Search NASA⌕ Search

SEARCH · Search NASA

Results for “reconditioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Steelhead Kelt Reconditioning and Reproductive Success, 2008 Annul Report.

Iteroparity, the ability to repeat spawn, is a natural life history strategy that is expressed by some species from the family Salmonidae. Current rates of observed steelhead Oncorhynchus mykiss iteroparity rates in the Columbia River Basin are severely depressed due to anthropogenic development which includes operation of the hydropower system and other habitat degradations. Artificial reconditioning, which is the process of culturing post-spawned fish (kelts) in a captive environment until they are able to reinitiate feeding, growth, and redevelop mature gonads, is evaluated in this study as method to restore depressed steelhead populations. To test the efficacy of steelhead kelt reconditioning as a management and recovery tool different scenarios were investigated ranging from very low intensity (collect and transport fish) to high intensity (collect and feed fish in captivity until rematuration). Examinations of gamete and progeny viability were performed for first-time spawners and reconditioned kelt steelhead. We have continued to examine reproductive success of reconditioned kelt steelhead in Omak Creek using microsatellite loci to perform parentage analysis on juvenile O. mykiss . The groundwork has also begun on developing a genetic analysis of the Yakima subbasin in order to determine steelhead kelt contribution by utilizing parentage analysis on a larger scale. A research and study plan has been developed cooperatively with the University of Idaho to determine the feasibility of steelhead kelt reconditioning program in the Snake River Basin. Analysis of management scenarios indicated that while no-term and short-term reconditioned kelts continue to perform well outmigrating to the ocean but returns from these groups have been low ranging from 0-12% during 2002-2008. Survival (56%) of fish in the long-term treatment in 2008 was the highest we have observed in this project. Analyzing the three different management scenarios within the Yakima River subbasin we determined that long-term reconditioning contributed the highest numbers of fish to the spawning run, and short-term reconditioning overall was the best of the transport releases to the ocean. However contributions to the spawning run by no-term or short-term groups was low in all years. This is the second successful year of kelt gamete and progeny analysis. Initial limited results suggest that reconditioned kelts may have shown limited improvement in both egg quantity and/or quality. There is further evidence to support the successful spawning of steelhead kelts in the wild at Omak Creek. Yakima kelts have been successfully identified to stream origin using genotypes.

13 HYDRO ENERGY↗

Active Reconditioning of Retired Lithium-ion Battery Packs from Electric Vehicles for Second Life Applications

Utilizing the remaining capacity in retired lithium-ion (Li-ion) batteries from electric vehicles (EVs) for second-life applications has shown economic and environmental benefits. However, achieving homogeneity among the capacities of cells before their second life is critical to exploit the benefits. This article proposes a new active reconditioning approach with the potential to make short-term reconditioning of batteries before second life feasible. A control objective map determines each cell's state-of-charge (SOC) operating window based on its capacity relative to other cells. The SOC reference translates into distinct differential currents through the cells, wherein the higher-capacity cells undergo more frequent and deep charge and discharge cycles than their lower-capacity counterparts. The proposed solution achieves capacity homogeneity within the battery pack with low reconditioning time and minimal fade in the overall pack capacity. The feasibility of the reconditioning approach under varying load and environmental conditions is assessed through simulations, encompassing factors such as the number of cycles per day, depth-of-discharge, battery pack temperature, and cell resting time at different SOCs. Furthermore, the simulation model employs a battery pack with sixteen series-connected 75 Ah Kokam lithium nickel manganese cobalt oxide (NMC) cells with a 3.6% initial capacity imbalance. A reconditioning time of 1.3 months is achieved with a final capacity imbalance of 0.1% and an overall capacity fade of 0.005%, thereby confirming the viability of the reconditioning process. Moreover, experimental validation using eight retired battery cells from a Nissan Leaf demonstrates a substantial decrease in the capacity imbalance of cells from 9.4% to 2.15% within 78 days, effectively affirming the efficacy of the proposed reconditioning scheme.

