Search NASA⌕ Search

SEARCH · Search NASA

Results for “project planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Project Plan: Salt in Situ Heater Test

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project planned for the Waste Isolation Pilot Plant (WIPP) site, titled the Brine Availability Test in Salt (BATS). BATS is the first stage in a planned sequence of tests to bolster the technical basis for disposal of heat generating waste in salt. This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The experiment has begun in January 2020 and the first phase will continue for several months with the possibility for follow on testing. BATS comprises a suite of modular tests, which consist of a group of adjacent horizontal boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (12.2 cm [4.81 diameter) containing equipment for water-vapor collection and borehole closure monitoring, surrounded by smaller-diameter (up to 5.3 cm [2.11 diameter) satellite observation boreholes. Observation boreholes contain grouted-in temperature sensors, electrical resistivity tomography (ERT) sensors, and fiber optics; packer-isolated tracer release and sampling intervals; and acoustic emission (AE) piezoelectric sensors. A larger-diameter (12.2 cm [4.81) satellite borehole includes sorel and salt cement plugs, as part of an engineered barrier sealing test. The first two tests, to be implemented in parallel, are heated (target borehole wall temperature of 120 °C) and unheated, with similar arrays of observation borehole monitoring changes. Follow-on tests will be designed using information gathered from the first two tests, and may be conducted at other borehole wall temperatures, use multiple observation boreholes, and may include different measurement types and test designs. This 2020 update of the original 2018 project plan satisfies DOE-NE Spent Fuel and Waste Science and Technology (SFWST) milestone M3SF-205N010303034, as part of the SNL "Salt Disposal R&D" work package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ESGF project plan for ramping down development activities and transition the project and data to a new team

This document summarizes the current software development activities carried by the ESGF team with planned delivery dates before the transition of the project to a new team. The work we started on the publishing, search and retrieval, and the backend for indexing and data management that can be deployed using Kubernetes are planned to be delivered within the next three months; however, this assumes that the current team members will continue to work on the project. The activities are listed in Table 1 by priority and in case we lose team members, development of lower priority tasks can be paused and passed to the new team with its current status. Team members can be re-assigned based on their availability and transition work needed. Table 2 below describe activities necessary to help project transition to the new team. Deadlines for these activities are before October 1 st of 2022 or the completion of a successful transition. Support during the transition period assumes that we will have 3 key ESGF members and the ESGF PI supported at the 50% level or less for the duration of the transition. The level of support is an estimate, and it depends on several factors that cannot be decided at this time. The total cost of the proposed work and support activities for fiscal year 2021 is $1,270K with $230K carry over to fiscal year 2022. The cost for the support work listed in Table 2 is the sum of the two rows “HW support” and “project support, maintenance, and transition efforts”, colored blue, in Table1 which adds up to $720K. This cost is included in the $1,270K cost in table 1.

97 MATHEMATICS AND COMPUTING↗

Quality Assurance Project Plan for the Salish Sea Model – Continuing Development of New Capabilities and Applications: European Green Crab (EGC) Larval Transport, Coupling to VELMA and Atlantis, Performance Improvements and Diagnostic Applications

This quality assurance project plan (QAPP) is for proposed FY24-FY27 efforts to (a) develop/expand a predictive European Green Crab (EGC) larval dispersal model for the Salish Sea, (b) add linkage between VELMA (Visualizing Ecosystem Land Management Assessments) watershed model and Atlantis model (ecosystem dynamics and food web) through SSM, and (c) continue SSM capability development through the addition of metals, harmful algal blooms (HABs), and FVCOM-LTRANS (Lagrangian Larval Transport) modules.

54 ENVIRONMENTAL SCIENCES↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contribution of IN2P3 to PIP-II Project: Plans and Progress

IJCLab is one of the labs of IN2P3 (National institute of nuclear and particle physics), one of the ten research institutes composing the French National Center for Scientific Research (CNRS). Since 2018, IJCLab has been involved in the PIP-II project, assisting with the design, development, and qualification of accelerator components for the SSR2 (Single Spoke Resonator type 2) section of the superconducting linac. The first pre-production components (cavity, coupler, and tuner) have been fabricated, and some of the first qualification tests have been performed at IJCLab. This paper will summarize the complete scope of IJCLab¿s contributions to PIP-II and give updates on the performances of the first pre-production components.

43 PARTICLE ACCELERATORS↗

805 Stepped Plan Project Description

The 805 MHz system utilizes 1.25 MW class klystron amplifiers. The Solid-State Amplifier (SSA) technology has been utilized in the SC accelerator technology, but more powerful sources are needed for use in the NC accelerator facilities such as LASNCE. The SSA topologies that are widely used need to be scaled and tested for reliability and operation in a high impact accelerator facility, such as the 805 MHz SCCL in Los Alamos. Operational experience with high power SSA needs to be assessed prior to installation of an SSA unit at LANSCE. The RFE group at LANSCE is looking for collaboration in the development of the Solid-State Amplifier.

