Search NASA⌕ Search

SEARCH · Search NASA

Results for “rapid-cycling accelerator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Consideration of HTS rapid-cycling magnet for staged muon acceleration

The HTS conductor hysteresis dominates magnet cable power loss but is independent of the magnetic field ramping rate. This makes the HTS conductor suitable to power the rapid-cycling accelerator magnet. We present a possible application of the HTS rapid-cycling magnet as outlined in [1,2] for the staged muon acceleration including the front-end Recirculating Linear Accelerator and the followed-up Rapid Cycling Synchrotrons delivering the muon beams to the Muon Collider.[1] H. Piekarz, S. Otten, A. Kario, H. ten Kate, “Rapid-cycling HTS magnet for muon acceleration”, US MC Inaugural Meeting, FERMILAB-POSTER-24-0219-AD, August 7-9, 2024[2] H. Piekarz, B. Claypool, S. Hays, M. Kufer, V. Shiltsev, “Record High Ramping Rates in HTS Based Supercond. Accelerator Magnet”, MT 27, IEEE Trans. on Applied Superccond, 32 (2022) 6, 4100404

Piekarz, Henryk [Fermilab]↗

Rapid-cycling HTS magnet for muon acceleration

A very wide range of operational temperatures of the HTS (YBCO) superconductor makes it suitable for the construction of rapid-cycling magnets required for the muon acceleration. The measured [3] very low power loss of the 0.4 T magnet operating at 300 T/s suggested a realistic possibility of the HTS-based accelerator magnet with much higher magnetic field and ramp rate. The magnet core and the HTS cable designs for the 2 T field in the 30 mm beam gap are presented. The simulation of the HTS cable hysteresis power loss for the 1000 T/s ramp rate is discussed in terms of the operational temperatures and required cryogenic power.

43 PARTICLE ACCELERATORS↗

Consideration of REBCO Rapid-Cycling Diple Magnet for Staged Muon Acceleration

A possible application of the HTS (ReBCO) rapid-cycling dipole magnet [1] in the first stages of muon acceleration consisting of Recirculating Linear Accelerator (RLA) and followed-up first Rapid Cycling Synchrotron (RCS-1) is presented. The projected ReBCO magnet hysteresis loss is discussed in terms of the liquid helium coolant choice and the option with the striated ReBCO conductor for the further significant reduction of the hysteresis power loss.

Piekarz, Henryk [Fermilab] (ORCID:0000000194225662↗

Rapid-cycling ReBCO dipole magnet concept for muon acceleration

We present a concept of the rapid-cycling 1.7 T ReBCO magnet for 1 to 10 kT/s ramping range as required for muon acceleration in a future muon collider presently under study. This approach is based on the 6 kA CORC-like cable constructed with 12 superconducting ReBCO tapes of 2 mm width. Based on theoretical prediction there is a linear scaling of the ReBCO cable hysteresis loss with the crossing magnetic field possibly generating power loss independent of the magnetic field ramping speed. This feature makes this ReBCO cable suitable for the construction of rapid-cycling magnets. In this work we outline the design of a dipole magnet for 1.7 T gap magnetic field and discuss the helium coolant parameters for the minimal electric power.

Piekarz, Henryk [Fermilab] (ORCID:0000000194225662↗

Rapid Cycling ReBCO Dipole Magnet Concept for Muon Acceleraion

We present a concept of the rapid-cycling 1.7 T ReBCO magnet for 1 to 10 kT/s ramping range as required for muon acceleration in a future muon collider presently under study. This approach is based on the 6 kA CORC-like cable constructed with 12 superconducting ReBCO tapes of 2 mm width. Based on theoretical prediction there is a linear scaling of the ReBCO cable hysteresis loss with the crossing magnetic field possibly generating power loss independent of the magnetic field ramping speed. This feature makes this ReBCO cable suitable for the construction of rapid-cycling magnets. In this work we outline the design of a dipole magnet for 1.7 T gap magnetic field and discuss the helium coolant parameters for the minimal electric power.

Piekarz, Henryk [Fermilab] (ORCID:0000000194225662↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗

Adaptation of the Fermilab proton source to support new muon facilities

The PIP-II proton accelerator will provide the intensity sufficient to power a new generation of high energy facilities at Fermilab. Extension of that linac to higher energy with following acceleration and bunching rings could provide the intensity needed to feed a muon production target for a high-energy $\mu^{+} - \mu^{-}$ collider. Scenarios using a rapid-cycling synchrotron or an $\sim$8 GeV Linac are presented and discussed. Some near-term opportunities at Fermilab for muon collider R\&D are introduced.

43 PARTICLE ACCELERATORS↗

Adaptation of the Fermilab Proton Source to Support New Muon Facilities

he PIP-II proton accelerator will provide the intensity sufficient to power a new generation of high energy facilities at Fermilab. Extension of that linac to higher energy with following acceleration and bunching rings could provide the intensity needed to feed a muon production target for a high-energy $\mu^{+} - \mu^{-}$ collider. Scenarios using a rapid-cycling synchrotron or an $\sim$8 GeV Linac are presented and discussed. Some near-term opportunities at Fermilab for muon collider R&D are introduced.

43 PARTICLE ACCELERATORS↗

FNAL PIP-II Accumulator Ring

The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.