25 ENERGY STORAGE↗

Survival and Traits of Reconditioned Kelt Steelhead Oncorhynchus mykiss in the Yakima River, Washington

Abstract We evaluated the traits and survival to release of reconditioned kelt steelhead Oncorhynchus mykiss in the Yakima River (Washington State, USA). From 2001 to 2011, we captured a total of 9,738 downstream-migrating kelts at an irrigation diversion facility, an average about 27% of each annual wild steelhead return. Captured kelts were reared for 4.5–10 months in an artificial environment, treated for diseases and parasites, and fed both krill and pellets. Surviving reconditioned fish were released into the Yakima River during the peak of the upstream migration of prespawn steelhead. Reconditioned steelhead kelts were predominantly (>92%) female. Annual survival to release ranged from 20% to 62% and averaged 38% over the course of the study, the surviving reconditioned kelts showing increases in FL, weight, and Fulton's K condition factor compared with their preconditioning status. Kelts in good condition and those with bright coloration at the time of collection were more likely to survive than those of poorer status at collection. Postrelease timing of upstream migration by reconditioned kelts was spread over several months and correlated well with the run timing of prespawn migrants upstream. The empirical results we observed demonstrate the potential for kelt reconditioning to provide recovery benefits for repeat spawning imperiled wild populations in highly developed river systems. Received July 17, 2012; accepted March 15, 2013

Hatch, Douglas R.↗

Immunosuppressive Total Lymphoid Irradiation-Based Reconditioning Regimens Enable Engraftment After Graft Rejection or Graft Failure in Patients Treated With Allogeneic Hematopoietic Stem Cell Transplantation

Purpose: To retrospectively evaluate the efficacy of total lymphoid irradiation (TLI)-based reconditioning regimens in patients with graft failure or graft rejection after allogeneic hematopoietic stem cell transplantation. Methods and Materials: The results of 14 patients (7 adults and 7 children) with a variety of hematologic malignant diseases treated with a TLI-based reconditioning regimen with 7-Gy single-dose application plus anti-T-lymphocyte antibody OKT3 (n = 11) and/or antithymocyte globulin (n = 7)/fludarabine (n = 9), followed by an infusion of peripheral blood stem cells (n = 13) or bone marrow stem cells (n = 1) from related or unrelated donors, were retrospectively analyzed. Results: Of the 14 recipients, the data from 11 were evaluable for engraftment after TLI-based reconditioning because 3 adults died early (at Day 2, 5, and 15) after the second transplantation of infectious complications. Engraftment in 4 adults was seen after a median of 12 days (range, 10-18) and occurred after a median of 10 days (range, 9-32) in the 7 children. TLI-based reconditioning was well-tolerated with no severe toxicity. The median overall survival and disease-free survival for the whole cohort was 140 days (range, 5-1,268). After a median follow-up of 681 days, the disease-free survival and overall survival rate was 85.7% and 85.7%, respectively, in the children. Despite engraftment in the 4 remaining adults, 1 died of fatal graft-vs.-host disease, 1 of infectious complications, 1 of disease relapse, and 1 of acute respiratory distress syndrome. Conclusions: In patients with graft failure or graft rejection after allogeneic hematopoietic stem cell transplantation, TLI-based reconditioning regimens allow sustained engraftment, paralleled by a favorable toxicity profile, potentially leading to long-term survival.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Swedish Solution for Reconditioning, Transport, Interim Storage and Final Disposal of Failed Fuel - 17024

Despite today's increasingly more reliable operation of nuclear power plants, failed fuel rods exist in all Swedish plants. Managing intermediate storage and sub-sequential final disposal of such rods has been a growing problem. The Swedish system for spent fuel management uses the principle of intermediate storage of the fuel in a central intermediate storage facility (CLAB) before disposal in a final repository according to the KBS-3 method. However, the intermediate storage facility does not allow storage of failed fuel and the final repository has limitations on moisture in the deposited fuel and hence failed or broken fuel rods cannot be accepted as-is. The nuclear power companies in Sweden have jointly established the Swedish Nuclear Fuel and Waste Management Co, SKB, to manage the spent fuel and the operational waste. To find a solution to transport the failed fuel to storage, SKB has established a project with the goal to have all currently failed fuel rods from all the Swedish nuclear power plants reconditioned and transported to the intermediate storage facility before the year of 2020. The project has established the acceptance criteria for reconditioned failed fuel in the final repository and evaluated a number of options for treatment, encapsulation and transportation of the failed fuel rods. Furthermore, two suppliers have developed reconditioning methods fulfilling the criteria and contracts were signed with both suppliers in May 2016. This paper outlines the details of the Swedish solution for treatment and storage of failed fuel including the technical requirements for the reconditioning method and transportability. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Active Life Balancing to Recondition Li-ion Battery Packs for 2nd Life

