Search NASA⌕ Search

SEARCH · Search NASA

Results for “repair crew”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Multiperiod Distribution System Restoration With Routing Repair Crews, Mobile Electric Vehicles, and Soft-Open-Point Networked Microgrids

This paper proposes a distribution system restoration model which is in response to multiple outages caused by natural disasters. The proposed restoration model includes the coordination of routing repair crews (RRCs), mobile batterycarried vehicles (MBCVs), and networked microgrids (NMGs) formed by soft open points (SOPs). The travel and repair time constraints are modeled for each RRC; travel path and charging strategy are modeled for each MBCV; and the network reconfiguration is developed considering the optimal operation of SOP-based NMGs. Furthermore, the proposed model is presented as a mixedinteger linear program which is solved by an auxiliary induce function based algorithm to reduce the computational complexity. The modified IEEE 33-bus and 69-bus distribution systems are tested with multiple outages. The presented results demonstrate the effectiveness of the proposed model

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preventive Power Outage Estimation Based on a Novel Scenario Clustering Strategy

The increasing occurrence of extreme weather events is challenging power grid operation. For extreme weather events, the system operator is responsible for estimating the power outages and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The outputs of an outage prediction model tool are used to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers repair crews and mobile energy resources (MERs). Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative profiles which the system operator can focus on. Finally, case studies on a distribution system evaluate the damage caused by an extreme weather event and verify the effectiveness of the proposed scenario clustering strategy.

MATHEMATICS AND COMPUTING,POWER TRANSMISSION AND D↗

Co-optimization of repairs and dynamic network reconfiguration for improved distribution system resilience

In this work, a post-disaster distribution system repair and restoration (DSRR) strategy is proposed to improve distribution system resilience. The DSRR strategy is formulated as a two-stage optimization. The first stage is a comprehensive co-optimization of repair crew scheduling, dynamic network reconfiguration, and distributed energy resource (DER) dispatch based on the forecast load profile. The goal is to minimize the accumulative operating cost caused by the load reduction payment as well as DER operating cost. In particular, since the number of available repair crews is usually smaller than the number of faulted lines after a disaster event, the DSRR strategy determines the optimal scheduling for repairing faulted lines. The second stage is a re-dispatch of the DER power output and load shedding based on the real-time load demand of each bus. The proposed algorithm is validated by case studies of the IEEE 33-bus and 123-bus test systems. We consider those scenarios in which faults occur in multiple heavy-loaded feeders. The simulation results demonstrate that the DSRR strategy effectively coordinate the repair scheduling, network reconfiguration and load shedding to minimize the operating cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A sequential Attacker-Defender game for distribution systems resilience enhancement against extreme weather events

Improving distribution system resilience against frequent extreme weather events is important for reliable power system operations. Especially when dealing with events such as hurricanes that have short-term predictions, proactive pre-event preparedness plays a vital role in system resilience performance. In this paper, we propose a novel approach to construct pre-event resource allocation plans for system operators to cope with upcoming threats through a sequential attacker-defender game framework. The sequential attacker-defender game is designed to model the interaction between the extreme weather and the system operator. In each round of the game, the attacker and the defender sequentially update their current strategies by accounting for the opponent’s action set. The attacker model is formulated as a bi-level problem to identify the severe outage scenarios, and the defender model is formulated as a two-stage optimization problem to determine the allocation of restoration resources including mobile responsive resources and repair crews. Two scale-reduction strategies are proposed to ensure the scalability of the game scheme. Finally, case studies on the IEEE 33-bus and a 7149-node practical utility system validate the effectiveness of the proposed sequential game and the efficiency of the scale-reduction strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic pre-event preparation for enhancing resilience of distribution systems

