Search NASASearch

SEARCH · Search NASA

Results for “resource optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Methodologies for optimal resource allocation to the national space program and new space utilizations. Volume 1: Technical description

The optimal allocation of resources to the national space program over an extended time period requires the solution of a large combinatorial problem in which the program elements are interdependent. The computer model uses an accelerated search technique to solve this problem. The model contains a large number of options selectable by the user to provide flexible input and a broad range of output for use in sensitivity analyses of all entering elements. Examples of these options are budget smoothing under varied appropriation levels, entry of inflation and discount effects, and probabilistic output which provides quantified degrees of certainty that program costs will remain within planned budget. Criteria and related analytic procedures were established for identifying potential new space program directions. Used in combination with the optimal resource allocation model, new space applications can be analyzed in realistic perspective, including the advantage gain from existing space program plant and on-going programs such as the space transportation system.

Source record

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.

Iterative-deepening heuristic search for optimal and semi-optimal resource allocation

It is demonstrated that when iterative-deepening A asterisk (IDA asterisk) is applied to one type of resource allocation problem, it uses far less storage than A asterisk, but opens far more nodes and thus has unacceptable time complexity. This is shown to be due, at least in part, to the low-valued effective branching factor that is a characteristic of problems with real-valued cost functions. The semi-optimal, epsilon-admissible IDA asterisk sub epsilon search algorithm that the authors described was shown to open fewer nodes than both A asterisk and IDA asterisk with storage complexity proportional to the depth of the search tree.

Bridges, Susan M.

Optimizing resource allocation in Miscanthus breeding via sparse testing designs for genomic prediction

Phenotyping high-biomass perennial crops is laborious and the rate of genetic gain in conventional perennial crop breeding programs is typically low. So, it is especially important to identify methods that produce efficiency gains in the breeding process. Miscanthus is a C4 perennial grass with favorable characteristics for producing biomass as a feedstock for biofuels and diverse bio-based products. Increasing biomass yield will increase profitability and environmental benefits, so it is a key target for Miscanthus breeding. In addition, the identification of well-adapted genotypes across a wide range of environmental conditions requires the establishment of multi-environment trials (METs). Sparse testing is a genomic prediction-based strategy that reduces the phenotyping costs in METs by selecting a subset of genotypes to evaluate in a subset of environments and then predicts the performance of the unobserved genotype-environment combinations. A Miscanthus sacchariflorus (MSA) population comprising 336 genotypes observed across three environments was analyzed implementing sparse testing designs. Three prediction models considering main effects (environments, genotypes, genomic) and interaction effects (genotype-by-environment; G×E interaction) were implemented for forecasting dry biomass yield (YDY), total culm (TCM), average internode length (AIL), and culm node number (CNN). Multiple calibration sets based on different compositions and sizes were considered to evaluate performance in terms of the predictive ability (PA) and the mean square error (MSE) for a fixed testing set size. The training set size ranged from 52 to 112 to predict a fixed set of 224 unobserved genotypes across all three environments. The results showed that the model accounting for G×E interaction consistently presented the highest PA and the lowest MSE: for CNN (PA: ~0.77, MSE: ~0.5) and YDY (PA: ~0.70, MSE: ~1.3) while for TCM and AIL these ranged from ~0.28 to 0.41 and ~1.3 to 4.3, respectively. Overall, varying training sets and allocation strategies did not affect PA and MSE, with 52 non-overlapping and 0 overlapping genotypes per environment as the optimal cost-effective allocation framework. This suggests that implementing sparse testing designs could significantly reduce phenotyping costs by fivefold, without compromising PA in breeding programs for perennial crops such as Miscanthus.

Miscanthus sacchariflorus (MSA)

Methodologies for optimal resource allocation to the national space program and new space utilizations. Volume 2: Resource allocation and smoothing model, programmer's manual

Appendixes are presented that provide model input requirements, a sample case, flow charts, and a program listing. At the beginning of each appendix, descriptive details and technical comments are provided to indicate any special instructions applicable to the use of that appendix. In addition, the program listing includes comment cards that state the purpose of each subroutine in the complete program and describe operations performed within that subroutine. The input requirements includes details on the many options that adapt the program to the specific needs of the analyst for a particular problem.