An investigation is presented into the application of active life balancing battery management systems to recondition inhomogeneous Li-ion battery packs and achieve homogeneity in capacity for second life. This paper proposes a life balancing objective map, which controls the state of charge references for each cell in a battery pack based on its capacity relative to other cells. The impacts of life balancing objective maps on the reconditioning time and overall pack capacity fade are considered. Moreover, the proposed approach accounts for various load and environmental effects, including depth-of-discharge, battery pack temperature, number of cycles per day, and cells’ resting time at various states of charge. The study results in a battery pack with convergent capacities achieved in minimal time, while curtailing overall capacity fade. Simulation results for a battery pack with sixteen series connected 75 Ah Kokam NMC cells with 3.6% initial capacity imbalance are presented, indicating a reconditioning time of 1.34 months with a final capacity imbalance of 0.1% and an overall capacity fade of 0.005%.

47 OTHER INSTRUMENTATION↗

Heat exchanger life extension via in-situ reconditioning

A method of in-situ reconditioning a heat exchanger includes the steps of: providing an in-service heat exchanger comprising a precipitate-strengthened alloy wherein at least one mechanical property of the heat exchanger is degraded by coarsening of the precipitate, the in-service heat exchanger containing a molten salt working heat exchange fluid; deactivating the heat exchanger from service in-situ; in a solution-annealing step, in-situ heating the heat exchanger and molten salt working heat exchange fluid contained therein to a temperature and for a time period sufficient to dissolve the coarsened precipitate; in a quenching step, flowing the molten salt working heat-exchange fluid through the heat exchanger in-situ to cool the alloy and retain a supersaturated solid solution while preventing formation of large precipitates; and in an aging step, further varying the temperature of the flowing molten salt working heat-exchange fluid to re-precipitate the dissolved precipitate.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Test for Reconditioning RA Waste with Simulated Bitumen and Concrete in a 1,2 MW Plasma Test Facility - 20092

The operation and maintenance of nuclear power plants, the non nuclear fuel cycle, etc generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified, oxidized and purified in an off-gas cleaning system. First the paper describes the new full-scale Plasma Melting Facility (PMF) at the Kozloduy Nuclear Power Plant in Bulgaria which was taken in nuclear operation In May 2018. The plant has a capacity of 250 tons per year and the maximum contact dose rates of the incoming waste is 2 mSv/h. Different mixtures of radioactive waste packed in 200 l drums were successfully treated resulting in a glassy slag free from liquids and organic material with an important volume reduction factor (VRF). The Project was co-financed through a grant by Kozloduy International Decommissioning fund (KIDSF) administrated by the EBRD through Bulgarian national funding. Plasma is a suitable technology for treatment of problematic waste or even reconditioning waste so Belgoprocess was contracted to do plasma tests with simulated conditioned waste types. One can do tests on a laboratory scale on smaller samples and torch capacities of e.g. 50 kW but Belgoprocess wanted to do more realistic and reliable tests. So Belgoprocess contracted Phoenix Solutions Co who has a full-scope test facility equipped with a 1200 kW plasma torch for full-scope treatment of simulated conditioned waste. For a first confidential contract simulated 200 l (55 gallon) bitumen drums were treated. The drums contained different pucks of compacted waste such as rags, used filters, granulates, etc. The pucks were stacked in the 200 l drums and subsequently embedded with bitumen. A total of 6 drums were treated in the plasma facility. For a second contract simulated homogeneous 200 l (55 gallon) concrete drums with on the one hand concentrates and on the other hand spent resins were selected. A total of 6 drums with concrete and spent resins were treated and melted in the plasma testing facility. The paper describe the test facility, volume reduction factor (VRF) of different waste streams and most important parameters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Steelhead Kelt Treatments to Increase Iteroparous Spawners in the Yakima River Basin

