Search NASA⌕ Search

SEARCH · Search NASA

Results for “required functional design criteria”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Application of Framework for Integrating Safety, Security and Safeguards (3Ss) into the Design Of Used Nuclear Fuel Storage Facility

Department of Energy’s Office of Nuclear Energy, Fuel Cycle Research and Development develops options to the current commercial fuel cycle management strategy to enable the safe, secure, economic, and sustainable expansion of nuclear energy while minimizing proliferation risks by conducting research and development focused on used nuclear fuel recycling and waste management to meet U.S. needs. Used nuclear fuel is currently stored onsite in either wet pools or in dry storage systems, with disposal envisioned in interim storage facility and, ultimately, in a deep-mined geologic repository. The safe management and disposition of used nuclear fuel and/or nuclear waste is a fundamental aspect of any nuclear fuel cycle. Integrating safety, security, and safeguards (3Ss) fully in the early stages of the design process for a new nuclear facility has the potential to effectively minimize safety, proliferation, and security risks. The 3Ss integration framework could become the new national and international norm and the standard process for designing future nuclear facilities. The purpose of this report is to develop a framework for integrating the safety, security and safeguards concept into the design of Used Nuclear Fuel Storage Facility (UNFSF). The primary focus is on integration of safeguards and security into the UNFSF based on the existing Nuclear Regulatory Commission (NRC) approach to addressing the safety/security interface (10 CFR 73.58 and Regulatory Guide 5.73) for nuclear power plants. The methodology used for adaptation of the NRC safety/security interface will be used as the basis for development of the safeguards /security interface and later will be used as the basis for development of safety and safeguards interface. Then this will complete the integration cycle of safety, security, and safeguards. The overall methodology for integration of 3Ss will be proposed, but only the integration of safeguards and security will be applied to the design of the UNFSF. The framework for integration of safeguards and security into the UNFSF will include 1) identification of applicable regulatory requirements, 2) selection of a common system that share dual safeguard and security functions, 3) development of functional design criteria and design requirements for the selected system, 4) identification and integration of the dual safeguards and security design requirements, and 5) assessment of the integration and potential benefit.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems and Components,” represents a key element in the development of a framework for the efficient licensing of advanced non-Light Water Reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the United States Department of Energy (DOE).

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0. NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs. The NEI guidance document provides one acceptable means for addressing the aforementioned topics as part of demonstrating a specific design provides reasonable assurance of adequate radiological protection. This report provides the framework and associated methodology guidelines and discussion for establishing, then evaluating, confirming, and documenting the adequacy of defense-in-depth (DID) for advanced non-light-water reactor technologies. It was developed as part of the Licensing Modernization Project led by Southern Company and cost-shared by the United States Department of Energy and has benefited from considerable NRC formal reviews and public workshops. The methodology converts the DID philosophy into a structured process that is implementable, embraces existing United States and international definitions and philosophies of DID that set the foundation for the process. It builds on the DID framework developed in the Department of Energy Next Generation Nuclear Plant Project and earlier works on this subject. The approach to establishing DID adequacy involves the incorporation of DID attributes into the plant capabilities and programmatic elements of DID. The integrated evaluation of DID adequacy includes both quantitative elements to incorporate risk-informed and performance-based (RIPB) considerations and qualitative elements that address uncertainties and limitations in the quantitative models and supporting data. Demonstration of DID adequacy ensures that there are multiple layers of defense for risk-significant challenges to the design and that the plant capabilities and programs that support each layer are provided in a manner that minimizes dependencies among these layers. The focus of this report is assurance of DID adequacy with respect to protection of the public from radiological exposures resulting from accidental releases of radioactive material. While other hazards are not specifically addressed, this methodology is expected to be beneficial for determining DID adequacy for them as well. Risk-informed evaluation of DID considers the integrated performance of all plant SSCs and associated programs to manage daily operational activities, transients, and accidents, including the evaluation of strategies for accident prevention and mitigation. The RIPB LBE scenario methodology used in this evaluation defines the challenges to the plant safety features included in the plant design basis and beyond, and the scope of all deterministic and probabilistic safety evaluations. By examining event sequences across the whole spectrum of LBEs, a systematic assessment of DID can be accomplished.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: LMP Lessons Learned, Best Practices, and Frequently Asked Questions

