Search NASA⌕ Search

SEARCH · Search NASA

Results for “project line partnership”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Offshore Wind Workforce Safety Standards and Training Resource

The standardization of safety training requirements for people working at sea to build and operate offshore wind energy projects, adoption of those standards, and alignment with offshore safety training curriculum development was identified as a high-priority workforce gap in the U.S. Offshore Wind Workforce Assessment (Stefek, 2022). Safety is a top priority for the offshore wind industry; however, there has been uncertainty surrounding what unique safety standards and training will be needed and how various offshore wind safety stakeholders will be involved. The scope of safety training for this resource includes workers who build and operate offshore wind energy projects at sea and defines the stakeholders in the complex ecosystem. This fact sheet aims to help reduce these uncertainties by: 1) Delineating jurisdictional lines, while clarifying roles and responsibilities amongst stakeholders; 2) Identifying key actions or partnerships that can encourage further success with safety training and workforce development.

offshore wind↗

Re-Envisioning RCx: Achieving Max Potential HVAC Controls Retrofits through Modernized BAS Hardware and Software

Most existing buildings have sub-optimal heating, ventilation, and air conditioning (HVAC) controls, resulting in wasted energy and occupant discomfort. Retro-commissioning (RCx) addresses many of these issues, but it is a lengthy and highly customized process. Limited capabilities of existing building automation system hardware restricts the scope of most RCx projects. Incentive programs consider building automation system (BAS) hardware retrofits to be high-capital investments and do not allow them in typical RCx programs. This paper describes work that the authors are leading to facilitate technical and market innovation in the BAS industry to unlock large savings in existing commercial buildings through deep retrofits of BAS hardware and software. California and New York research projects are demonstrating BAS retrofits leveraging the American Society of Heating, Refrigeration, and Air Conditioning Engineers’ (ASHRAE) new Guideline 36 high performance sequences of operation to achieve greater than 20 percent whole building energy savings, while saving costs and reducing risk through streamlined processes and standardization across BAS manufacturer product lines and across implementation practices. This paper describes market barriers that impede achieving deep savings from BAS retrofits in custom incentive and traditional RCx programs and presents a new maximum potential BAS retrofit model that addresses these barriers. The new model leverages the authors’ efforts in market enablement through open standards, BAS industry partnerships, and tools for cost-effective scaling that includes tools for project screening, savings calculations, and measurement and verification (M&V). This approach is widely applicable and will be ready for at-scale implementation within two years.

Paliaga, Gwelen↗

Igiugig Comprehensive Energy Plan Implementation Assistance

In 2023, the National Laboratory of the Rockies (NLR) partnered with the Renewable Energy Alaska Project (REAP) to provide technical assistance to Igiugig through the US Department of Energy's Energy Transitions Initiative Partnership Project (ETIPP). The overall objective of this ETIPP project was to provide technical support to help the community achieve their energy goal of reducing diesel fuel for electricity by 50% by 2030 through the implementation of high priority strategies defined in their 2022 Community Energy Plan. Technical support focused on evaluating additional renewables and renewable heating scenarios, identifying heat recovery system design options for high penetration renewables, investigation power quality and line loss issues, and supporting integration of battery energy storage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Best Practices for Equitable Solar Workforce Development

The Midwest Renewable Energy Association (MREA) was selected to serve as a lead organization for the U.S. Department of Energy Solar Energy Technology Office’s Equitable Solar Communities of Practice initiative. This project, facilitated through a partnership with ENERGYWERX, aimed to develop strategies to support the expansion of equitable benefits in solar adoption across the U.S. Specifically, the MREA was chosen to lead the solar workforce development community of practice, focusing on scaling the U.S. solar workforce, to meet growing industry demands and ensure that these opportunities are accessible and beneficial to all communities. For the purpose of this initiative, we define the solar workforce in line with the National Solar Jobs Census, which defines a solar worker as someone who spends a majority of their time on solar-related work. This also includes workers who spend a plurality of their time on solar tasks. It’s important to note that manufacturing jobs were not included in this research, as the focus is primarily on solar installation, development, and related roles. To achieve the goals of the Equitable Solar Communities of Practice initiative, the MREA leveraged existing resources and engaged a diverse core team and group of stakeholders including industry professionals, educators, policymakers, and community leaders. The MREA began with a literature review and gap analysis to identify existing best practices and gaps in the solar workforce. This was followed by a community convening to gather insights from a wide range of stakeholders. The findings informed the best practices and pathways to scale the benefits of solar workforce development, focusing on training programs, workforce services, apprenticeship, and justice, inclusion, and sustainability. This report outlines the background, methodology, findings, and conclusions drawn from the landscape and gap analysis, providing valuable insights into workforce needs and training program capacities across the U.S. The outcomes of this research are presented in this report and contain recommendations for optimizing workforce development and training funding to support the equitable growth of the solar industry, ensuring that the transition to solar energy is inclusive and beneficial for all communities.