Abstract Steelhead Oncorhynchus mykiss are iteroparous, distinguishing them from Pacific salmon Oncorhynchus spp. that are semelparous. In this study we evaluated enhancement techniques that exploit this life history strategy to facilitate species restoration and recovery. In the Columbia River basin, where the natural ecosystem has been substantially altered over several decades due to human influence, all steelhead populations are listed as threatened or endangered under the U.S. Endangered Species Act. One factor believed to be limiting survival of Columbia River kelt (postspawned) steelhead is poor migration success to the ocean past several dams. We evaluated three treatments for kelts captured in the Yakima River basin from 2002 to 2011: (1) transport and release below Bonneville Dam (to provide unimpeded access to the ocean); (2) short-term reconditioning (holding and feeding in an artificial environment to facilitate gonad maturation) with transport; and (3) long-term reconditioning. These treatments were compared with an in-river migration control group to identify differences in the rate at which kelts survived and returned to Prosser Dam for potential repeat spawning (hereafter repeat spawners). The long-term reconditioning treatment exhibited the highest return rate of repeat spawners (range, 11.5–17.6%). The short-term reconditioning treatment with transport downstream from Bonneville Dam had a 3.2% return rate. The transport only treatment exhibited the lowest return rate (0.9%); this was only one-third of the control group's return rate (2.7%). Our results indicate that long-term steelhead kelt reconditioning is more successful than either transportation or in-river migration alternatives at increasing potential repeat spawner abundance and providing recovery benefits in river systems that have experienced substantial losses in natural productivity due to loss of habitat and habitat connectivity. Received June 23, 2015; accepted February 27, 2016 Published online July 15, 2016

Trammell, Jeffrey L. J.↗

Delineating Facies Spatial Distribution by Integrating Ensemble Data Assimilation and Indicator Geostatistics with Level-Set Transformation

The facies-based approach has been widely adopted to delineate an aquifer into distinct geological units with unique distributions of hydraulic, physical, and/or chemical properties. The recent development in ensemble-based data assimilation methods allows both the direct and indirect data to be used to improve facies delineation. A major difficulty in those applications is to honor the spatial continuity and avoid overfitting after data assimilation. We introduce a new facies delineation framework to integrate ensemble data assimilation with traditional transition probability-based geostatistics. A level-set concept is used to parametrize discrete facies indicators and for updating facies shape. During the iterative data assimilation process, we impose spatial continuity by conditioning facies field generation on points selected adaptively based on their sensitivity to observation data. This reconditioning step is a key step to maintain spatial continuity and overcome over-fitting problems in inversion. We selected two examples to evaluate the performance of the new framework in estimating facies-based permeability field. The first example is a two-dimensional synthetic system with transient head data induced by pumping tests used for delineating two facies. The second example is a three-dimensional case with three facies, conceptualized from a field tracer experiment within the Columbia River corridor in Washington State, USA. Both examples demonstrate that the new method can adequately capture the spatial pattern of hydrofacies with reconditioning, which leads to the improved prediction of system behaviors.

Song, Xuehang↗

UP2 400 High Activity Oxide Legacy Waste Retrieval Project Scope and Progress-13048