This report captures lessons learned, best practices, and frequently asked questions with responses gleaned from the experiences of early adopters of the LMP RIPB process. Interviews were conducted in late 2019 with five non-LWR design organizations to gather their feedback on the application of the LMP RIPB process under real production conditions. The overall feedback from the reactor developers is that the LMP RIPB process can be successfully implemented with material benefits to the designer. As with any new processes, numerous challenges and questions were relayed by the designers. These challenges have been translated into lessons learned and best practices. Those two sections address both technical and organizational aspects of implementing the LMP RIPB process. Questions that were asked by multiple designers were turned into “frequently asked questions” and responses were provided by the LMP team.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors (Final Project Report)

Advanced (i.e., non-light-water) reactor technologies offer developers new opportunities to enhance the reliability, efficiency, and safety of nuclear power reactors through changes in fundamental design and operation. A variety of advanced design concepts are being developed that generally trend toward increased reliance on innovative, inherent, and passive safety features. Many of these features are substantially different from components now found in large light water reactors (LWRs) that dominate the commercial operating fleet. Similarly, non-light water reactor (non-LWR) suppliers are also pursuing market niches quite different from the regional baseload power generation sites typically associated with large LWR facilities.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Selection and Evaluation of Licensing Basis Events

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Selection and Evaluation of Licensing Basis Events,” represents a key element in the development of a methodology for the efficient licensing of advanced non-light water reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the U.S. Department of Energy (DOE). The LMP will result in detailed proposals for establishing licensing technical requirements to facilitate risk-informed and performance-based design and licensing of advanced non-LWRs. Such a methodology acknowledges enhancements in safety achievable with advanced designs and reflects more recent states of knowledge regarding safety and design innovation, creating an opportunity for reduced regulatory complexity with increased levels of safety. The project builds on best practices as well as previous activities through DOE and industry-sponsored advanced reactor licensing initiatives.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach,” represents a key element in the development of a methodology for the efficient licensing of advanced non-light water reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the U.S. Department of Energy (DOE). The LMP has developed detailed proposals for establishing licensing technical requirements to facilitate risk-informed and performance-based design and licensing of advanced non-LWRs. Such a methodology acknowledges enhancements in safety achievable with advanced designs and reflects more recent states of knowledge regarding safety and design innovation, creating an opportunity for reduced regulatory complexity with increased levels of safety. The project builds on best practices, as well as previous activities through DOE and industry-sponsored advanced reactor licensing initiatives.

42 ENGINEERING↗

Advanced flight deck/crew station simulator functional requirements

This report documents a study of flight deck/crew system research facility requirements for investigating issues involved with developing systems, and procedures for interfacing transport aircraft with air traffic control systems planned for 1985 to 2000. Crew system needs of NASA, the U.S. Air Force, and industry were investigated and reported. A matrix of these is included, as are recommended functional requirements and design criteria for simulation facilities in which to conduct this research. Methods of exploiting the commonality and similarity in facilities are identified, and plans for exploiting this in order to reduce implementation costs and allow efficient transfer of experiments from one facility to another are presented.

Wall, R. L.↗

Space tug point design study. Volume 2: Operations, performance and requirements

A design study to determine the configuration and characteristics of a space tug was conducted. Among the subjects analyzed in the study are: (1) flight and ground operations, (2) vehicle flight performance and performance enhancement techniques, (3) flight requirements, (4) basic design criteria, and (5) functional and procedural interface requirements between the tug and other systems.

