Search NASA⌕ Search

SEARCH · Search NASA

Results for “quarterly reports”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Applied Meteorology Unit (AMU) Quarterly Report - Fourth Quarter FY-09

This report summarizes the Applied Meteorology Unit (AMU) activities for the fourth quarter of Fiscal Year 2009 (July - September 2009). Tasks reports include: (1) Peak Wind Tool for User Launch Commit Criteria (LCC), (2) Objective Lightning Probability Tool. Phase III, (3) Peak Wind Tool for General Forecasting. Phase II, (4) Update and Maintain Advanced Regional Prediction System (ARPS) Data Analysis System (ADAS), (5) Verify MesoNAM Performance (6) develop a Graphical User Interface to update selected parameters for the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLlT)

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report Third Quarter FY-08

This report summarizes the Applied Meteorology Unit (AMU) activities for the third quarter of Fiscal Year 2008 (April - June 2008). Tasks reported on are: Peak Wind Tool for User Launch Commit Criteria (LCC), Anvil Forecast Tool in AWIPS Phase II, Completion of the Edward Air Force Base (EAFB) Statistical Guidance Wind Tool, Volume Averaged Height Integ rated Radar Reflectivity (VAHIRR), Impact of Local Sensors, Radar Scan Strategies for the PAFB WSR-74C Replacement, VAHIRR Cost Benefit Analysis, and WRF Wind Sensitivity Study at Edwards Air Force Base

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report. First Quarter FY-05

This report summarizes the Applied Meteorology Unit (AMU) activities for the first quarter of Fiscal Year 2005 (October - December 2005). Tasks reviewed include: (1) Objective Lightning Probability Forecast: Phase I, (2) Severe Weather Forecast Decision Aid, (3) Hail Index, (4) Stable Low Cloud Evaluation, (5) Shuttle Ascent Camera Cloud Obstruction Forecast, (6) Range Standardization and Automation (RSA) and Legacy Wind Sensor Evaluation, (7) Advanced Regional Prediction System (ARPS) Optimization and Training Extension, and (8) User Control Interface for ARPS Data Analysis System (ADAS) Data Ingest

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report First Quarter FY-04

This report summarizes the Applied Meteorology Unit (AMU) activities for the First Quarter of Fiscal Year 2004 (October - December 2003). Tasks reviewed are: (1) Objective Lightning Probability Forecast, (2) Mesonet Temperature and Wind Climatology, (3) Severe Weather Forecast Decision Aid and (4) Anvil Transparency Relationship to Radar Reflectivity

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report Fourth Quarter FY-04

This report summarizes the Applied Meteorology Unit (A MU) activities for the fourth quarter of Fiscal Year 2004 (July -Sept 2004). Tasks covered are: (1) Objective Lightning Probability Forecast: Phase I, (2) Severe Weather Forecast Decision Aid, (3) Hail Index, (4) Shuttle Ascent Camera Cloud Obstruction Forecast, (5) Advanced Regional Prediction System (ARPS) Optimization and Training Extension and (5) User Control Interface for ARPS Data Analysis System (ADAS) Data Ingest.

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report Fourth Quarter FY-14

Ms. Crawford completed the final report for the dual-Doppler wind field task. Dr. Bauman completed transitioning the 915-MHz and 50-MHz Doppler Radar Wind Profiler (DRWP) splicing algorithm developed at Marshall Space Flight Center (MSFC) into the AMU Upper Winds Tool. Dr. Watson completed work to assimilate data into model configurations for Wallops Flight Facility (WFF) and Kennedy Space Center/Cape Canaveral Air Force Station (KSC/CCAFS). Ms. Shafer began evaluating the a local high-resolution model she had set up previously for its ability to forecast weather elements that affect launches at KSC/CCAFS. Dr. Watson began a task to optimize the data-assimilated model she just developed to run in real time.

Applied Meteorology Unit↗

Applied Meteorology Unit (AMU) Quarterly Report - Fourth Quarter FY-10

Three AMU tasks were completed in this Quarter, each resulting in a forecast tool now being used in operations and a final report documenting how the work was done. AMU personnel completed the following tasks (1) Phase II of the Peak Wind Tool for General Forecasting task by delivering an improved wind forecasting tool to operations and providing training on its use; (2) a graphical user interface (GUI) she updated with new scripts to complete the ADAS Update and Maintainability task, and delivered the scripts to the Spaceflight Meteorology Group on Johnson Space Center, Texas and National Weather Service in Melbourne, Fla.; and (3) the Verify MesoNAM Performance task after we created and delivered a GUI that forecasters will use to determine the performance of the operational MesoNAM weather model forecast.

Bauman, William↗

Applied Meteorology Unit (AMU) Quarterly Report Third Quarter FY · 13

The AMU team worked on seven tasks for their customers: (1) Ms. Crawford completed the objective lightning forecast tool for east -central Florida airports and delivered the tool and the final report to the customers. (2) Ms. Shafer continued work for Vandenberg Air Force Base on an automated tool to relate pressure gradients to peak winds. (3) Dr. Huddleston updated and delivered the tool that shows statistics on the timing of the first lightning strike of the day in the Kennedy Space Center (KSC)/Cape Canaveral Air Force Station (CCAFS) area. (4) Dr. Bauman continued work on a severe weather forecast tool focused on the Eastern Range (ER). (5) Ms. Crawford acquired the software and radar data needed to create a dual-Doppler analysis over the east-central Florida and KSC/CCAFS areas. (6) Mr. Decker continued developing a wind pairs database for the Launch Services Program to use when evaluating upper-level winds for launch vehicles. (7) Dr. Watson continued work to assimilate observational data into the high-resolution model configurations she created for Wallops Flight Facility and the ER.

Bauman, William↗

Applied Meteorology Unit Quarterly Report. First Quarter FY-13

The AMU team worked on five tasks for their customers: (1) Ms. Crawford continued work on the objective lightning forecast task for airports in east-central Florida. (2) Ms. Shafer continued work on the task for Vandenberg Air Force Base to create an automated tool that will help forecasters relate pressure gradients to peak wind values. (3) Dr. Huddleston began work to develop a lightning timing forecast tool for the Kennedy Space Center/Cape Canaveral Air Force Station area. (3) Dr. Bauman began work on a severe weather forecast tool focused on east-central Florida. (4) Dr. Watson completed testing high-resolution model configurations for Wallops Flight Facility and the Eastern Range, and wrote the final report containing the AMU's recommendations for model configurations at both ranges.

Source record↗