Extreme weather events are the common causes for power supply interruptions and power outages in electrical distribution systems. Improving the distribution system and enhancing its resilience is becoming crucial due to the increased frequency of extreme weather events. Preparation and allocation of multiple flexible resources, such as mobile resources, fuel resources, and labor resources before extreme weather events can mitigate the effects of extreme weather events and enhance the resilience of power distribution systems. Here, in this paper, a two-stage stochastic mixed-integer linear programming (SMILP) is proposed to optimize the preparation and resource allocation process for upcoming extreme weather events, which leads to faster and more efficient post-event restoration. The objective of the proposed two-stage SMILP is to maximize the served load and minimize the operating cost of flexible resources. The first stage in the optimization problem selects the amounts and locations of different resources. The second stage considers the operational constraints of the distribution system and repair crew scheduling constraints. The proposed stochastic pre-event preparation model is solved by a scenario decomposition method, Progressive Hedging (PH), to ease the computational complexity introduced by a large number of scenarios. Furthermore, to show the impact of solar photovoltaic (PV) generation on system resilience, three types of PV systems are considered during a power outage and the resilience improvements with different PV penetration levels are compared. Numerical results from simulations on a large-scale (more than 10,000 nodes) distribution feeder have been used to validate the effectiveness and scalability of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Q-Learning-Based Impact Assessment of Propagating Extreme Weather on Distribution Grids

The increasing number of power outage events due to extreme weather conditions is hampering us socioeconomically. Preparing in advance for the extreme weather event is critical. It can help utility operators to reduce grid damages, restore grid service quickly, allocate energy resources and repair crews strategically, and hence dramatically increase grid resilience. In this paper, we propose a method to identify the sequence of worst impact zones in the power grid caused by extreme weather events based on Q-learning (a reinforcement learning algorithm). To quantity the weather severity and its effect on the grid, we model the impact of extreme weather on the grid as a function of intensity, vulnerability, and exposure. A modified IEEE 123-node distribution feeder is presented in a mesh grid and experimented for sequences of zones identification. Finally, simulation results present the identified sequences and their associated impacts on the grid caused by extreme weather events.

distribution system↗

Switching Device-Cognizant Sequential Distribution System Restoration

This paper presents an optimization framework for sequential reconfiguration using an assortment of switching devices and repair process in distribution system restoration. Compared to existing studies, this paper considers types, capabilities and operational limits of different switching devices, making it applicable in practice. We develop a novel multi-phase method to find the optimal sequential operation of various switching devices and repair faulted areas. We consider circuit breakers, reclosers, sectionalizers, load breaker switches, and fuses. The switching operation problem is decomposed into two mixed-integer linear programming (MILP) subproblems. The first subproblem determines the optimal network topology and estimates the number of steps to reach that topology, while the second subproblem generates a sequence of switching operations to coordinate the switches. For repairing the faults, we design an MILP model that dispatches repair crews to clear faults and replace melted fuses. After clearing a fault, we update the topology of the network by generating a new sequence of switching operations, and the process continues until all faults are cleared. To improve the computational efficiency, a network reduction algorithm is developed to group line sections, such that only switchable sections are present in the reduced network. The proposed method is validated on the IEEE 123-bus and 8500-bus systems.

distribution system↗

Multi-Agent Simulation Based Framework for Power Restoration Time Estimation at Distribution Level

The growing frequency of power outages has prompted increased interest in developing a more resilient power grid that can quickly recover from weather-related damage. At the distribution level, power restoration is a complex, multi-stage process involving multiple response entities. Providing utility stakeholders, government regulators, and the public with information about outage duration and estimated time to restoration is crucial. The research employs a multi-agent simulation approach, which allows for the simulation of decision-making behaviors among different entities and the incorporation of various uncertainties. Specifically, the study uses the open-source simulation package Mesa-Geo in conjunction with the Python language and constructs a road network using the open-source network extension pgRouting for routing queries. The research design includes several experiments focused on Florida as a case study, comparing repair crew sizes, power outage numbers, and road damage scenarios. The findings could offer valuable managerial guidance on resource allocation in the restoration process.

Chen, Yang↗

A Closed-Loop Distribution System Restoration Tool for Natural Disaster Recovery. Final CRADA report

We propose to continue the development of the restoration algorithms and the tool’s user interface, both of which have been developed under the GMLC-0131 project. This project aims to develop a distribution restoration decision support tool that will assist utilities in performing distribution restoration after extreme weather events in an optimal and efficient manner. The tool will integrate the weather information/forecasts and system fragility assessment together with the field measurement data to improve the situational awareness and estimate the system damage status. Advanced optimization models will be leveraged to dispatch repair crews and associated resources. New resources (e.g., automatic switches and distributed generators (DGs)) enabled by distribution automation and smart grid development will be utilized to reconfigure distribution grids and pick up loads promptly to reduce the outage sizes and durations. The closed-loop feature of the tool will make the tool adaptive to the evolving weather events and varying restoration capabilities. In this CRADA, we will collaborate with S&C Electric Company (S&C) to refine ANL-1060 (07/17/2019) the restoration algorithms that can be potentially applicable for any utility systems and vendor products, including: 1) Customizable information from both utility users and vendor users; 2) User interface design.