Source record

Method for optimizing resource allocation in a government organization

The managers in Federal agencies are challenged to control the extensive activities in government and still provide high-quality products and services to the American taxpayers. Considering today's complex social and economic environment and the $3.8 billion daily cost of operating the Federal Government, it is evident that there is a need to develop decision-making tools for accurate resource allocation and total quality management. The goal of this thesis is to provide a methodical process that will aid managers in Federal Government to make budgetary decisions based on the cost of services, the agency's objectives, and the customers' perception of the agency's product. A general resource allocation procedure was developed in this study that can be applied to any government organization. A government organization, hereafter the 'organization,' is assumed to be a multidivision enterprise. This procedure was applied to a small organization for the proof of the concept. This organization is the Technical Services Directorate (TSD) at the NASA Lewis Research Center in Cleveland, Ohio. As part of the procedure, a nonlinear programming model was developed to account for the resources of the organization, the outputs produced by the organization, the decision-maker's views, and the customers' satisfaction with the organization. The information on the resources of the organization was acquired from current budget levels of the organization and the human resources assigned to the divisions. The outputs of the organization were defined and measured by identifying metrics that assess the outputs, the most challenging task in this study. The decision-maker's views are represented in the model as weights assigned to the various outputs and were quantified by using the analytic hierarchy process. The customer's opinions regarding the outputs of the organization were collected through questionnaires that were designed for each division individually. Following the philosophy of total quality management, information on customers' satisfaction is presented in the model as the quality of output. The model is a nonlinear one whose objective is to maximize customers' satisfaction such that the total cost of operation does not exceed the organization's budget. This model represents a structured approach or policy mechanism, at the agency level, to make capital investment decisions based on the priorities of the agency and the quality of outputs. This procedure applied to TSD resulted in a resources allocation scheme that was reasonable and acceptable to the decision-makers and, as expected, dependent on the assumptions and accuracy of the data used in the model.

Afarin, James

DEVELOPMENT AND APPLICATION OF RISK ANALYSIS TOOLKIT FOR PLANT RESOURCE OPTIMIZATION

This paper presents the development of methods and tools that are being designed to optimize plant operations (e.g., maintenance/replacement schedules and optimal maintenance postures for plant components) in a manner that is more cost effective than current approaches and makes better use of available component health and cost data. These methods include both data- and model-based optimization methods. Model-based optimization methods directly include reliability and cost models to determine an optimal plant operational strategy. We consider gradient-based and evolutionary (based on genetic algorithms) optimization methods. The second class of methods target more specific use cases (e.g., project schedule optimization) and are not based on reliability models directly, but they require specific component reliability and cost data. This class of methods is based on variants of the knapsack problem with an aim to determine an optimal project schedule that maximizes the overall NPV. This paper also presents multi-objective methods designed to identify an optimal maintenance posture based on a Pareto frontier analysis. Rather than dictating the “right” tradeoff (i.e., identify the absolute best posture), we show how it is possible to perform a trade space exploration approach (i.e., identify value and costs of several postures and let the analysis account for desired value and cost metrics). This is performed by identifying maintenance postures that maximize value (e.g., system availability) and minimize operational costs, i.e., the Pareto frontier in a value-cost trade space. For all these methods we present detailed applicative examples that show their validity from a decision-making perspective.

97 - MATHEMATICS AND COMPUTING

arco (Assembled Resource-Constrained Optimization) [SWR-26-030]

Arco (Assembled Resource-Constrained Optimization) is a memory-smart optimization DSL and solver for LP and MIP problems on constrained hardware. The software is an optimization framework built around a KDL-based domain-specific language and a CLI compiler/solver. You write optimization models in .kdl files, and the arco CLI compiles, validates, inspects, and solves them. Language bindings (Python today, more planned) provide programmatic access to the same engine. Built for harder optimization problems on constrained resources, Arco is intentional about every allocation, careful with stack and heap behavior, and relentless about minimizing memory usage so more systems can run real workloads. Arco is built primarily for internal use within our organization. You are welcome to try it, but we make no guarantees about API stability or robustness at this stage

