Search NASA⌕ Search

SEARCH · Search NASA

Results for “re-tuning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Energy cost savings and expected payback for Re-tuning the controls of US Army buildings

The Headquarters Department of the Army (HQDA) sponsored a study to determine the national impact of deploying the Re-tuning™ methodology in 5 buildings types that account for over 40% of the Army’s conditioned building stock. Re-tuning is a systematic process that improves operational efficiency and reduces energy consumption at no- or low-cost through the building automation system (BAS) by correcting operational problems that plague buildings. The study relied on successful demonstration of the re-tuning methodology at 4 pilot US Army installations that informed a holistic effort that included simulating 12 individual re-tuning energy efficiency measures (EEMs) and 6 packages of EEMs in 5 selected Army building prototype models that represent 311 million ft2 (28.9 million m2) of the Army’s conditioned floor space. Both the baseline buildings and the packages were customized to capture the expected outcomes of re-tuning a diverse set of buildings. The study highlighted the benefit of individual re-tuning EEMs and economics of implementing packages of EEMs in applicable Army buildings across 16 climates and 2 building vintages. The average whole-building energy savings ranged from 10.8% to 40.5% by building type, with the company operations facility (COF) building having the highest value proposition from re-tuning. In addition, the study reveals that all large office (LO) buildings in the Army are economical to re-tune. The total modeled cost savings potential for re-tuning the five building types across the US Army is $204/1,000 sf ($220/100 m2), or $64M annually. This cost savings represents 5.6% of all the Army’s energy expenditures.

Fernandez, Nicholas EP↗

Building Re-tuning Simulator

The Building Re-tuning Simulator (BRS) is a Re-tuning focused modeling and building automation system simulation environment.

Fernandez, Nick↗

Army Re-tuning™ Implementation Guides

The Army is a large, geographically dispersed organization with 156 installations and over 980 million square feet of building space to operate and maintain. The building stock spans a wide range of vintages and missions, with many serving cross-cutting functions and purposes. To meet Federal mandates and reduction goals organizationally, in recent years the Army has aggressively pursued policy and energy efficiency projects and programs resulting in a 9.6% reduction in energy use intensity (EUI) from fiscal year (FY) 2015 to FY2017. Despite these successes, the Army remains the largest consumer of electricity in the Federal government and spent approximately $1.1 billion in energy-related costs in FY2017 The Pacific Northwest National Laboratory (PNNL), in support of the Assistant Secretary of the Army (Installations, Energy and Environment) (ASA (IE&E)), was tasked with a multi-year study and pilot demonstration to develop a business case for the potential energy and cost reduction benefits from re-tuning™ efforts for the Army. Re tuning is a systematic process aimed at minimizing building energy consumption by identifying and correcting operational problems that plague buildings. The methodology was developed by PNNL research staff in an effort to improve building operational efficiency at no- or low-cost, primarily through building automation system (BAS) controls. The methodology is based on two basic principles: If the equipment is not needed, turn it off; and if the equipment is not needed at full power, turn it down. Implementation of identified low-cost/no-cost operational improvements through the re-tuning process results in increased building energy efficiency, reduced operating costs, and improvement to occupant comfort.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Highlights and Lessons Learned from Army Re-tuning™ Pilot Demonstrations

The Army has aggressively pursued policy and energy efficiency projects and programs in recent years to meet Federal mandates and reduction goals organizationally (EISA 2007, AR 420-1, 42 U.S.C. § 8253), resulting in a 9.6% reduction in energy use intensity (EUI) from FY2015 to FY2017. Despite these successes, the Army remains the largest consumer of electricity in the Federal government and spent approximately $1.1 billion in energy-related costs in FY2017. Many of the low-cost/no-cost conservation measures have been deployed, so finding additional savings and projects that either (a) are cost effective or (b) can be bundled with more costly capital improvement projects to improve life cycle cost effectiveness, is imperative for the Army. Leveraging building control systems (BCS) and optimizing building performance through re-tuning represents a great opportunity for the Army. In 2016, the Pacific Northwest National Laboratory (PNNL), in support of the Assistant Secretary of the Army (Installations, Energy and Environment), i.e. ASA (IEE), was tasked in 2016 with a multi-year study and pilot demonstration to develop a business case for the potential energy and cost reduction benefits from re-tuning efforts for the Army.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Envision Charlotte Project Final Report