The High Activity Oxide facility (HAO) reprocessed sheared and dissolved 4500 metric tons of light water reactor fuel the fuel of the emerging light water reactor spent fuel between 1976 and 1998. Over the period, approximately 2200 tons of process waste, composed primarily of sheared hulls, was produced and stored in a vast silo in the first place, and in canisters stored in pools in subsequent years. Upon shutdown of the facility, AREVA D and D Division in La Hague launched a thorough investigation and characterization of the silos and pools content, which then served as input data for the definition of a legacy waste retrieval and reconditioning program. Basic design was conducted between 2005 and 2007, and was followed by an optimization phase which lead to the definition of a final scenario and budget, 12% under the initial estimates. The scenario planned for the construction of a retrieval and reconditioning cell to be built on top of the storage silo. The retrieved waste would then be rinsed and sorted, so that hulls could subsequently be sent to La Hague high activity compacting facility, while resins and sludge would be cemented within the retrieval cell. Detailed design was conducted successfully from 2008 until 2011, while a thorough research and development program was conducted in order to qualify each stage of the retrieval and reconditioning process, and assist in the elaboration of the final waste package specification. This R and D program was defined and conducted as a response and mitigation of the major project risks identified during the basic design process. Procurement and site preparatory works were then launched in 2011. By the end of 2012, R and D is nearly completed, the retrieval and reconditioning process have been secured, the final waste package specification is being completed, the first equipment for the retrieval cell is being delivered on site, while preparation works are allowing to free up space above and around the silo, to allow for construction which is scheduled to being during the first semester of 2013. The elaboration of the final waste package is still undergoing and expected to be completed by then end of 2013, following some final elements of R and D required to demonstrate the full compatibility of the package with deep geological repository. The HAO legacy waste retrieval project is so far the largest such project entering operational phase on the site of La Hague. It is on schedule, under budget, and in conformity with the delivery requirements set by the French Safety Authority, as well as other stakeholders. This project paves the way for the successful completion of AREVA La Hague other legacy waste retrieval projects, which are currently being drafted or already in active R and D phase. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low-Cost, Easy-To-Integrate and Reliable Grid Energy Storage System with 2 nd Life Lithium Batteries

Batteries retired from electric vehicles have the potential to extend their service as low-cost stationary energy storage systems. However, disperse battery state of health (SOH) and nonuniform battery characters often lead to compromised battery performance and reliability, which greatly hinder their adoption. A Heterogenous Unifying Battery (HUB) system is proposed to stage 2 nd life battery bricks for a period, and enable them to attain improved SOH uniformity, performance, and reliability before being sold for 2 nd life applications, while simultaneously providing grid services. It may offer a technically and economically advantageous solution for the broad utilization of 2 nd use batteries. The goal of this project was to develop the hardware and software that enables the key functions of the HUB system. The first achievement of the project was the development of a 1kW scale proof-of-concept (POC) system, which comprises (i) a modular plug-n-play DC-DC power converter matrix with isolated series output connections to achieve fully independent control of energy flow to each of the connected battery units at low voltage; (ii) enhanced model based control that drives each batteries’ SOH towards uniformity while collectively providing grid energy storage services; and (iii) comprehensive procedures to perform battery diagnostics and prognostics. The second achievement was the development of a 100kW scale HUB system and demonstrated its performance of re-establishing battery SOH uniformity through a period of battery cycling operation. The final HUB system incorporates six DC-DC power converter matrices paired with six battery bricks. Hot swapping of a single battery brick while maintaining consistent system power was demonstrated and system operation was validated to be capable of implementing the approved grid duty cycle and of balancing and conditioning the battery bricks. Through the course of the project, the team optimized the building-block design, form-factors, and adjusted life balancing control. An up-sized 250kW Scale was developed and deployed in October 2022 with pack-level battery form factors, see photo in Figure 1 The third achievement of the project was to perform a techno-economic analysis in order to better understand the cost and revenue potentials in this new “recondition-then-resell" value proposition. The final TEA quantified the economics of new Li-ion batteries as well as second-life batteries processed via reconditioning and traditional binning. Results showed the reconditioned second-life batteries in this project to be economically favorable and viable in grid energy storage markets. The TEA results were published in the Applied Energy journal. The fourth achievement of the project was to deliver a tech-to-market plan for the HUB system that includes funding, IP, and manufacturing strategies. The final T2M plan outlines a business strategy in which the HUB provides a B2B service to EV companies as an alternative to battery recycling that can prepare batteries for 2nd life applications. A company named Smartville Inc. was founded to carry on the commercialization, funding, and technical IP licensing activities of the OPEN project.

