Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource estimates”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Comparison of regression modeling techniques for resource estimation

The development and validation of resource utilization models is an active area of software engineering research. Regression analysis is the principal tool employed in these studies. However, little attention was given to determining which of the various regression methods available is the most appropriate. The objective of the study is to compare three alternative regession procedures by examining the results of their application to one commonly accepted equations for resource estimation. The data studied was summarized, the resource estimation equation was described, the regression procedures were explained, and the results obtained from the proceures were compared.

Card, D. N.↗

Fairfax Water Resources: Estimating Urban Flood Susceptibility, Historical Flooding Extent, and Land Cover Change in Fairfax County, Virginia to Aid in Flood Mitigation Planning

Between 2000 and 2020, Fairfax County, Virginia experienced extreme weather events that caused severe flooding and degradation of roads, businesses, and other public property. A single flood event on July 8th, 2019 resulted in $14.8 million in damages. These flood events routinely impact the community, often resulting in power outages, school closures, and downed trees. The Fairfax County Department of Public Works and Environmental Services partnered with DEVELOP to explore how remotely sensed data could be integrated to support its current flood mitigation efforts. This project used environmental factors such as elevation, slope, and topographic wetness index from Earth observation derived data to map flood susceptibility. We utilized Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), Sentinel-1 C-Band Synthetic Aperture Radar (C-SAR), and Sentinel-2 Multispectral Instrument (MSI) to map historic flooding events in Fairfax County. These maps will support flood management practices for the Fairfax County Department of Public Works and Environmental Services through the integration of remotely sensed data. Our results show that developed areas in the county are more susceptible to flooding, coinciding with analysis of flood factors, which indicated that imperviousness and tree canopy were the most influential drivers in flood susceptibility. Other results show that using Earth observations to map historical flooding is limited in urban areas due to false positives from SAR imagery between water and shadows. Further research is necessary to evolve the historical flood mapping technique if Earth observations are to be incorporated in future historical flood analysis.

Kaitlynn Hietpas↗

Early estimation of resource expenditures and program size

A substantial amount of software engineering research effort was focused on the development of software estimation models. A measure of lines of code was derived based on the origin of the delivered code, L sub dev = N + E + 0.2 (S + O) (where L sub dev = developed lines of code, N = newly implemented lines of code, E = extensively modified lines of code, S = slightly modified lines of code, and O = old unchanged lines of code) that is substituted in the following equation H sub s = aL sup b (where H sub s = staff-hours of effort, L = lines of code, a = a constant, and b = a constant). The limitations of this model are discussed and some alternative estimation models that can be used earlier in the development process are proposed.

Card, D.↗

STS payloads mission control study continuation phase A-1. Volume 2-C, task 3: Identification of joint activities and estimation of resources in preparation for joint flight operations

Payload mission control concepts are developed for real time flight operations of STS. Flight planning, training, simulations, and other flight preparations are included. Payload activities for the preflight phase, activity sequences and organizational allocations, and traffic and experience factors to establish composite man-loading for joint STS payload activities are identified for flight operations from 1980 to 1985.

Source record↗

Testing and validating the CERES-wheat (Crop Estimation through Resource and Environment Synthesis-wheat) model in diverse environments

CERES-Wheat is a computer simulation model of the growth, development, and yield of spring and winter wheat. It was designed to be used in any location throughout the world where wheat can be grown. The model is written in Fortran 77, operates on a daily time stop, and runs on a range of computer systems from microcomputers to mainframes. Two versions of the model were developed: one, CERES-Wheat, assumes nitrogen to be nonlimiting; in the other, CERES-Wheat-N, the effects of nitrogen deficiency are simulated. The report provides the comparisons of simulations and measurements of about 350 wheat data sets collected from throughout the world.

Otter-Nacke, S.↗

Computing the Envelope for Stepwise Constant Resource Allocations

Estimating tight resource level is a fundamental problem in the construction of flexible plans with resource utilization. In this paper we describe an efficient algorithm that builds a resource envelope, the tightest possible such bound. The algorithm is based on transforming the temporal network of resource consuming and producing events into a flow network with noises equal to the events and edges equal to the necessary predecessor links between events. The incremental solution of a staged maximum flow problem on the network is then used to compute the time of occurrence and the height of each step of the resource envelope profile. The staged algorithm has the same computational complexity of solving a maximum flow problem on the entire flow network. This makes this method computationally feasible for use in the inner loop of search-based scheduling algorithms.