The Envision Charlotte Project (EC Project), supported by partners at the Center for Climate and Energy Solutions, the University of North Carolina at Charlotte’s Center for Sustainably Integrated Buildings and Sites and the City of Charlotte, has successfully demonstrated that existing buildings can benefit from operations improvements and low-cost efficiency upgrades, and that behavioral change campaigns can be effectively designed for measurability, longevity and impact. Support from this grant gave Envision Charlotte and its partners the resources and flexibility to demonstrate a variety of approaches to improve coordination with stakeholders in the implementation of programs to reduce the consumption of energy, water and waste. The project team also gained insights into the motivations and abilities that influence stakeholder engagement in sustainability initiatives at multiple levels. Importantly, as this report describes, strong partnerships between nonprofits, industry partners and research institutions can produce tangible impacts and replicable results in building efficiency. Further, building operators working alongside student researchers can form productive relationships that can advance building energy management goals. Key Findings of the EC Project This project focused on advancing solutions to energy efficiency in U.S. commercial buildings. The Building Re-Tuning™ Training (BRT) developed by the U.S. DOE’s Pacific Northwest National Lab (PNNL), designed to detect energy savings opportunities and implement improvements with resources and online tools, provided the starting point for the curriculum developed by stakeholders in the EC Project. Although the project partners encountered some issues with data consistency, the overall project outcomes fell short of the energy savings stated in the original proposal, and the total participating building targets were lower than anticipated, important findings, outcomes and lessons learned were achieved. EC Project grantees observed that the PNNL BRT, as currently written, was not compatible with the skills of average frontline mechanical personnel in the Charlotte region where the grant program was performed. Frontline staff are not, typically, energy managers, engineers or building commissioning agents, but they can play a key role in building performance. As detailed in this report, the grantees therefore focused on changes to the BRT that improved the level of training and competency of the frontline workers in this region. Among the technical observations related to improving the BRT that were observed in the EC Project: centralized facilities management often has an impact on building performance; operators can be overly reliant on service contracts; individual behaviors matter, and technology cannot be viewed as a crutch; current Building Automation Systems (BAS) are often too complex to support building efficiency optimization, but BAS coupled with appropriate training can support better outcomes; the “perfectly optimized” building is not a near-term possibility, but better education, especially of executives and managers, on the role of behavioral intervention is a promising direction the building science community can and should pursue; a lack of standards and protocols, and competition between proprietary software from service contracts, remain challenges for this industry. These technical observations, in turn, informed the EC Project’s overall findings, which were: Accomplishing building efficiency is a process of education for all involved in the building design, construction and operation supply chain. Building operators, as a professional class, have an opportunity for further training and education that will lead to better on-the-job performance. An updated Building Re-Tuning™ Training curriculum, based on the findings of this report, could be an avenue for these operators’ professional development.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Prevalence of typical operational problems and energy savings opportunities in U.S. commercial buildings