25 ENERGY STORAGE↗

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2026

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms and Engineering Test Loop (METL) at Argonne National Laboratory (ANL). While designed to accommodate a variety of components intended for use in advanced compact in-vessel transfer machine, the focus of GTA been the testing of large radial spur gears. The performance of the components used in GTA motivates the choices made in the design, components, and material choices for the forthcoming METL test articles; the Gripper Test Assembly (GrTA), and the Bearing Test Assembly (BTA). To date, GTA has completed nine experimental testing campaigns and achieved over 21 million revolutions under prototypic sodium fast reactor loads and operating conditions. This report provides an overview and results for the two most recent experiments Campaign #8 and Campaign #9. `Campaign #8 was the first campaign to make use of a set of nickel alloy radial spur gears, made from Hastelloy C-22HS, and combined with heat-treated tapered roller bearings. The bearings and torque profile used allowed Campaign #8 to be directly compared with Campaign #1 where Inconel 718 gears were used instead. Campaign #8 attained 1,058,880 shaft revolutions within 23% of the 1,314,855 revolutions achieved in Campaign #1. These results demonstrate that the heat-treated tapered roller bearings show consistent increased lifetimes, approximately three times longer than for non heat-treated taper rollers, and that the particular material of the gear does not play a substantial role in performance. Similar to Campaign #7 where bearing failure resulted in fragmentation and transport of bearing material into the gear teeth led to tooth damage in the Inconel gears, a similar process led to the damage of the Hastelloy gears. Subsequent NDE analysis showed that the damage was only limited to the tooth surface and does not extend into the gear interiors. Based on the NDE reports, the Hastelloy gears can be reconditioned and put back into service for future campaigns as was done for the Inconel gears. Reconditioned Inconel 718 gears damaged in Campaign #7 were returned to service in Campaign #9 and paired with non heat-treated tapered roller bearings. In Campaign #9 a novel set of operating conditions were implemented whereby the gears and bearings were cycled between hot, submerged refueling conditions where fuel handling operations occurred and cold, dry, and inert conditions where the sodium was drained and the vessel was allowed to cool simulating long, ex-vessel storage of the fuel handling machine. A total of eight of these operating cycles were achieved before a bearing failure occurred after the accumulation of 475,692 shaft revolutions were achieved. During Campaign #9, one of the drive motors was damaged and over the course of a 240 day standby period, the entire GTA drive system was upgraded from a 480VAC system to a 240VAC system that provided the opportunity to consolidate wall-space in the METL facility and provide more space for additional test articles being installed in the coming year. The over 475,000 shaft revolutions achieved in Campaign #9 eclipses the previous record for lifetime of non heat-treated tapered roller bearings held by Campaign #3 of 392,000 shaft revolutions. Further analysis and future campaigns hope to shed light on the cause of this approximately 17% increase in lifetime.

42 ENGINEERING↗

Summary Report on Gamma Radiolysis of TBP/n-dodecane in the Presence of Nitric Acid Using the Radiolysis/Hydrolysis Test Loop