14 SOLAR ENERGY↗

Expanding Collaborative Capacity to Address Climate Resiliency in the Great Lakes Region

U.S. Department of Energy (DOE), Office of Science, Award DE-SC0023215, Expanding Collaborative Capacity to Address Climate Resiliency in the Great Lakes Region, supported capacity and partnership building between researchers at Central Michigan University (CMU) and scientists at DOE laboratories. The work involved identifying potential collaborations both internal to CMU and between CMU researchers and DOE staff, developing collaborative research proposals, and partnering on pilot-scale research projects focused on enhancing resilience of Great Lakes communities, ecosystems, and infrastructure to global change and environmental stressors. DOE funds supported travel, time to develop collaborations, investigate new research pathways, and draft grant proposals, and a loan of DOE equipment to collect pilot data in support of future work. The project achieved its goal of strengthening research collaborations between interdisciplinary researchers at CMU and establishing new collaborations and partnerships between CMU and DOE scientists. These collaborations resulted in 5 pre-applications and 4 full applications for funding to DOE BER Funding Opportunities, a successfully funded DOE BER award (DE-SC0025260), a new pilot project that leveraged DOE resources (AquaBOT) to improve understanding of water quality conditions in Michigan rivers, and two presentations of preliminary results at national scientific conferences. This project’s outcomes will benefit the Great Lakes Region via new lines of collaborative research focused on improving the resilience of Michigan communities, ecosystems, and infrastructure.

58 GEOSCIENCES↗

Time-Lapse Vertical Seismic Profiling (VSP) for CO 2 Storage in a Depleted Oil Field in Northern Michigan

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. This report describes the Dover 33 VSP study to test the effectiveness of time-lapse Vertical Seismic Profile (VSP) for detecting and delineating a plume of more than 271,000 tonnes of CO2 injected into the Brown Niagaran and A-1 Carbonate formations within the Dover 33 reef between March 2013 and September 2016. Five 2D walkaway VSP (WVSP) source lines were acquired by SIGMA3 in September 2016 to investigate the possible time-lapse response in both P-wave and PS-wave seismic data. The data was compared to the same survey geometry acquired in March 2013 by SR2020. The seismic energy was recorded into an 80-level, three-component geophone array deployed into the Dover 1-33 well and placed just above the reef. P-wave and PS-wave reflection images were produced for each of the three source lines from both the 2013 baseline and 2016 monitor surveys. The images were then compared to look for changes in the reflectivity at and around the injection location that might indicate how the CO 2 has moved over this time period. This technique revealed several localized areas with sizable impedance differences inside the reef where CO 2 would be expected; however, a large number of similar impedance “hotspots” were also detected outside the reef in areas where injected CO 2 would not be expected. Therefore, a second analysis that involved calculating P-wave and S-wave travel time differences between the 2013 and 2016 VSPs was conducted to look for a change that could be caused by the CO 2 plume.