43 PARTICLE ACCELERATORS↗

Derivative-free optimization of a rapid-cycling synchrotron

Here, we develop and solve a constrained optimization model to identify an integrable optics rapid-cycling synchrotron lattice design that performs well in several capacities. Our model encodes the design criteria into 78 linear and nonlinear constraints, as well as a single nonsmooth objective, where the objective and some constraints are defined from the output of Synergia, an accelerator simulator. We detail the difficulties of the 23-dimensional simulation-constrained decision space and establish that the space is nonempty. We use a derivative-free manifold sampling algorithm to account for structured nondifferentiability in the objective function. Our numerical results quantify the dependence of solutions on constraint parameters and the effect of the form of objective function.

43 PARTICLE ACCELERATORS↗

An 8 GeV Linac as the booster replacement in the Fermilab Power Upgrade [Slides]

Increasing the Fermilab Main Injector beam power available to the high-energy neutrino experiments above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Rapid-cycling synchrotron and Linac solutions were considered for this purpose. We consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring or Main Injector. The new Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~8 GeV in SRF structures. The Linac components incorporate recent improvements in SRF technology.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

An 8 GEV Linac As The Booster Replacement In The Fermilab Power Upgrade

Increasing the Fermilab Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Earlier, rapid-cycling synchrotron and linac solutions were considered for this purpose. In this paper, we consider the linac version that produces 8 GeV H- beam for injection into the Recycler Ring (RR) or MI The new linac takes ~1 GeV beam from the PIP-II linac and accelerates it to ~ 2 GeV in a 650 MHz SRF linac, and then accelerates to ~8 GeV in an SRF pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. This Booster Replacement linac (BRL) will increase MI beam power to DUNE to more than 2.5 MW and enable next-generation intensity frontier experiments.

Neuffer, David V.↗

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. Previously, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H⁻ beam for injection into the Recycler Ring (RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a cw SRF linac, followed by a ~2-8 GeV pulsed linac using 1300 MHz cryomodules. The linac components incorporate recent improvements in SRF technology. The linac configuration and beam dynamics requirements are presented. Injection options are discussed. Research needed to implement the Booster replacement is described.

Neuffer, David V.↗

An 8 GeV Linac as the Booster Replacement in the Fermilab Power Upgrade

Increasing the Main Injector (MI) beam power above ~1.2 MW requires replacement of the 8 GeV Booster by a higher intensity alternative. In the Project X era, rapid-cycling synchrotron (RCS) and Linac solutions were considered for this purpose. In this paper, we consider the Linac version that produces 8 GeV H- beam for injection into the Recycler Ring(RR) or Main Injector (MI). The Linac takes ~1 GeV beam from the PIP-II Linac and accelerates it to ~2 GeV in a 650MHz SRF Linac, followed by a ~2-8 GeV pulsed Linac using 1300 MHz cryomodules. The Linac components incorporate recent improvements in SRF technology. The Linac configuration and beam dynamics requirements are presented. Injection options are discussed. Foil-based injection is the present standard but R&D toward implementing laser-assisted injection could enable a significant improvement. Research needed to implement the Booster replacement is described.

42 ENGINEERING↗

BOOSTR: A Dataset for Accelerator Control Systems

The Booster Operation Optimization Sequential Time-series for Regression (BOOSTR) dataset was created to provide a cycle-by-cycle time series of readings and settings from instruments and controllable devices of the Booster, Fermilab’s Rapid-Cycling Synchrotron (RCS) operating at 15 Hz. BOOSTR provides a time series from 55 device readings and settings that pertain most directly to the high-precision regulation of the Booster’s gradient magnet power supply (GMPS). To our knowledge, this is one of the first well-documented datasets of accelerator device parameters made publicly available. We are releasing it in the hopes that it can be used to demonstrate aspects of artificial intelligence for advanced control systems, such as reinforcement learning and autonomous anomaly detection.

Kafkes, Diana (ORCID:000000021716463X)↗

BOOSTR: A Dataset for Accelerator Control Systems

The Booster Operation Optimization Sequential Time-series for Regression (BOOSTR) dataset was created to provide a cycle-by-cycle time series of readings and settings from instruments and controllable devices of the Booster, Fermilab's Rapid-Cycling Synchrotron (RCS) operating at 15~Hz. BOOSTR provides a time series from 55 device readings and settings that pertain most directly to the high-precision regulation of the Booster's gradient magnet power supply (GMPS). To our knowledge, this is one of the first well-documented datasets of accelerator device parameters made publicly available. We are releasing it in the hopes that it can be used to demonstrate aspects of artificial intelligence for advanced control systems, such as reinforcement learning and autonomous anomaly detection.

43 PARTICLE ACCELERATORS↗

Full-Cycle Simulations of the Fermilab Booster

The Proton Improvement Plan phase II (PIP-II) project currently under construction at FNAL will replace the existing 400 MeV normal conducting linac with a new 800 MeV superconducting linac. The beam power in the downstream rapid-cycling Booster synchrotron will be doubled by raising the machine cycle frequency from 15 to 20 Hz and by increasing the injected beam intensity by a factor 1.5. This has to be accomplished without raising uncontrolled losses beyond the administrative limit of 500 W. In addition, slip-stacking efficiency in the Recycler, the next machine in the accelerator chain, sets an upper limit on the longitudinal emittance of the beam delivered by the Booster. As part of an effort to better understand potential losses and emittance blow-up in the Booster, we have been conducting full cycle 6D simulations using the code PyORBIT. The simulations include space charge, wall impedance effects and transition crossing. In this paper, we discuss our experience with the code and present representative results for possible operational scenarios.

43 PARTICLE ACCELERATORS↗