In the United States, as much as 30% of the 19 EJ that commercial buildings consume is considered excess. Much of the excess energy is due to the inability to manage building operations efficiently. Because almost 20% of the total primary energy consumption is associated with commercial buildings, significant energy reductions in this sector are needed to mitigate climate change. Therefore, many cities and states are mandating periodic “tune-ups” of these buildings to eliminate excess energy consumption. Although the benefits of tune-ups and retro-commissioning are clear, focusing these mandates to look for specific opportunities has been a challenge because of the lack of studies that document the prevalence of opportunities. Therefore, we analyzed building automation system data from 151 buildings across the United States to document common operational problems and opportunities to improve building operations. This analysis showed that opportunities to improve building operations exist in almost every building. These opportunities were not strongly correlated with building vintage or size, but were reflective of how the buildings are operated. The prevalence of the top 20 opportunities ranged between 74% and 23%, with 40% of these associated with air-handling units. The rest of the opportunities are associated with schedules, chilled and hot-water distribution, and zone controls. Of the 151 buildings, 69 of them implemented corrective actions of some or all opportunities that were identified. Implementation varied across the Re-tuning categories, with 60% for schedule opportunities, 50% for zone opportunities, over 40% for the air-handling unit and hot-water opportunities, and 35% of the chilled-water opportunities. There was wide variation in whole building energy savings, ranging from 0 to 50% and 0 to 18 $/m2 with median percent annual whole building savings of 12% and median normalized annual cost savings of $1.75/m2. In addition to documenting these key findings, the paper provides a list of opportunities that can be automatically and continuously identified and corrected and offers a list of those opportunities that should be the focus of the mandates.

Katipamula, Srinivas↗

The atmospheric hydrologic cycle in the ACME v0.3 model

We examine the global water cycle characteristics in the Accelerated Climate Modeling for Energy v0.3 model (a close relative to version 5.3 of the Community Atmosphere Model) in atmosphere-only simulations spanning the years 1980–2005. We evaluate the simulations using a broad range of observational and reanalysis datasets, examine how the simulations change when the horizontal resolution is increased from 1° to 0.25, and compare the simulations against models participating in the the Atmosphere Model Intercomparison Project of the 5th Coupled Model Intercomparison Project (CMIP5). Particular effort has been made to evaluate the model using the best available observational estimates and verifying model biases with additional datasets when differences are known to exist among the observations. Regardless of resolution, the model exhibits several biases: global-mean precipitation, evaporation, and precipitable water are too high, light precipitation occurs too frequently, and the atmospheric residence time of water is too short. Many of these biases are shared by the multi-model mean climate of models participating in CMIP5. The reasons behind regional biases in precipitation are discussed by examining how different fields, such as local evaporation and transport of water vapor, contribute to the bias. Although increasing the horizontal resolution does not drastically change the water cycle, it does lead to a few differences: an increase in global mean precipitation rate, an increase in the fraction of total precipitation that falls over land, more frequent heavy precipitation (>30 mm day -1 ), and a decrease in precipitable water. One of the most notable changes is the shift of precipitation produced by the convective parameterization to that produced by the large-scale microphysics parameterization. We analyze how changes in moisture and circulation with resolution contribute to this shift in the precipitation partitioning. Because changing horizontal resolution requires some re-tuning, the effect of that tuning was evaluated by performing an additional simulation at 1 but using the tunings from the 0.25 simulation. In conclusion, the evaluation shows that the more frequent heavy precipitation, the decrease in precipitable water, and the shift from convective to large-scale precipitation are predominantly due to resolution changes, while tuning changes have a major influence on the global mean precipitation and the land/ ocean partitioning of precipitation.

54 ENVIRONMENTAL SCIENCES↗

Determination of muon momentum in the MicroBooNE LArTPC using an improved model of multiple Coulomb scattering

Here, we discuss a technique for measuring a charged particle's momentum by means of multiple Coulomb scattering (MCS) in the MicroBooNE liquid argon time projection chamber (LArTPC). This method does not require the full particle ionization track to be contained inside of the detector volume as other track momentum reconstruction methods do (range-based momentum reconstruction and calorimetric momentum reconstruction). We motivate use of this technique, describe a tuning of the underlying phenomenological formula, quantify its performance on fully contained beam-neutrino-induced muon tracks both in simulation and in data, and quantify its performance on exiting muon tracks in simulation. Using simulation, we have shown that the standard Highland formula should be re-tuned specifically for scattering in liquid argon, which significantly improves the bias and resolution of the momentum measurement. With the tuned formula, we find agreement between data and simulation for contained tracks, with a small bias in the momentum reconstruction and with resolutions that vary as a function of track length, improving from about 10% for the shortest (one meter long) tracks to 5% for longer (several meter) tracks. For simulated exiting muons with at least one meter of track contained, we find a similarly small bias, and a resolution which is less than 15% for muons with momentum below 2 GeV/c. Above 2 GeV/c, results are given as a first estimate of the MCS momentum measurement capabilities of MicroBooNE for high momentum exiting tracks.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

sOPTICS: a modified density-based algorithm for identifying galaxy groups/clusters and brightest cluster galaxies