01 COAL, LIGNITE, AND PEAT↗

Deer Isle and Stonington Energy Reliability Opportunities

The towns of Deer Isle and Stonington, located on the island of Deer Isle in Maine, partnered with the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to examine options to enhance energy resilience, reduce dependence on imported fuels, and mitigate high energy costs. With technical support from the National Laboratory of the Rockies (NLR), Lawrence Berkeley National Laboratory (LBNL), and regional partner the Island Institute, the project focused on evaluation of the local electricity distribution infrastructure, examination of ongoing activities to reduce the frequency of outages, review of the applicable policy and regulatory environment, and identification of potential on-site energy solutions. Key findings revealed the island's reliance on a single distribution line, and limited hosting capacity for additional distributed energy resources. Solar photovoltaics (PV) technology, with and without battery storage, was found to be the most viable technology given economic, technical, and social considerations. While also technically feasible, wind energy faces more difficult siting and less public acceptance compared to PV. Marine energy technologies were determined to be infeasible due to technology immaturity and lengthy permitting timelines. Modeling of potential building-scale PV plus storage systems resulted in successful grant applications for installations at two local facilities. Analysis of community scale energy generation and storage options resulted the local utility, Versant, submitting a grant application for a proposed community-scale battery storage system to increase grid resilience and hosting capacity. This initiative has strengthened the communities' energy planning capabilities and laid the groundwork for future clean energy development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Deployment Readiness Framework Subtask 1.1 (Literature Review)

Island and remote coastal communities face some of the most challenging environments for building, operating, and maintaining energy infrastructure, as well as the highest costs for electricity, fuels, and other essential energy sources. As sea-levels rise and storms become more intense and frequent, these communities and the energy infrastructure that supports coastal lives and livelihoods are also at increasing risk from natural hazards. To address these challenges, many coastal communities are envisioning energy solutions that will support the triple bottom line goals of the blue economy: economic growth, environmental sustainability, and social equity. Yet, island and remote coastal communities often face limited resources and capacity to tackle complex energy and coastal resilience issues. To support community-driven energy transitions in island and remote communities, and to better understand relationships between energy, community, and ecosystem resilience, the Department of Energy’s Water Power Technologies Office (WPTO) has initiated the development of a Deployment Readiness Framework (DRF). The objective of the work is to co-produce and test practical tools and approaches that assess the readiness of coastal communities for marine energy demonstration, deployment, and operation. The DRF aims to build on and support the Energy Transitions Initiative Partnership Program (ETIPP) and other community-oriented energy transition programs. This project is jointly led by Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL). The development of the DRF includes three main phases: 1) a learning phase involving stakeholder engagement and literature review to synthesize metrics of community readiness to advance through an energy transition and to understand the state of the research and practice of participatory science-policy processes in various sectors, 2) a design phase to define readiness approaches and tools that will be developed as part of the DRF, and 3) an implementation phase to create the applications and interfaces for WPTO and the national laboratories to interact with the DRF. All three phases include close collaboration with communities and end-users of the framework, first to identify gaps in the science and tools needed to achieve community-driven energy transition goals and second, to test and improve the framework iteratively. Through technical assistance programs like ETIPP and utilizing the completed DRF to understand the influencing factors which motivate or deter energy transitions, WPTO hopes to engage a number of near-term marine energy demonstration opportunities. Here we report on the results from the literature review (Subtask 1.1) to inform the stakeholder engagement (Subtask 1.2) and design phase (Task 2) of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Southwest Wind Power R&D Test Site Development at the National Wind Technology Center (CRADA CRD-12-00472 Final Report)

Southwest Windpower, Inc. (SWWP) has been designing and distributing small wind turbines for more than 22 years and is the recognized global leader in the design, manufacturing and distribution of small wind systems (400-3000 watts). The company has been a pioneer in the development of wind technology and has built and shipped more than 170,000 wind turbines to over 120 countries worldwide. Headquartered in Flagstaff AZ, SWWP has sales representatives in over 88 countries. Applications for SWWP systems include residential homes, commercial properties, micro grids, remote cabins, telecom transmitters, offshore platforms, water pumping and sailboats. In addition, U.S. Department of Defense uses SWWP’s products in Forward Operating Bases (FOB’s), USGS uses them for remote monitoring of glacier movements and the CIA uses them to provide power seismic monitoring. Today, SWWP plans development of new technologies to address distributed energy market needs and become even more aggressive in international markets. This strategy includes extensive Research, Development, Demonstration & Deployment (RDD&D) activities to improve existing production line into more simple, reliable, and cost-effective wind turbine systems. Important part of such activities is the field testing of the new systems, which should provide: (i) validation of the reliable operation of hardware and software; (ii) validation of numerical models of the system and its components; (iii) field comparison of various control and optimization strategies; (iv) customized reliability testing; (v) customized monitoring and analysis testing; and (vi) IEC certification testing (vii) filed demonstration of system performance and reliability. Such field testing facility should encompass multiple towers and appropriate data acquisition systems. SWWP is exploring to move part of the engineering department to Colorado, and execute its RDD&D strategies in this new location. Partnership with NREL will provide great insights into SWWP’s RDD&D processes and more efficient commercialization by utilizing NWTC as the field testing site, and working close with NREL personnel. NWTC is ideally suited to strain the design. NREL is very experienced with customized and IEC testing. During this project, Southwest Windpower aims to improve the value proposition of distributed renewable energy, and make it a competitive choice in the energy markets. As of today, more then 170,000 small wind turbines, manufactured in the U.S., are installed in more then 180 countries. With the improved value proposition, Southwest Windpower wants to create and address new market needs, substantially increase its sales domestically and internationally, which should have positive impact on the creation of American jobs, competitiveness of U.S. economy, export or U.S. products, and the use of renewable energy.