54 ENVIRONMENTAL SCIENCES↗

Cable-fault locator

Inexpensive system automatically indicates location of short-circuited section of power cable. Monitor does not require that cable be disconnected from its power source or that test signals be applied. Instead, ground-current sensors are installed in manholes or at other selected locations along cable run. When fault occurs, sensors transmit information about fault location to control center. Repair crew can be sent to location and cable can be returned to service with minimum of downtime.

Cason, R. L.↗

Satellite Power Systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis

The economic and programmatic requirements for a recommended SPS solar photovoltaic baseline concept were analyzed. Costs are determined for the DDT&E; initial capital investment (covers initial procurement and emplacement of each SPS plant and equipment); replacement capital investment (capital asset replacement over the SPS operating life); operations and maintenance (expendables, minor maintenance, repair crews); and taxes/insurance.

Hanley, G.↗

Underground Coal Mining

Computer program models coal-mining production, equipment failure and equipment repair. Underground mine is represented as collection of work stations requiring service by production and repair crews alternately. Model projects equipment availability and productivity, and indicates proper balance of labor and equipment. Program is in FORTRAN IV for batch execution; it has been implemented on UNIVAC 1108.

Hill, G. M.↗

RSM 1.0 user's guide: A resupply scheduler using integer optimization

The Resupply Scheduling Model (RSM) is a PC based, fully menu-driven computer program. It uses integer programming techniques to determine an optimum schedule to replace components on or before a fixed replacement period, subject to user defined constraints such as transportation mass and volume limits or available repair crew time. Principal input for RSJ includes properties such as mass and volume and an assembly sequence. Resource constraints are entered for each period corresponding to the component properties. Though written to analyze the electrical power system on the Space Station Freedom, RSM is quite general and can be used to model the resupply of almost any system subject to user defined resource constraints. Presented here is a step by step procedure for preparing the input, performing the analysis, and interpreting the results. Instructions for installing the program and information on the algorithms are given.

Viterna, Larry A.↗

Pre-Launch GOES-R Risk Reduction Activities for the Geostationary Lightning Mapper

The GOES-R Geostationary Lightning Mapper (GLM) is a new instrument planned for GOES-R that will greatly improve storm hazard nowcasting and increase warning lead time day and night. Daytime detection of lightning is a particularly significant technological advance given the fact that the solar illuminated cloud-top signal can exceed the intensity of the lightning signal by a factor of one hundred. Our approach is detailed across three broad themes which include: Data Processing Algorithm Readiness, Forecast Applications, and Radiance Data Mining. These themes address how the data will be processed and distributed, and the algorithms and models for developing, producing, and using the data products. These pre-launch risk reduction activities will accelerate the operational and research use of the GLM data once GOES-R begins on-orbit operations. The GLM will provide unprecedented capabilities for tracking thunderstorms and earlier warning of impending severe and hazardous weather threats. By providing direct information on lightning initiation, propagation, extent, and rate, the GLM will also capture the updraft dynamics and life cycle of convective storms, as well as internal ice precipitation processes. The GLM provides information directly from the heart of the thunderstorm as opposed to cloud-top only. Nowcasting applications enabled by the GLM data will expedite the warning and response time of emergency management systems, improve the dispatch of electric power utility repair crews, and improve airline routing around thunderstorms thereby improving safety and efficiency, saving fuel and reducing delays. The use of GLM data will assist the Bureau of Land Management (BLM) and the Forest Service in quickly detecting lightning ground strikes that have a high probability of causing fires. Finally, GLM data will help assess the role of thunderstorms and deep convection in global climate, and will improve regional air quality and global chemistry/climate modeling. The GLM has a robust design that benefits and improves upon its strong heritage of NASA-developed LEO predecessors, the Optical Transient Detector (OTD) and the Lightning Imaging Sensor (LIS). GLM will have a substantially larger number of pixels within the focal plane, two lens systems, and multiple Real-Time Event Processors REPS for on-board event detection and data compression to provide continuous observations of the Americas and adjacent oceans.

