, flue gas composition, and utility and land availability. In this article, seven recent industrial retrofit PSC projects are reviewed to investigate the impact of site-specific factors on project design and cost. Across the seven projects, three capture technology classes and four industrial applications are considered, allowing insight into industry-specific opportunities for PSC technology synergy. Common challenges across projects and proposed design solutions are highlighted to propagate ideas and solutions to close the technology gaps and accelerate learning rates.

FEED Studies↗

Z Facility Sustainment Status (November FY 2024) [Slides]

FY24 sustainment project list has been revised resulting in sixteen projects. Total budget for the finalized project list is $9,570,968 (includes FY23 Carryover and FY24). Key factors for project selection included: risk mitigation to address operations highest failure risk subsystems, purchase of long lead parts to address life limited parts, and completion of multi phase sustainment projects initiated in prior year. Given the backlog of projects and limited FY24 funding, there are identified projects that are not included in the final project list that could reduce future Z facility failure risk. Should additional budget become available, these identified projects can be kicked off.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Drivers and energy justice implications of renewable energy project siting in the United States

The rapid expansion of solar and wind energy projects is raising questions of energy justice. Some scholars argue that solar and wind project development could burden under-resourced communities with negative impacts such as environmental harm and reduced access to resources. Conversely, other scholars argue that project development could be a boon to under-resourced communities, providing local economic and cultural benefits. Here, we analyze the drivers of solar and wind project siting patterns in the United States and explore their potential energy justice implications. We find that siting patterns are driven primarily by technoeconomic factors, especially resource quality and access to open undeveloped spaces. These technoeconomic factors channel projects into sparsely populated rural areas and, to a lesser extent, areas with lower income levels. Here, we avoid simplifying assumptions about the broad justice implications of these siting patterns and explore our results from multiple perspectives.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS

In 2020, Patua Acquisition Company LLC, submitted the proposal “Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS”, in response to the DOE’s Geothermal Wells of Opportunity Funding Opportunity Announcement. The primary goal of the project was to convert an idle well, Patua 16-29, to an active producer and generate at least an additional 5 MWe at the Patua plant. The project was intended to provide an example of a reproducible methodology for well stimulation in Enhanced Geothermal Systems The project was proposed to be performed in three phases over a period of performance of four years. A first project go/no-go decision was made at the end of Phase 1 based on feasibility of the wellbore, site, and ability to realize a 5 MWe benefit from the project. Several factors were recognized that led to a no-go decision at this phase: • Electrical needs for placing the stimulated well on production were not considered in the initial scoping. Costs of pipeline costs were also underestimated in the original cost share. Easements and rights-of-way to establish a geothermal pipeline underneath or across an interstate highway were also found to be intractable on the time scale of the project. • The plant is injection limited, and no design or cost estimate was in place to handle the additional production needed to realize a 5 Mwe benefit. A new injection well would need to be drilled in addition to the other facility improvements to bring in the stimulated well. Patau Acquisition Company attempted to locate additional wells of opportunity that could realize the SOPOs goals, but was unsuccessful. As a result, this project is being terminated at the end of Phase 1.

15 GEOTHERMAL ENERGY↗

Non-stationary precipitation design standards for stormwater infrastructure modernization at USAF installations

The resilience of defense infrastructure systems to a changing climate is critical for national security. Climate induced recurrent flooding is already impacting over 20 U.S. Air Force installations, underscoring the urgency of revisiting precipitation standards and stormwater infrastructure design. Despite growing scientific knowledge and an expanding set of tools for updating outdated precipitation standards based on the assumption of climate stationarity, the adoption of climate informed analyses remain limited in practice. This study utilizes an existing framework to update Intensity (or Depth)-Duration-Frequency (DDF) curves using an ensemble of future climate projections. Change factors in precipitation estimates are derived and applied to six USAF installations across the U.S. The analysis is further extended to evaluate the implications of climate-informed DDFs on stormwater infrastructure performance and flood analysis at Tyndall AFB. Results indicate that the current design precipitation estimates are likely to become obsolete in all six USAF bases by the end of the century. The wide range of change factors across 32 GCM ensembles highlights the need to integrate uncertainty and evolving scientific data into infrastructure planning. The study also finds that the impacts of a changing climate vary spatially and temporally, emphasizing the value of localized analysis for infrastructure decision-making. The work advances ongoing DoD and societal efforts to implement adaptation strategies aimed at enhancing infrastructure resilience.