A direct approach to studying the galaxy–halo connection is to analyse groups and clusters of galaxies that trace the underlying dark matter haloes, emphasizing the importance of identifying galaxy clusters and their associated brightest cluster galaxies (BCGs). In this work, we test and propose a robust density-based clustering algorithm that outperforms the traditional Friends-of-Friends (FoF) algorithm in the currently available galaxy group/cluster catalogues. Our new approach is a modified version of the Ordering Points To Identify the Clustering Structure (OPTICS) algorithm, which accounts for line-of-sight positional uncertainties due to redshift space distortions by incorporating a scaling factor, and is thereby referred to as sOPTICS. When tested on both a galaxy group catalogue based on semi-analytic galaxy formation simulations and observational data, our algorithm demonstrated robustness to outliers and relative insensitivity to hyperparameter choices. In total, we compared the results of eight clustering algorithms. The proposed density-based clustering method, sOPTICS, outperforms FoF in accurately identifying giant galaxy clusters and their associated BCGs in various environments with higher purity and recovery rate, also successfully recovering 115 BCGs out of 118 reliable BCGs from a large galaxy sample. Furthermore, when applied to an independent observational catalogue without extensive re-tuning, sOPTICS maintains high recovery efficiency, confirming its flexibility and effectiveness for large-scale astronomical surveys.

79 ASTRONOMY AND ASTROPHYSICS↗

Frequency stability of the SRF cavities (microphonics)

There are several proposed experiments to search for Dark Matter that will utilize SRF cavities submerged into liquid Helium. Extremely narrow bandwidth of SRF cavities (<1 Hz) and requirements for cavity frequency stability will be obligated special measures to mitigate any vibrations from external sources that will be penetrated and re-tuned cavity. In the talk recent FNAL experience of measuring microphonics of SRF cavities used for Dark Photon experiment will be presented. FNAL’s program to mitigate SRF cavity microphonics (in passive and active way) will be presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Energy Efficiency Analysis and Grid Service Results for Commercial Buildings using the VOLTRON IoT Platform

In fiscal year 2021 (FY21), the Commercial Buildings Integration Program (CBI) within the Building Technologies Office (BTO), funded PNNL to conduct a field evaluation of the AIRCx and ILC using an Internet-of-Things (IoT) platform, VOLTTRON. The primary goal of the project is to show that software solutions deployed and delivered through an IoT-platform can identify energy efficiency opportunities and manage peak load (beyond the traditional demand response) in commercial buildings. There are also two secondary goals: 1) show that the energy efficiency solutions will result in identification of significant savings opportunities (10% to 30%) as well as energy cost reductions (10% to 15%) by managing the peak load in commercial buildings, and 2) show that an IoT-based software solution is more cost-effective compared to a manual process in meeting the Re-tuning/retro commissioning (RCx) mandates and there is a pathway for broader adoption of this approach. This report provides AIRCx and ILC results for two building located in District of Columbia managed by the energy service provider Intellimation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Delivering Energy Efficiency and Grid Services for Commercial Buildings on an IoT-Platform: Field Evaluation Plan

In FY20, the Commercial Buildings Integration Program (CBI) within Building Technologies Office (BTO) has funded PNNL to conduct field evaluation of the AIRCx and intelligent load control (ILC) using an Internet-of-Things (IoT) platform, VOLTTRON. The primary goal of the project is to show that software solutions deployed and delivered through an IoT-platform can identify energy efficiency opportunities and manage peak load in commercial buildings. There are also two secondary goals: 1) show that the energy efficiency solutions will result in identification of significant savings (10% to 30%) opportunities as well as energy cost reductions (10% to 15%) by managing the peak load in commercial buildings, and 2) show that an IoT-based software solution is more cost-effective in meeting the Re-tuning mandates than traditional retro commissioning (RCx) and there is a pathway for broader adoption of this approach. This report details how the field evaluation will be conducted, including what enhancements will be made to the software technologies, how PNNL will recruit energy service providers, types of buildings where the technology will be evaluated, metric of success for the field evaluation, and how the metric of success will be measured.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Implementation and Investigation of a Weather- and Jam Density-tuned Network Perimeter Controller