43 PARTICLE ACCELERATORS↗

Project Planning for Community Resilience: Aquinnah and Chilmark, Massachusetts

This report presents the findings of an energy system planning study for the towns of Aquinnah and Chilmark, MA, on the island of Martha’s Vineyard, conducted under the U.S. Department of Energy ETIPP program. The study used the DER-CAM model to optimize the deployment of PV and battery microgrids to enhance energy resilience against power outages, particularly winter storms. Key findings show that PV is highly cost-effective and delivers net annual savings. However, due to limited rooftop space and low winter solar output, PV and battery storage alone cannot support the full critical load during outages. Solutions incorporating conventional backup generators were found to be more economically viable for achieving 100% critical load support.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

GIF-VHTR Materials (Graphite) Project Plan: Progress since September 2021

¦1: Data, Design Methodology and Construction 1.1: Graphite Selection and Acquisition Strategy (Original tasks completed) 1.2: Graphite Properties (Virgin Materials) 1.3: Graphite Fracture Behaviour(Original tasks completed) 1.4: Graphite Oxidation Behaviour(Original tasks completed) 1.5: Graphite Component Testing 1.6: Graphite Irradiation Effects 1.7: Graphite Irradiation Induced Creep 1.8: Graphite Codes and Standards Development (ASME & ASTM) 1.9: Graphite BehaviourModels Development 1.10: Links to Existing Graphite Irradiation BehaviourDatabases 1.11: Materials Database ¦2: Operation and Inspection 2.1: Methodologies for determining requirements for inspection of graphite cores 2.2: Methodologies for ISI of graphite cores ¦3: Decommissioning and Disposal (New task added 2021) 3.1: Technical data for decommissioning and disposal issues

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TCCSP Project Implementation Plan

The TCCSP CarbonSAFE Phase II efforts focused on developing the technical, community, and economic foundation for a commercial-scale regional geologic storage complex for CO 2 captured. TCCSP has conducted a thorough evaluation of the regional, local, and site-specific geology, legacy well infrastructure, injection site design, and project planning as part of the CarbonSAFE Phase II TCCSP. Specially, the work performed under the CarbonSAFE Phase II has significantly furthered the advancement towards the commerciality of the TCCSP storage complex by delivering on the following objectives: Objective 1: Acquire site-specific characterization data to validate carbon dioxide (CO 2 ) storage estimates of reservoir units and the competency of confining layers in the region to prevent CO 2 leakage to develop a commercial-scale CO 2 project. Objective 2: Assess technical, economic, regulatory, and stakeholder aspects of the TCCSP.

54 ENVIRONMENTAL SCIENCES↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Global wave energy resource classification system for regional energy planning and project development

Efforts to streamline and codify wave energy resource characterization and assessment for regional energy planning and wave energy converter (WEC) project development have motivated the recent development of resource classification systems. Given the unique interplay between WEC absorption and resource attributes, viz, available wave power frequency, directionality, and seasonality, various consensus resource classification metrics have been introduced. However, the main international standards body for the wave energy industry has not reached consensus on a wave energy resource classification system designed with clear goals to facilitate resource assessment, regional energy planning, project site selection, project feasibility studies, and selection of WEC concepts or archetypes that are most suitable for a given wave energy climate. In this work, a primary consideration of wave energy generation is the available energy that can be captured by WECs with different resonant frequency and directional bandwidths. Therefore, the proposed classification system considers combinations of three different wave power classifications: the total wave power, the frequency-constrained wave power, and the frequency-directionally constrained wave power. The dominant wave period bands containing the most wave power are sub-classification parameters that provide useful information for designing frequency and directionally constrained WECs. The bulk of the global wave energy resource is divided into just 22 resource classes representing distinct wave energy climates that could serve as a common language and reference framework for wave energy resource assessment if codified within international standards.

16 TIDAL AND WAVE POWER↗

Update on Nuclear Energy Projects and Plans in Ukraine (Meeting Report)

Following the 1986 disastrous accident at Chernobyl, gaining independence following the fall of the former Soviet Union, two revolutions, and on-going Russian intervention, Ukrainea is seeking to expand its use of commercial nuclear energy and to further reduce its dependence on Russia for energy. Nuclear energy in Ukraine has made a significant contribution toward achieving sustainable development and social goals. Ukraine is very vulnerable to the effects of climate change and nuclear is a cornerstone of the country’s effort to combat the effects. With broad support from the U.S. government, Ukraine is cooperating with the U.S. on fresh nuclear fuel supply, civilian nuclear security, outage optimization, spent fuel storage, and future nuclear technology. And is looking to tap U.S. expertise on plant management, and electric grid operations and expansion. NEIc hosted this virtual event to provide an update on nuclear energy projects and plans in Ukraine. Featured speakers included Yaroslav Demchenkov, Deputy Minister of Energy, Taras Kachka, Deputy Minister – Trade Representative, Petro Kotin, CEO, Energoatom,d and Ann K. Ganzer, Senior Bureau Official, Bureau of International Security and Nonproliferation, U.S. Dept. of State. Maria Korsnick, NEI CEO, moderated the discussion. About forty individuals attended representing the Ukraine and U.S. governments, and U.S. suppliers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