Source record↗

Metallic Fuel Performance Code Requirements for the Versatile Test Reactor Project

Metallic nuclear fuels have been proposed for use in several emerging nuclear reactor designs, and a number of codes have been developed to model these fuels and assess their performance. Qualification of these metallic nuclear fuels will ultimately require monitored irradiation of lead test assemblies, but the use of fuel performance codes can reduce the uncertainty associated with these efforts by quantifying uncertainties and estimating margins to failure ahead of time. In this work, metallic fuel performance code requirements are defined for the Versatile Test Reactor (VTR) project using input from the Experimental Breeder Reactor II functional requirements, operational requirements, and design criteria. This work focuses on the thermomechanical responses and irradiation behaviors of metallic fuel elements that are representative of the proposed VTR driver fuel design concepts. As such, many of the code requirements and physics/modeling discussions in this work are expected to be broadly applicable to metallic fuel applications outside of the VTR project.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Space station Simulation Computer System (SCS) study for NASA/MSFC. Volume 4: Conceptual design report

The Simulation Computer System (SCS) is the computer hardware, software, and workstations that will support the Payload Training Complex (PTC) at Marshall Space Flight Center (MSFC). The PTC will train the space station payload scientists, station scientists, and ground controllers to operate the wide variety of experiments that will be onboard the Space Station Freedom. In the first step of this task, a methodology was developed to ensure that all relevant design dimensions were addressed, and that all feasible designs could be considered. The development effort yielded the following method for generating and comparing designs in task 4: (1) Extract SCS system requirements (functions) from the system specification; (2) Develop design evaluation criteria; (3) Identify system architectural dimensions relevant to SCS system designs; (4) Develop conceptual designs based on the system requirements and architectural dimensions identified in step 1 and step 3 above; (5) Evaluate the designs with respect to the design evaluation criteria developed in step 2 above. The results of the method detailed in the above 5 steps are discussed. The results of the task 4 work provide the set of designs which two or three candidate designs are to be selected by MSFC as input to task 5-refine SCS conceptual designs. The designs selected for refinement will be developed to a lower level of detail, and further analyses will be done to begin to determine the size and speed of the components required to implement these designs.

Source record↗

Polar Drive Ignition Campaign: Conceptual Design

The Laboratory for Laser Energetics (LLE) at the University of Rochester is proposing a collaborative effort with Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratories (LANL), the Naval Research Laboratory (NRL), and General Atomics (GA) with the goal of developing a cryogenic polar drive (PD) ignition platform on the National Ignition Facility (NIF). The scope of this proposed project requires close discourse among theorists, experimentalists, and laser and system engineers. This document describes how this proposed project can be broken into a series of parallel independent activities that, if implemented, could deliver this goal in the 2017 timeframe. This Conceptual Design document is arranged into two sections: mission need and design requirements. Design requirements are divided into four subsystems: (1) A point design that details the necessary target specifications and laser pulse requirements; (2) The beam smoothing subsystem that describes the MultiFM 1D smoothing by spectral dispersion (SSD); (3) New optical elements that include continuous phase plates (CPP's) and distributed polarization rotators (DPR's); and (4) The cryogenic target handling and insertion subsystem, which includes the design, fabrication, testing, and deployment of a dedicated PD ignition target insertion cryostat (PD-ITIC). This document includes appendices covering: the primary criteria and functional requirements, the system design requirements, the work breakdown structure, the target point design, the experimental implementation plan, the theoretical unknowns and technical implementation risks, the estimated cost and schedule, the development plan for the DPR's, the development plan for MultiFM 1D SSD, and a list of acronym definitions. While work on the facility modifications required for PD ignition has been in progress for some time, some of the technical details required to define the specific modifications for a Conceptual Design Review (CDR) remain to be defined. In all cases, the facility modifications represent functional changes to existing systems or capabilities. The bulk of the scope yet to be identified is associated with the DPR's and MultiFM beam smoothing. Detailed development plans for these two subsystems are provided in Appendices H and I; additional discussion of subsystem requirements based on the physics of PD ignition is given in Section 3. Accordingly, LLE will work closely with LLNL to develop detailed conceptual designs for the PD-specific facility modifications, including assessments of the operational impact of implementation (e.g., changing optics for direct rather than indirect-drive illumination and swapping from a hohlraum-based ITIC to one that supports PD). Furthermore, the experimental implementation plan represents the current best understanding of the experimental campaigns required to achieve PD ignition. This plan will evolve based on the lessons learned from the National Ignition Campaign (NIC) and ongoing indirect-drive ignition experiments. The plan does not take the operational realities of the PD configuration into account; configuration planning for the proposed PD experiments is beyond the scope of this document.