17 WIND ENERGY↗

Assessing the cumulative effects of nearshore habitat restoration actions for multiple populations of juvenile salmon in Whidbey Basin, Washington: foundation and approach for synthesis and evaluation

Ecosystem restoration is a common tool for re-establishing ecosystem processes, structures, and functions to improve biodiversity and services in coastal and estuarine ecosystems. In the Salish Sea, salmon habitats have been fragmented, reduced in size, and diminished in quality, and the ecosystem processes that form and sustain these habitats have been degraded and disrupted as well. This loss is especially prevalent in estuaries, where up to 90% of former salmon habitat has been lost or compromised. Salmon species are integral to the identities and cultures of people in the Pacific Northwest, yet salmon abundances remain at historic lows, especially in urbanized areas. Recent investments in restoration are creating rearing habitat and repairing lost ecosystem function. However, restoration efforts in this region have largely proceeded at the site scale, with less attention to big-picture thinking regarding how restoration will effectively recover degraded or lost habitats for target species. As a result, no landscape-scale evaluation program exists, and the cumulative benefits of multiple interventions are unknown. We describe innovative methods for science synthesis related to the evaluation of cumulative effects of ecosystem restoration for Pacific salmon, using years of existing, but disparate data. Building from previous work on cumulative effects evaluation and incorporating a hierarchy of hypotheses approach, we propose using causal inference across numerous hypotheses in a framework to assess the cumulative benefits to Pacific salmon from multiple estuarine restoration projects. We present the framework as a method that can be used to address many complex questions and provide examples from the Salish Sea where the approach is being implemented. The framework draws on science synthesis from numerous fields and uses a hierarchy of hypotheses, causal analysis at multiple scales, and a new hierarchy of synthesis for assessing multiple lines of evidence documenting restoration effects on Pacific salmon. We propose causal inference to synthesize dissimilar data streams, in our case, to identify various manifestations of cumulative effects of restoration and benefits to salmon, and to further inform restoration and recovery planning. A unifying framework would allow for the detection of thresholds at which restoration provides measurable improvement and would greatly advance understanding of the effects of restoration on ecosystems.

59 BASIC BIOLOGICAL SCIENCES↗

Dynamic Building Load Control to Facilitate High Penetration of Solar Photovoltaic Generation (Final Technical Report)

