Search NASA⌕ Search

SEARCH · Search NASA

Results for “project status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

FY 2020 Radionuclide Migration Project Status

The Waste Management Project provides safe, compliant, and cost-effective waste management services for the Hanford Site and the U.S. Department of Energy (DOE) complex. Part of these services includes safe disposal of low-level waste and mixed low-level waste at the Hanford Low-Level Waste Burial Grounds in accordance with the requirements of DOE Order 435.1, Radioactive Waste Management. To partially satisfy these requirements, performance assessment analyses were completed and approved. DOE Order 435.1 also requires continuing data collection to increase confidence in the critical assumptions used in these analyses to characterize the operational features of the disposal facility that are relied on to satisfy the performance objectives identified in the order.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

dCache project status and update

The dCache project delivers an open-source, massively scalable, distributed storage system deployed internationally to satisfy today’s scientists’ ever-demanding storage requirements. Its multifaceted approach supports different use cases with the same storage, from high throughput data ingest, data sharing over wide area networks, efficient access from HPC clusters, and longterm data persistence on tertiary storage. Even though dCache was initially developed for HEP experiments, today, it is used by various scientific communities, including astrophysics, biomed, and life science, each with their specific requirements. To match the needs of these new communities and keep up with the scaling demands of existing experiments, dCache is permanently evolving. With this contribution, we would like to highlight the recent developments in dCache regarding integration with CERN Tape Archive (CTA), advanced metadata handling, token-based authorization support, bulk API for QoS transitions, REST API to control interaction with the tape system, and future development directions.

Mkrtchyan, Tigran [DESY]↗

The EGS Collab Project: Status and Accomplishments

The EGS Collab project, supported by the US Department of Energy, is addressing challenges in implementing enhanced geothermal systems (EGS). This includes improving understanding of the stimulation of crystalline rock to create appropriate flow pathways, and the ability to effectively simulate both the stimulation and the flow and transport processes in the resulting fracture network. The project is performing intensively monitored rock stimulation and flow tests at the 10-m scale in an underground research laboratory. Data and observations from the field test are compared to simulations to understand processes and to build confidence in numerical modeling of the processes. In Experiment 1, we examined hydraulic fracturing an underground test bed at the Sanford Underground Research Facility (SURF) in Lead, South Dakota, at a depth of approximately 1.5 km. We drilled eight sub-horizontal boreholes in a well-characterized phyllite. Six of the boreholes were instrumented with many sensor types to allow careful monitoring of stimulation events and flow tests, and the other two boreholes were used for water injection and production. We performed a number of stimulations and flow tests in the testbed. Our monitoring systems allowed detailed observations and collection of numerous data sets of processes occurring during stimulation and during dynamic flow tests. Long-term ambient temperature and chilled water flow tests were performed in addition to many tracer tests to examine system behavior. Data were rapidly analyzed, allowing adaptive control of the tests. Numerical simulation was used to answer key experimental design questions, to forecast fracture propagation trajectories and extents, and to analyze and evaluate results. Many simulations were performed in near-real-time in conjunction with the field experiments, with more detailed process study simulations performed on a longer timeframe. Experiment 2 will examine hydraulic shearing in a test bed being built at the SURF at a depth of about 1.25 km in amphibolite under a different set of stress and fracture conditions than Experiment 1. Five sets of fracture orientations were considered in design, and three orientations seem to be consistently observed.

EGS Collab↗

Automated Ride Hailing - Status, Projections, and Critical Safety Review

Automated ride-hailing services, commonly known as 'robo-taxis' are beginning to proliferate and scale. Currently they are available in four major US cities with another 10 cities planning their implementation in the near future. In the US, automated ride-hailing services are dominated by a single provider, with announcements from several competitors of service offerings by end of calendar year 2025. Internationally, only three companies are currently in commercial operations, with many more planned. The scaling of robo-taxi services appears to be the leading application of automated vehicles (AVs), and provides evidence of their anticipated safety in comparison to conventional vehicles. This presentation will provide an overview of the status of deployments of fully operational AVs in ride-hailing services, projections of the number of trips, vehicles, and vehicle miles traveled for the immediate future, and a critical review of the safety data that has been reported, both in the US as well as internationally.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CoMET Project Status and Accomplishments

FY2020 status report on the 'Combined Materials Experiment Toolkit (CoMET)' software application for the annual program review of the Nuclear Science User Facilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Observations for Model Intercomparison Project (Obs4MIPs): status for CMIP6