42 ENGINEERING↗

Project X functional requirements specification

Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

43 PARTICLE ACCELERATORS↗

National law enforcement telecommunications network

Alternative approaches are analyzed to a National Law Enforcement Telecommunications Network (NALECOM) designed to service all state-to-state and state-to-national criminal justice communications traffic needs in the United States. Network topology options were analyzed, and equipment and personnel requirements for each option were defined in accordance with NALECOM functional specifications and design guidelines. Evaluation criteria were developed and applied to each of the options leading to specific conclusions. Detailed treatments of methods for determining traffic requirements, communication line costs, switcher configurations and costs, microwave costs, satellite system configurations and costs, facilities, operations and engineering costs, network delay analysis and network availability analysis are presented. It is concluded that a single regional switcher configuration is the optimum choice based on cost and technical factors. A two-region configuration is competitive. Multiple-region configurations are less competitive due to increasing costs without attending benefits.

Reilly, N. B.↗

Low-Activity Waste Melter Process (LMP) System Design Description (Rev. 4)

This system design description (SDD) defines the technical, functional, and performance requirements of the low-activity waste (LAW) melter process system (LMP). This document details the waste treatment requirements, environmental compliance requirements, and authorization basis requirements of the LMP system as they are currently known and understood. This SDD describes the process and functional design requirements of the LMP, including the following: 1) Services and utility requirements, operating materials and supplies, and other external interfaces; 2) Operations limits and design bases; 3) Other criteria and requirements pertinent to the design of the LMP system; 4) Boundaries, system interfaces, and functional description of the LMP system. The LMP system is composed of two LAW melters of the same design with the contingency to add the third. Also included in the LMP system are the pour spouts, which are positioned under the melter discharge chambers of each melter, and the container level detectors. The boundaries, system interfaces, and functional description of the LMP system are provided in Section 2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rational Design of a Multifunctional Binder for High-Capacity Silicon-Based Anodes

Although several principles have been recognized to fabricate a nominal "better" binder, there continues to be a lack of a rational design and synthesis approach that would meet the robust criteria required for silicon (Si) anodes. Herein, we report a synthetic polymer binder, i.e., catechol-functionalized chitosan cross-linked by glutaraldehyde (CS-CG+GA), that serves dual functionalities: (a) wetness-resistant adhesion capability via catechol grafting and (b) mechanical robustness via in situ formation of a three-dimensional (3D) network. A SiNP-based anode with a designed functional polymer network (CS-CG10%+6%GA) exhibits a capacity retention of 91.5% after 100 cycles (2144 +/- 14 mAh/g). Properties that are traditionally considered to be advantageous, including stronger adhesion strength and higher mechanical robustness, do not always improve the binder performance. A clear relationship between these properties and ultimate electrochemical performance is established by assessing the rheological behavior, mechanical property, adhesion force, peel stress, morphology evolution, and semiquantitative evaluation. This study provides a clear path for the rational design of high-performance functional polymer binders for not only Si-based electrodes but also other types of alloy and conversion-based electrodes.

Cao, Peng-Fei↗

User interface design of software tool system as a technology transfer vehicle

Design considerations of an on going research project for developing an effective and easy to use tool system that supports entire maintenance phases are introduced. The primary focus is the design of an intelligent user interface mechanism. By analyzing why existing tools and tool systems are not used very effectively, we can define user requirements for the user interface mechanisms, specify design criteria of user interface functions, and introduce some features of the implementation. Because this project is still in process, intermediate evaluation and expected effectiveness are discussed.

Miyamoto, I.↗

Scheduler Design Criteria: Requirements and Considerations

This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

NASA-KAIA/KARI research collaboration↗