Solar photovoltaic (PV) resources are the most common form of distributed generation in residential and commercial customer premises within electric distribution networks. A higher penetration of PV generation in distribution circuits will impose challenges on maintaining service voltages within the range of industry standards, power quality, and power flow. Buildings consume 74% of the electricity produced in the United States, and a significant portion of the building load is dispatchable, making them responsive to electrical grid needs. Oak Ridge National Laboratory—in collaboration with Southern Company; the University of Tennessee, Knoxville; and the Georgia Institute of Technology—is examining the PV integration issues in distribution-level electrical grids and developing integrated demand-side control and communication systems to enable responsive loads. The proposed responsive loads mechanism performs renewable generation following to increase the penetration of solar PV within each feeder. The specific objectives of this project are to (1) examine distribution-level PV integration scenarios to understand requirements, (2) undertake an end-to-end simulation-based design of a distributed control strategy of loads geographically near the PV generation asset to minimize the effect on the distribution feeder, (3) deploy and demonstrate the control technology developed in partnership with utilities, and (4) perform a scalability analysis at the utility scale. This 3-year integrated project aims to develop, demonstrate, and validate demand-side control technology to enable increased the penetration of renewables while mitigating challenges that arise due to their intermittency. Activities in Budget Period (BP) 1 focused on a literature review and the formal design of a control system for integrating local distribution with generation and loads. The team used modeling and simulation to evaluate the impact of varying buildings loads, variable PV generation, and power flow dynamics on the distribution circuit. The dynamic models developed in BP 1 were used in BP 2 to develop a model-based control design and a test bed. The test bed has enabled the simulation-based testing and comparison of different control designs and formulations applied to different configurations of the distribution grid, PVs, and building loads. The control approaches developed in BP 2 were implemented in BP 3 in the form of hardware deployed at the Central Baptist Church (CBC) in Knoxville, Tennessee, for testing and evaluation. The outcome of this project was the development and demonstration of open-source, low-cost, low-touch sensing and control retrofits to distributed PV generation and building loads that, in a coordinated fashion, provide the load-shaping response needed to integrate high levels of renewable penetration. This research addresses the target metrics by dynamically controlling a load with solar generation variability to minimize the extent of two-way power flow, enhance reliability, facilitate high PV penetration (>100% of peak load in a line segment), and generate scalable software and hardware solutions adaptable to any penetration levels. The research and development activities are focused and designed to be impactful within the relevant 2020 targets time frame.An accurate open-source integration simulation framework for end-to-end control design was developed and deployed at the CBC facility for testing and evaluation. This final report provides a detailed review of the technical results achieved during this 3-year integrated project. A novel spectral analysis of PV data is demonstrated to derive the requirements of the control design. A detailed simulation-based analysis of PV integration at increasing penetration levels is presented using 1 year of PV data to demonstrate the impact on the distribution circuits. Two different control strategies were developed and demonstrated via simulation to track variable PV generation with adaptive load dispatch. The report concludes with a summary of accomplishments and recommendations for a path forward.

14 SOLAR ENERGY↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

Improved Performance of Cu(InGa)(SeS) 2 PV Modules Using the Reaction of Metal Precursors. Final Report

This project “Improved Performance of Cu(InGa)(SeS) 2 PV Modules using the Reaction of Metal Precursors” was a partnership led by the Institute of Energy Conversion (IEC) at the University of Delaware with Columbia University and the Molecular Foundry at the Lawrence Berkeley National Laboratory. The aim was to develop pathways to improve Cu(InGa)(SeS) 2 (CIGSS) thin film photovoltaic modules using processes compatible with low manufacturing cost. The CIGSS approach investigated was a two-step process including deposition of metal precursor films following by reaction in hydride gases utilizing IEC’s novel reactor. The process was similar to that under commercial development by the project’s industry partner Stion. When Stion went out of business mid-project the focus changed to a rapid thermal process considered more commercially viable. Approaches to improve the performance of solar cells using the reacted films focused on two material innovations. First, the overall Ga content was increased to increase the operating voltage, which is desirable for scale-up to commercial modules. Second, the processing and performance advantages arising from Ag alloying were investigated. Advanced characterization guided process and material development including control of relative composition gradients. Research on the formation of Cu-Ga-In metal precursors utilized sputtering deposition which is normally used in commercial applications. The work resulted in processes for deposition of precursor stacks with increased relative Ga content and effects of deposition parameters on morphology and phase composition were established. It was shown that the metal precursor films have comparable phase composition and morphology so subsequent reaction follows from the same starting point. The addition of Ag to the metal precursors gave more uniform morphology and improved adhesion of reacted films which enable higher reaction temperature for faster processing. A novel outcome was the discovery of a previously undocumented material phase in sputter-deposited and evaporated Ag-Cu-In-Ga thin films. Hydride gas reaction processes including time-temperature-concentration profiles were developed for different precursor compositions. This enables control of composition profiles to engineer through-film gradients for solar cell optimization with characterization and simulations used to correlate measured film composition profiles to measurements of devices. In particular, the gradient of sulfur at the front of the CIGSS film was found to be critical. The simulations guided process development leading to improved reproducibility of devices improved performance with higher Ga content and higher voltage. With Ag-alloyed precursors, the reaction pathways leading were determined. A significant finding was that Ag-alloying increases the reaction rate to completely convert precursor films to the final chalcopyrite which could enable reduced reaction time to benefit manufacturability. To maintain potential commercial viability, the process under investigation was refocused to a rapid thermal process that could potentially be incorporated into an in-line process for manufacturing. Precursors with different composition were capped with an extra selenium layer and reacted in hydrogen sulfide 5-15 minutes, compared to typically 2 hours in the previous multi-step batch process. Critical RTP parameters were identified to control the reaction. Further optimization would be needed for high efficiency solar cells but pathways to high quality devices with further optimization and improved heating uniformity were developed. The project also developed new optoelectronic characterization approaches with a focus on development and application of spatial- and time-resolved photoluminescence and a custom mapping photoluminescence microscope built. It was shown how critical electronic transport properties strongly depend on the chemical composition of the material and that a wide range of samples show inhomogeneity on a length scale larger than the grains in the films. Additionally, two-photon excitation capability was developed to distinguish bulk vs surface losses. The project advances the state-of-the -art for precursor reaction processes in several ways that could impact manufacturing. This includes validation of approaches to increase voltage and establishment of model-guided control to form optimal composition profiles. The application of process control approaches with knowledge of phase formation and reaction pathways can be critically valuable in designing a large-scale process.