Design and installation has been completed for a state-of-the-art radiolysis/hydrolysis test loop system. The system is used to evaluate the effects of gamma radiolysis and acid hydrolysis on the stability and performance of solvent extraction process solvents. The test loop is comprised of two main sections; the solvent irradiation and hydrolysis loop and the solvent reconditioning loop. In the solvent irradiation and hydrolysis loop, aqueous and organic phases are mixed and circulated through a gamma irradiator until the desired absorbed dose is achieved. Irradiation of the mixed phases is more representative of actual conditions in a solvent extraction process. Additionally, the contact of the organic phase with the aqueous phase will subject the solvent components to hydrolysis. This hydrolysis can be accelerated by controlling the system at an elevated temperature. At defined intervals, the organic from the irradiation/hydrolysis loop will be transferred to the solvent reconditioning loop where the solvent is contacted with scrub, strip, and solvent wash solutions which simulate process flowsheet conditions. These two processes are repeated until the total desired dose is achieved. Since all viable solvent extraction components in an advanced fuel cycle must exhibit high radiolytic and hydrolytic stability, this test loop is not limited to any one solvent system but is applicable to all systems of interest. Also, the test loop is not limited to testing of process flowsheets. It is also a valuable tool in support of fundamental research on newly identified extractants/modifiers and the impact of gamma radiation on their stability in a dynamic environment. The investigation of the radiolysis of a TBP/n-dodecane process solvent in contact with aqueous nitric acid has been performed. These studies were intended to confirm/optimize the operability of the test loop system. Additionally, these data are directly applicable to numerous other solvent extraction processes containing TBP that are being developed to support advanced aqueous separations processes. Initial experimental results are consistent with existing literature reports regarding TBP/n-dodecane radiolysis. Additionally, the gamma dose rate has been characterized within the test loop and analytical methods have been developed for the characterization and quantification of radiolytic degradation products.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High-moisture pelleting of corn stover using pilot- and commercial-scale systems: Impact of moisture content, L / D ratio and hammer mill screen size on pellet quality and energy consumption

Here, high-moisture pelleting of corn stover was tested in pilot- and commercial-scale systems. For the pilot-scale study, a 6.35 mm screen size hammer mill ground corn stover was reconditioned to moisture between 14 and 29.6% (w.b.), and 5, 7 and 9 L/D ratio pellet die were used. At 29% corn stover moisture content and L/D ratios of 5 and 9, the bulk density and durability of the pellets were ≤450 kg/m 3 and <90% and >540 kg/m 3 and >90%, respectively. Increasing the feedstock moisture and L/D ratio increased the pelleting energy. Increasing the hammer mill screen size to 11.11 mm reduced the bulk density but not the durability. The response surface models adequately described the pelleting process (R 2 ≥ 0.88), and analysis of variance showed a strong interaction between the process variables and pellet properties. Commercial-scale testing of high-moisture pelleting using 6.35 mm ground corn stover bales in the moisture range 24–26% (w.b.) produced pellets with a density of >675 kg/m 3 and durability of >98%, whereas increasing the hammer mill screen size to 11.11 mm reduced the bulk density by about 100 kg/m 3 but not the durability. The energy consumption of the commercial-scale unit operations for the high-moisture pelleting process was in the range 98–124 kW h/ton, which is 64–72% less energy than conventional pelleting that requires energy about 350 kW h/ton for biomass drying from 30% (w.b.) to 10% (w.b.) moisture content before pelleting. Pellets produced using high-moisture pelleting met International Organization for Standardization and Pellets Fuel Institute international standards. Published 2023. This article is a U.S. Government work and is in the public domain in the USA.

09 BIOMASS FUELS↗

Genetically engineered poplar wood effectively enhances the efficiency of deep eutectic solvent-mediated one-pot processing

Although lignocellulosic biomass is a renewable resource with the potential to replace fossil-derived fuels and chemicals, its recalcitrance, largely due to lignin, limits its utilization. Recent advancements in genetic engineering have produced transgenic trees with reduced lignin content and/or modified lignin structure without compromising growth traits. Here, three engineered poplar varieties are evaluated as feedstocks using a biocompatible one-pot deep eutectic solvent-mediated process that integrates biomass fractionation and enzymatic saccharification within a single reactor, eliminating water washing and reconditioning. All transgenic poplars exhibit higher fermentable sugar yields than wild-type (WT) trees. Notably, QsuB poplar, incorporating 3,4-dihydroxybenzoate in lignin, achieves the highest glucose conversion yield of 91.3% (vs. 73.0% from WT). AT5 and MdCHS3 poplars, incorporating ferulate esters and naringenin, also demonstrate improved glucose yields (86.7 and 84.7%, respectively), confirming reduced biomass recalcitrance. Additionally, residual lignins are valorized via hydrogenolysis into phenolic compounds, with comparable alkylphenol production across all lines. These findings demonstrate that the transgenic poplar lines not only serve as superior feedstocks for sugar conversion but also provide a rich resource for phenolic compound production, enhancing the operational and economic viability of integrated biorefinery processes.

biomasses↗