The Observations for Model Intercomparison Project (Obs4MIPs) was initiated in 2010 to facilitate the use of observations in climate model evaluation and research, with a particular target being the Coupled Model Intercomparison Project (CMIP), a major initiative of the World Climate Research Programme (WCRP). To this end, Obs4MIPs (1) targets observed variables that can be compared to CMIP model variables; (2) utilizes dataset formatting specifications and metadata requirements closely aligned with CMIP model output; (3) provides brief technical documentation for each dataset, designed for nonexperts and tailored towards relevance for model evaluation, including information on uncertainty, dataset merits, and limitations; and (4) disseminates the data through the Earth System Grid Federation (ESGF) platforms, making the observations searchable and accessible via the same portals as the model output. Taken together, these characteristics of the organization and structure of obs4MIPs should entice a more diverse community of researchers to engage in the comparison of model output with observations and to contribute to a more comprehensive evaluation of the climate models. At present, the number of obs4MIPs datasets has grown to about 80; many are undergoing updates, with another 20 or so in preparation, and more than 100 are proposed and under consideration. A partial list of current global satellite-based datasets includes humidity and temperature profiles; a wide range of cloud and aerosol observations; ocean surface wind, temperature, height, and sea ice fraction; surface and top-of-atmosphere longwave and shortwave radiation; and ozone (O 3 ), methane (CH 4 ), and carbon dioxide (CO 2 ) products. A partial list of proposed products expected to be useful in analyzing CMIP6 results includes the following: alternative products for the above quantities, additional products for ocean surface flux and chlorophyll products, a number of vegetation products (e.g., FAPAR, LAI, burned area fraction), ice sheet mass and height, carbon monoxide (CO), and nitrogen dioxide (NO 2 ). While most existing obs4MIPs datasets consist of monthly-mean gridded data over the global domain, products with higher time resolution (e.g., daily) and/or regional products are now receiving more attention. Along with an increasing number of datasets, obs4MIPs has implemented a number of capability upgrades including (1) an updated obs4MIPs data specifications document that provides additional search facets and generally improves congruence with CMIP6 specifications for model datasets, (2) a set of six easily understood indicators that help guide users as to a dataset's maturity and suitability for application, and (3) an option to supply supplemental information about a dataset beyond what can be found in the standard metadata. With the maturation of the obs4MIPs framework, the dataset inclusion process, and the dataset formatting guidelines and resources, the scope of the observations being considered is expected to grow to include gridded in situ datasets as well as datasets with a regional focus, and the ultimate intent is to judiciously expand this scope to any observation dataset that has applicability for evaluation of the types of Earth system models used in CMIP.

54 ENVIRONMENTAL SCIENCES↗

Panel Session 120: Roundtable: Waste Management - Energy Facilities Contractor Operating Group (EFCOG WM)

This Roundtable focused on the WM EFCOG working group as they met to discuss a variety of issues of importance to US DOE waste management operations. The purpose of the WM EFCOG is to seek out and promote the best management and operating practices, cost effective technologies and disposal options for all waste streams generated at US DOE facilities whether destined for US DOE or commercial facilities. Each site representative provided a radioactive waste management lessons learned briefing. Panelists with presentations: Savannah River Site (SRS) Solid Waste Program Update (Kerri Crawford); Idaho Clean-up Project Status (Frederick Hughes); West Valley Demonstration Project Update - EFCOG Waste Management Working Group (John Rendall); Key Project Challenges and Successes (Kalli Shupe); EFCOG WMWG Challenging Waste Subgroup Update (Tammy Monday); CH TRU Difficult Waste Stream Processing Challenges (Daniel Pancake); Argonne Building 350 Clean-up Success Using Effective Work Control (Daniel Dilday); Problematic Waste Streams on the Oak Ridge Reservation (John Wrapp)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Geothermal District Heating Systems and Funding Data

This dataset contains detailed information on geothermal district heating (GDH) systems across the United States, including technical specifications, costs, energy usage, and funding sources. Data includes system details such as state, site, location, operational years, temperature, flow rate, capacity, energy use, load factor, costs (original, updated, and operational), funding sources, employment impact, and project status. Additionally included are contributions to GDH systems, including federal, state, and local grants, as well as loans from agencies such as USDA and USDOE. This dataset serves as a resource for analyzing the economic and technical landscape of geothermal district heating in the United States.

15 GEOTHERMAL ENERGY↗

Systems Innovation: Modernization & Efficiencies for ESH&Q Reviews

Environmental compliance reviews at INL have traditionally been managed through fragmented systems, relying on multiple spreadsheets and manual processes. This inefficiency led to time-consuming status updates and redundant tasks, such as manually sending reminder emails and transferring data from Excel to the Environmental Review Process (ERP). Initial attempts to streamline these processes using Power Automate and Excel revealed significant limitations, necessitating a more comprehensive solution. To address these immediate inefficiencies, automated workflows were developed using Power Automate. These workflows were designed to send scheduled status update reminders and capture responses through standardized forms, with submitted data flowing directly into centralized Excel trackers. This automation reduced the administrative burden, improved data accuracy, and enabled faster, more consistent reporting. Specifically, email automation achieved a 65% efficiency gain, while data integration saw a 48% improvement, resulting in 91% of project statuses being updated within two months. Despite the improvements brought by Power Automate, the fragmented nature of the review processes persisted. To further enhance efficiency and accuracy, the Integrated Review Tool (IRT) was developed. The IRT aims to centralize review initiation and connect team systems, creating an interconnected data infrastructure that preserves team autonomy while enhancing overall efficiency. This tool automates email reminders, centralizes reviews, and streamlines data integration, significantly improving the accuracy and efficiency of environmental compliance reviews. The design and development of the IRT involved advanced systems methodology, process mapping, project management, and collaboration with subject matter experts. The minimum viable product design is 100% complete, and system development is currently underway, with expected outcomes including a centralized entry point for all ESH&Q reviews, automated routing, real-time tracking and analytics, AI integration, and a user-friendly interface. This project demonstrates the potential of leveraging automation and integrated systems to enhance efficiency, accuracy, and decision-making in environmental reporting and compliance processes at INL.

99 - GENERAL AND MISCELLANEOUS↗