Goodman, S. J.↗

Availability Estimation for Facilities in Extreme Geographical Locations

A value added analysis for the Reliability. Availability and Maintainability of McMurdo Ground Station was developed, which will be a useful tool for system managers in sparing, maintenance planning and determining vital performance metrics needed for readiness assessment of the upgrades to the McMurdo System. Output of this study can also be used as inputs and recommendations for the application of Reliability Centered Maintenance (RCM) for the system. ReliaSoft's BlockSim. a commercial Reliability Analysis software package, has been used to model the availability of the system upgrade to the National Aeronautics and Space Administration (NASA) Near Earth Network (NEN) Ground Station at McMurdo Station in the Antarctica. The logistics challenges due to the closure of access to McMurdo Station during the Antarctic winter was modeled using a weighted composite of four Weibull distributions. one of the possible choices for statistical distributions throughout the software program and usually used to account for failure rates of components supplied by different manufacturers. The inaccessibility of the antenna site on a hill outside McMurdo Station throughout one year due to severe weather was modeled with a Weibull distribution for the repair crew availability. The Weibull distribution is based on an analysis of the available weather data for the antenna site for 2007 in combination with the rules for travel restrictions due to severe weather imposed by the administrating agency, the National Science Foundation (NSF). The simulations resulted in an upper bound for the system availability and allowed for identification of components that would improve availability based on a higher on-site spare count than initially planned.

Fischer, Gerd M.↗

Q-Learning Based Impact Assessment of Propagating Extreme Weather on Distribution Grids: Preprint

Increasing number of power outage events due to extreme weather condition is hampering us socioeconomically. Preparing in advance for the extreme weather event is critical and can help utility operators to reduce grid damages, restore grid service quickly, allocate energy resources and repair crews strategically, and hence dramatically increase grid resilience. In this paper, we propose a method to identify the sequence of worst impact zones in the power grid caused by extreme weather events based on Q-learning (a reinforcement learning algorithm). To quantify weather severity and it’s effect on the grid, we model the impact of extreme weather on the grid as a function of intensity, vulnerability and exposure. A modified IEEE 123-node distribution feeder is presented in a mesh grid and experimented for sequences of zones identification. Finally, simulation results present the identified sequences and their associated impacts on the grid caused by the extreme weather events.

distribution system↗

Preventive Power Outage Estimation Based on A Novel Scenario Clustering Strategy: Preprint

The increasing occurrence of extreme weather events is challenging the power grid operation. In front of the extreme weather, the system operator is responsible for estimating the power outage and scheduling the restoration resources. This paper proposes an outage evaluation framework to identify the possible unserved load profiles, vulnerable areas, and mobile energy adequacy. The predicted vulnerable lines of an outage prediction model tool are utilized to generate numerous faulted line scenarios. Next, each scenario's nodal unserved load profile is obtained by solving a three-phase restoration model that considers the schedule of repair crews and mobile energy resources. Then, a novel scenario clustering strategy is developed to cluster the unserved load profiles into multiple representative ones for straightforward analysis. Finally, case studies on a distribution system evaluate the damage level brought by extreme weather and verify the effectiveness of the proposed scenario clustering strategy.

mobile energy resources↗

Assessment of Crew Time for Maintenance and Repair Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, understanding how crew repair and maintenance timelines are impacted by mission operations and technology changes is vital for future mission planning. Past work has been done using historical International Space Station (ISS) data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available datasets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat (SH), and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA ISS maintenance and crew time data are logged into two central databases: the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS). Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair time for each failure and repair event. The entire maintenance activity dataset is then categorized based on the class of failed component to ensure a significant sample size for each class and accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time to Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. The authors applied these modeling methods to a case study of a crewed mission to the planned SH and produced expected corrective maintenance crew time distributions. The results produced an expected corrective maintenance crew time at over 24 hours per mission, and a maintenance crew time distribution that reflects the importance of planning for sufficient maintenance requirements each mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