14 SOLAR ENERGY↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NRAP-Open-IAM: NRAP Open Source Integrated Assessment Model

Note: This is the last version (a2.6.1) of NRAP-Open-IAM released during NRAP Phase II in 2022. The latest version of NRAP-Open-IAM is available here: https://edx.netl.doe.gov/dataset/phase-iii-nrap-open-iam NRAP-Open-IAM is an open-source software product that enables quantification of containment effectiveness and leakage risk at storage sites in the context of system uncertainties and variability. NRAP-Open-IAM represents the next-generation in a line of systems-based computational models developed for quantitative geological carbon storage (GCS) risk assessment. The model comprises a set of reduced-order and analytical models of various components of the GCS system, potential leakage pathways, receptors of concern including impact to groundwater resources and the atmosphere, a framework to support stochastic simulation, time stepping, uncertainty quantification, other analytical functionality for scenario and risk-performance evaluation, and a basic graphical user interface to support scenario development, data input simulation definition, and basic post-processing and results display. As the NRAP Open-IAM functionality continues to evolve, we continue to add to its capability to develop quantitative, probabilistic, and time-dependent profiles of the evolution of risk at a GCS site and evaluate the influence of uncertain parameters on uncertainty in predicted risk. It can be used to quantify the dynamics of reservoir saturation plume and pressure-affected area, for evaluation of the area of potential groundwater impact (i.e., Area of Review) and monitoring requirements to support cost and regulatory analysis, and for consideration of different post-injection site care and closure scenarios. This submission contains the current version of NRAP-Open-IAM available for evaluation and testing. To use the NRAP-Open-IAM, download the source code (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/4c24a3da-3b40-4ffe-9892-c807ae9f8760) then open the NRAP-Open-IAM user's guide (https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669) to read more about the tool. Installation instructions for Windows, Mac, and Linux can be found in the "installers" folder of the extracted NRAP-Open-IAM folder and describe setup of environment (e.g., Python libraries) needed for proper work of the tool. Test of installation can be done by running "python openiam_setup_tests.py" in the "setup" folder. The installation test also runs a test suite to see if the NRAP-Open-IAM has been installed correctly. To run the test suite separately, run "python iam_test.py" in the "test" folder. User's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/8b27335a-343c-4836-b8a3-3ad0bdc9e669 Developer's guide: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/3bc6ee7d-609d-4eb6-80ba-fa6130ee0313 Reservoir simulation data used in some examples distributed with NRAP-Open-IAM: - Kimberlina: https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/eb62cece-61b2-4037-9b6d-32407dde2ab8 - Kimberlina (compartmentalized): https://edx.netl.doe.gov/dataset/08f396c8-bc5f-44ad-a028-6e98a6ea6d70/resource/366f9530-3b32-4b84-affe-ab2df1d9a8b5 - FutureGen 2.0: https://edx.netl.doe.gov/dataset/futuregen-2-0-1008-simulation-reservoir-lookup-table NRAP-Open-IAM GitLab repository: https://gitlab.com/NRAP/OpenIAM Related publications: - Bacon, D., Yonkofski, C., Brown, C., Demirkanli, D. and Whiting, J., 