This paper implements and evaluates the performance of a network fundamental diagram (NFD) proportional-integral perimeter controller (PC) using base tuned parameters (clear weather conditions and a base jam density of 160 veh/km/lane). The parameters were then re-tuned separately for different weather conditions and jam density values (reflecting different percentage of trucks), resulting in two new control methods: a weather-tuned perimeter controller (WTPC) and a jam density-tuned perimeter controller (JTPC). The WTPC was shown to outperform the no control strategy and the PC for different weather conditions. Specifically, the WTPC decreased the congestion inside the protected network (PN) and improved the overall performance of the full network (FN) by decreasing the average vehicle travel time, decreasing the vehicle total delay, increasing the average vehicle speed and decreasing the average vehicle fuel consumption. Alternatively, the JTPC was shown to perform similar to the PC for jam densities higher than the base-case jam density used in the PC (in our case 160 veh/km/lane). However, the JTPC outperformed the PC for smaller jam densities given that these smaller jam densities result in queues spilling back faster to upstream traffic signals. The results demonstrate the need to tune the controller to the actual jam density especially when the jam density decreases (e.g. trucks are introduced to the network). http://pubsindex.trb.org/

42 ENGINEERING↗

“It is amazing what you can accomplish if you do not care who gets the credit”: Creating Alignment between Cities and Utility Energy Efficiency Programs

Cities are significantly acting as market catalysts to encourage and require building owners to improve energy performance. Yet, cities implementing building performance policies that require actions like audits or re-tuning may experience conflicts with their regulated utilities’ efficiency programs, which depend on energy savings being additional—not attributable to market adoption or preexisting laws. These utility programs preclude free ridership, meaning that the energy savings should be achieved by someone who otherwise would not have acted in the absence of the incentive or rebate. Utilities may decline to offer incentives where cities require particular actions, in turn dissuading cities from enacting ordinances that would lead to further efficiency improvements. This regulatory challenge impedes what could otherwise be a shared goal of improving energy efficiency. Finding solutions that allow city ordinances and utility programs to coexist is vital as cities are taking climate and energy matters into their own hands. Cities and utilities have so far navigated this problem informally. One potential approach is to apply established models from the world of energy codes, where some state regulators have permitted utilities to earn energy savings credit from supporting adoption of energy codes, or from improving code compliance. We consider how this approach and other frameworks could be applied to building performance policies. More specifically, this paper lays out a theory for how utilities can collaborate with local partners to drive deeper energy savings, with oversight from regulators, and examines the question of attributing the savings between the city and utility.

Crandall, Kelly↗

Experiences from Field Testing for Black Start of a Run-of-the-river Hydropower Plant in Idaho Falls Power Distribution Grid

Idaho Falls Power (IFP) utility has local generation portfolio comprising of 56.3MVA of run-of-the-river (ROR) hydropower that can serve typically 25%-30% of the total load demand. The remaining load is served by importing power from Bonneville Power Administration through two Pacificorp transmission interconnections. In case of emergencies (power disruption or directed load reduction), the capability to island from transmission grid and stably serve critical loads in the IFP distribution grid can be a huge advantage. In this direction, the capability to black start with ROR is an essential requirement, and a challenge due to limited dispatchability and requires re-tuning of hydro-governor and excitation system controls. This paper presents the field experience from the testing done for black start of 8.9 MW ROR hydro plant in the IFP distribution grid using an adjustable load bank in December 2017. The lessons from the successful black start testing is presented along with test results to establish the potential value and requirements to develop black start capability with a ROR hydro plant.

13 HYDRO ENERGY↗