Muscettola, Nicola↗

An approach to software cost estimation

A general procedure for software cost estimation in any environment is outlined. The basic concepts of work and effort estimation are explained, some popular resource estimation models are reviewed, and the accuracy of source estimates is discussed. A software cost prediction procedure based on the experiences of the Software Engineering Laboratory in the flight dynamics area and incorporating management expertise, cost models, and historical data is described. The sources of information and relevant parameters available during each phase of the software life cycle are identified. The methodology suggested incorporates these elements into a customized management tool for software cost prediction. Detailed guidelines for estimation in the flight dynamics environment developed using this methodology are presented.

Mcgarry, F.↗

Galileo mission planning for Low Gain Antenna based operations

The Galileo mission operations concept is undergoing substantial redesign, necessitated by the deployment failure of the High Gain Antenna, while the spacecraft is on its way to Jupiter. The new design applies state-of-the-art technology and processes to increase the telemetry rate available through the Low Gain Antenna and to increase the information density of the telemetry. This paper describes the mission planning process being developed as part of this redesign. Principal topics include a brief description of the new mission concept and anticipated science return (these have been covered more extensively in earlier papers), identification of key drivers on the mission planning process, a description of the process and its implementation schedule, a discussion of the application of automated mission planning tool to the process, and a status report on mission planning work to date. Galileo enhancements include extensive reprogramming of on-board computers and substantial hard ware and software upgrades for the Deep Space Network (DSN). The principal mode of operation will be onboard recording of science data followed by extended playback periods. A variety of techniques will be used to compress and edit the data both before recording and during playback. A highly-compressed real-time science data stream will also be important. The telemetry rate will be increased using advanced coding techniques and advanced receivers. Galileo mission planning for orbital operations now involves partitioning of several scarce resources. Particularly difficult are division of the telemetry among the many users (eleven instruments, radio science, engineering monitoring, and navigation) and allocation of space on the tape recorder at each of the ten satellite encounters. The planning process is complicated by uncertainty in forecast performance of the DSN modifications and the non-deterministic nature of the new data compression schemes. Key mission planning steps include quantifying resource or capabilities to be allocated, prioritizing science observations and estimating resource needs for each, working inter-and intra-orbit trades of these resources among the Project elements, and planning real-time science activity. The first major mission planning activity, a high level, orbit-by-orbit allocation of resources among science objectives, has already been completed; and results are illustrated in the paper. To make efficient use of limited resources, Galileo mission planning will rely on automated mission planning tools capable of dealing with interactions among time-varying downlink capability, real-time science and engineering data transmission, and playback of recorded data. A new generic mission planning tool is being adapted for this purpose.

Gershman, R.↗

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Deep Space Network (DSN) Data Systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit DSN software life cycle statistics. The estimation model output scales a standard DSN Work Breakdown Structure skeleton, which is then input into a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. C.↗

Software cost/resource modeling: Deep space network software cost estimation model

A parametric software cost estimation model prepared for JPL deep space network (DSN) data systems implementation tasks is presented. The resource estimation model incorporates principles and data from a number of existing models, such as those of the General Research Corporation, Doty Associates, IBM (Walston-Felix), Rome Air Force Development Center, University of Maryland, and Rayleigh-Norden-Putnam. The model calibrates task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software lifecycle statistics. The estimation model output scales a standard DSN work breakdown structure skeleton, which is then input to a PERT/CPM system, producing a detailed schedule and resource budget for the project being planned.

Tausworthe, R. J.↗

Finding relationships between effort and other variables in the SEL

Estimating the amount of effort required for a software development project is one of the major aspects of resource estimation for that project. In this study, the relationship between effort and other variables for 23 Software Engineering Laboratory (SEL) projects that were developed for NASA/Goddard Space Flight Center was examined. These variables fell into two categories: those which can be determined in the early stages of project development and may therefore be useful in a baseline equation for predicting effort in future projects, and those which can be used mainly to characterize or evaluate effort requirements and thus enhance the understanding of the software development process in this environment. Some results of the analyses are presented.

Basili, Victor R.↗

Flight software memory sizing and CPU loading estimates

Estimates of the AP101 memory and central processing unit (CPU) requirements for the space shuttle orbiter are presented. The resource estimates reflect OASCAB approved change requests for Release 18 and Release 19. Memory sizes are presented in 32 bit full words, CPU loading is listed by percentage. Memory and CPU information was obtained from actual AP101 code where available, and from estimates provided by flight software development programmers.

Source record↗

Deep space network software cost estimation model

A parametric software cost estimation model prepared for Jet PRopulsion Laboratory (JPL) Deep Space Network (DSN) Data System implementation tasks is described. The resource estimation mdel modifies and combines a number of existing models. The model calibrates the task magnitude and difficulty, development environment, and software technology effects through prompted responses to a set of approximately 50 questions. Parameters in the model are adjusted to fit JPL software life-cycle statistics.

Tausworthe, R. C.↗