Intensity-duration-frequency curves↗

On the Links Between Ice Nucleation, Cloud Phase, and Climate Sensitivity in CESM2

Ice nucleation in mixed-phase clouds has been identified as a critical factor in projections of future climate. Here we explore how this process influences climate sensitivity using the Community Earth System Model 2 (CESM2). We find that ice nucleation affects simulated cloud feedbacks over most regions and levels of the troposphere, not just extratropical low clouds. However, with present-day global mean cloud phase adjusted to replicate satellite retrievals, similar total cloud feedback is attained whether ice nucleation is simulated as aerosol-sensitive, insensitive, or absent. These model experiments all result in a strongly positive total cloud feedback, as in the default CESM2. A microphysics update from CESM1 to CESM2 had substantially weakened ice nucleation, due partly to a model issue. Our findings indicate that this update reduced global cloud phase bias, with CESM2's high climate sensitivity reflecting improved mixed-phase cloud representation.

54 ENVIRONMENTAL SCIENCES↗

Data-driven linear time advance operators for the acceleration of plasma physics simulation

In this study, we demonstrate the application of data-driven linear operator construction for time advance with a goal of accelerating plasma physics simulation. We apply dynamic mode decomposition (DMD) to data produced by the nonlinear SOLPS-ITER (Scrape-off Layer Plasma Simulator - International Thermonuclear Experimental Reactor) plasma boundary code suite in order to estimate a series of linear operators and monitor their predictive accuracy via online error analysis. We find that this approach defines when these dynamics can be represented by a sequence of approximate linear operators and is essential for providing consistent projections when compared to an unconstrained application. For linear diffusion and advection–diffusion fluid test problems, we construct and apply operators within explicit and implicit time advance schemes, demonstrating that stability can be robustly guaranteed in each case. We further investigate the use of the linear time advance operators within several integration methods including forward Euler, backward Euler, and the matrix exponential. The application of this method to simulation data from SOLPS-ITER, with varying levels of Markov chain Monte Carlo numerical noise, shows that constrained DMD operators yield a capability to identify, extract, and integrate a (slow) subset of the present timescales. Example applications show that for projected speedup factors of [Formula: see text], and [Formula: see text], a mean relative error of 3%, 5%, and 8% and maximum relative error less than 20% are achievable, which appears acceptable for typical SOLPS-ITER steady-state simulations.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Sensitivity analysis of numerical modeling input parameters on floating offshore wind turbine loads

Abstract. Floating wind turbines must withstand a unique and challenging set of loads from the wind and ocean environment. To de-risk development, accurate predictions of these loads are necessary. Uncertainty in modeling predictions leads to larger required safety factors, increasing project costs and the levelized cost of energy. Complex aero-hydro-elastic modeling tools use many input parameters to represent the wind, waves, current, aerodynamic loads, hydrodynamic loads, and structural properties. It is helpful to understand which of these parameters ultimately drives a design. In this work, an ultimate and fatigue-proxy load sensitivity analysis was performed with 35 different input parameters, using an elementary effects approach to identify the most influential parameters for a case study involving the National Renewable Energy Laboratory (NREL) 5 MW baseline wind turbine atop the OC4-DeepCwind semisubmersible during normal operation. The importance of each parameter was evaluated using 14 response quantities of interest across three operational wind speed conditions. The study concludes that turbulent wind velocity standard deviation is the parameter with the strongest sensitivity; this value is important not just for turbine loads, but also for the global system response. The system center of mass in the wind direction is found to have the highest impact on the system rotation and tower loads. The current velocity is found to be the most dominating parameter for the system global motion and consequently the mooring loads. All tested wind turbulence parameters in addition to the standard deviation are also found to be influential. Wave characteristics are influential for some fatigue-proxy loading but do not significantly impact the extreme ultimate loads in these operational load cases. The required number of random seeds for stochastic environmental conditions is considered to ensure that the sensitivities are due to the input parameters and not due to the seed. The required number of analysis points in the parameter space is identified so that the conclusions represent a global sensitivity. The results are specific to the platform, turbine, and choice of parameter ranges, but the demonstrated approach can be applied widely to guide focus in parameter uncertainty.