2019. Risk-based post injection site care and monitoring for commercial-scale carbon storage: Reevaluation of the FutureGen 2.0 site using NRAP-Open-IAM and DREAM. International Journal of Greenhouse Gas Control 90: 102784. - Bacon, D. Demirkanli, D., and White, S., 2020. Probabilistic risk-based Area of Review (AoR) determination for a deep-saline carbon storage site. International Journal of Greenhouse Gas Control 102: 103153. - Harp, D., Oldenburg, C., and Pawar, R., 2019. A metric for evaluating conformance robustness during geologic CO2 sequestration operations. International Journal of Greenhouse Gas Control 85: 100-108. - Lackey, G., Vasylkivska, V., Huerta, N., King, S., and Dilmore, R., 2019. Managing well leakage risks at a geologic carbon storage site with many wells, International Journal of Greenhouse Gas Control, 88 :182-194. - Vasylkivska, V., Dilmore, R., Lackey, G., Zhang, Y., King, S., Bacon, D., Chen, B., Mansoor, K., and Harp, D., 2021. NRAP-Open-IAM: A flexible open-source integrated assessment model for geologic carbon storage risk assessment and management, Environmental Modelling & Software, 143: 105114. Presentations: - Chen, B., Harp, D., and Pawar, R., A data assimilation approach (ES-MDA) coupling with NRAP-Open-IAM for quantifying uncertainty reduction in geological CO2 sequestration. AGUFM 2019: T44A-02. - Chen, B., and Harp, D., Improving risk analysis precision for geologic CO2 sequestration by quantifying the uncertainty reduction before and after acquiring monitoring data. 14th Greenhouse Gas Control Technologies Conference, Melbourne, Australia, 2018, pp. 21-26. - Harp, D., National Risk Assessment Partnership Task 2: Containment Assurance. No. LA-UR-19-28654, Los Alamos National Laboratory (LANL), Los Alamos, NM (United States), 2019. - Vasylkivska, V., King, S., Bacon, D., Harp, D., Chen, B., Mansoor, K., Onishi, T., Yang, Y., Zhang, Y., and Keating, E., NRAP-Open-IAM: An open-source integrated assessment model, poster, Mastering the Subsurface Through Technology Innovation, Partnerships and Collaboration: Carbon Storage and Oil and Natural Gas Technologies Review Meeting, Pittsburgh, PA, August 13-16, 2018. - Vasylkivska, V., Lackey, G., King, S., Wentworth, A., Huerta, N., Creason, C., DiGiulio, J., Yang, Y., and Dilmore, R., Long-term risk analysis of a geologic CO2 storage project during the post-injection period, SIAM Conference on Computational Science and Engineering, Spokane, WA, February 25-March 1, 2019. - Vasylkivska, V., Overview of the NRAP-Open-IAM tool for carbon storage (beta release), 2019 Annual NRAP Tool Users Meeting, Pittsburgh, PA, August 27, 2019. - Vasylkivska, V., Bacon, D., Chen, B., Dilmore, R., Harp, D., King, S., Lackey, G., Lindner, E., Liu, G., Mansoor, K. and Zhang, Y., NRAP-Open-IAM: A new, open-source code for integrated assessment of geologic carbon storage containment effectiveness and leakage risk, poster, American Geophysical Union Fall Meeting 2020 (virtual meeting), December 2020. - Vasylkivska, V., NRAP open-source integrated assessment model and relevant application, oral presentation, NRAP workshop "NRAP Tools for Geologic Carbon Storage Risk-Based Decision Making" held in conjunction with Groundwater Protection Council (GWPC) 2021 Annual Forum (virtual meeting), Salt Lake City, UT, September 2021. - Vasylkivska, V., NRAP-Open-IAM: open-source integrated assessment model, digital poster/demonstration, software demonstration session, 2022 Carbon Management Project Review Meeting, August 16, 2022

AoR↗