17 WIND ENERGY↗

Unseen Winds: Harnessing High-Altitude Winds in the Southeast USA

This project aims to identify potential sites in the United States for further testing and development of airborne wind energy systems (AWES). Through industry questionnaires and interviews with AWES companies, the study assesses existing test sites' capabilities and gaps, leading to a three-tiered test site strategy: short-duration prototype demonstrations, long-duration technical assessments and power validations, and airspace interaction and deconfliction studies. Notably, the southeastern United States presents significant potential for AWES due to its lack of traditional wind turbines, which is attributed to low wind speeds at lower altitudes. However, wind conditions improve significantly at higher altitudes, making this region a promising candidate for AWES deployment. The project considers factors such as wind resources, infrastructure proximity, social acceptance, and environmental impacts to recommend sites that can support the unique needs of AWES manufacturers and facilitate their commercialization. Early findings suggest rural communities with low grid resiliency could benefit economically and technologically from hosting AWES test sites, especially with operator training centers and potential for long-term skilled employment in future disaster relief and other applications.

17 WIND ENERGY↗

REopt Lite User Manual

REopt Lite evaluates the economic viability of grid-connected solar photovoltaics, wind, combined heat and power, and electric and thermal storage at commercial and small industrial sites. It allows building owners to identify the system sizes and dispatch strategies that minimize the site’s life cycle cost of energy. REopt Lite also estimates the amount of time on-site generation and storage can sustain the site's critical load during a grid outage and allows the user the choice of optimizing for energy resilience. It is primarily used to inform project development decisions and to support research on the factors that drive project feasibility for market development and policy analysis. It is available through a web interface, application programing interface, and open-source code. This user manual provides an overview of the model, including its capabilities and typical applications; inputs and outputs; economic calculations; technology descriptions; and model parameters, variables, and equations. The model is highly flexible and is continually evolving to meet the needs of each analysis. Therefore, this report is not an exhaustive description of all capabilities, but rather a summary of the core components of the model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Randomized Projection for Rank-Revealing Matrix Factorizations and Low-Rank Approximations

Rank-revealing matrix decompositions provide an essential tool in spectral analysis of matrices, including the Singular Value Decomposition (SVD) and related low-rank approximation techniques. QR with Column Pivoting (QRCP) is usually suitable for these purposes, but it can be much slower than the unpivoted QR algorithm. For large matrices, the difference in performance is due to increased communication between the processor and slow memory, which QRCP needs in order to choose pivots during decomposition. Our main algorithm, Randomized QR with Column Pivoting (RQRCP), uses randomized projection to make pivot decisions from a much smaller sample matrix, which we can construct to reside in a faster level of memory than the original matrix. This technique may be understood as trading vastly reduced communication for a controlled increase in uncertainty during the decision process. Furthermore, for rank-revealing purposes, the selection mechanism in RQRCP produces results that are the same quality as the standard algorithm, but with performance near that of unpivoted QR (often an order of magnitude faster for large matrices). Additionally, we also propose two formulas that facilitate further performance improvements. The first efficiently updates sample matrices to avoid computing new randomized projections. The second avoids large trailing updates during the decomposition in truncated low-rank approximations. Our truncated version of RQRCP also provides a key initial step in our truncated SVD approximation, TUXV. These advances open up a new performance domain for large matrix factorizations that will support efficient problem-solving techniques for challenging applications in science, engineering, and data analysis.

97 MATHEMATICS AND COMPUTING↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