Sanchez Perez, Pedro Andres [National Laboratory o

Powering Data Centers with Clean Energy: A Techno-Economic Case Study of Nuclear and Renewable Energy Dependability

Rising data demands from artificial intelligence (AI) and large language models (LLMs) generating images, videos, and text have prompted increased need for larger and more robust data centers in the United States. Major companies interested in these larger data centers face the choice of linking them to existing regional grids, building stand-alone power supplies onsite, or a combination of both. The request, review, and approval process for new transmission lines to grids in the United States, however, has grown in recent years to times spans rivaling those of new construction for nuclear power plants. Building an islanded power supply for each data center is therefore becoming a prominent option. In this case study, several technologies are modeled in techno-economic simulations for long-term system costs subject to fixed electricity demand from a singular data center. A 250 MWe data center is assumed with additional 50 MWe for resiliency. Techno-economic simulations are conducted using the Holistic Energy Resource Optimization Network (HERON) software, which is a part of the Framework for Optimization of Resources and Economics (FORCE) tool suite. Technologies considered include solar, wind, lithium-ion batteries, and several types of nuclear reactors: large-scale reactors, small modular reactors, and microreactors. A low- and high-cost estimate for each technology is assumed to develop a range of expected economic performance. Low-cost estimates included several clean energy production tax credits. Different combinations of renewable energy generators with nuclear reactors are considered, ranging from a fully renewable-powered data center to a fully nuclear-powered data center. Historic time series of wind and solar availability from the Texas grid are used to train a reduced order model; this model then generates unique time series with similar characteristics of the training dataset. Multiple scenarios of weather and subsequent operations are simulated for each renewable-nuclear combination to determine total costs throughout the project lifetime. Fully renewable-powered configurations required large amounts of installed capacity (GW scale) in the simulations to meet the fixed demand of the data center. This is due to some scenarios in the historical dataset which captured low-wind and low-solar days, requiring over-building of these technologies as well as batteries to compensate for the low amounts of electricity generation. Fully nuclear-powered configurations outperformed the fully renewable and mixed renewable-nuclear configurations in terms of cost, with ranges between $1B and $10B in 2023 USDs compared to $40B+ for fully renewable configurations. Of the nuclear technologies, small modular reactors performed better economically than large-scale nuclear models due to lower projected capital costs, and both performed better than the microreactor models. These results demonstrate the applicability of firm, dispatchable electricity resources from baseload generators like nuclear power plants for operating facilities that run at constant power without daily variability.

22 GENERAL STUDIES OF NUCLEAR REACTORS

Complete Demonstration of a Prototype Version of FORCE User Interface and Conduct Analyst Survey Collecting Feedback on Interface Features and Usability

In 2024 the US Department of Energy (DOE) Office of Nuclear Energy (NE) Integrated Energy System (IES) program continued to develop the Framework for Optimization of Resources and Economics (FORCE) analysis ecosystem into a more traditional toolset with simplified software installation, automated workflows, and interactive results visualization. The DOE-NE Nuclear Energy Advanced Modeling and Simulation (NEAMS) Workbench continued to be leveraged for user input, application workflow and runtime environment, and interactive results visualization capabilities. This report documents the demonstration of a FORCE User Interface (UI) prototype and the results of a survey of analysts’ using the Holistic Energy Resource Optimization Network (HERON) tool in FORCE with the prototype UI.

97 MATHEMATICS AND COMPUTING

Risk Analysis for Resource Planning Optimization

This paper describes a systems engineering approach to resource planning by integrating mathematical modeling and constrained optimization, empirical simulation, and theoretical analysis techniques to generate an optimal task plan in the presence of uncertainties.

optimization

Machine learning-driven predictive resource management in complex science workflows

Here, the collaborative efforts of large communities in science experiments, often comprising thousands of global members, reflect a monumental commitment to exploration and discovery. Recently, advanced and complex data processing has gained increasing importance in science experiments. Data processing workflows typically consist of multiple intricate steps, and the precise specification of resource requirements is crucial for each step to allocate optimal resources for effective processing. Estimating resource requirements in advance is challenging due to a wide range of analysis scenarios, varying skill levels among community members, and the continuously increasing spectrum of computing options. One practical approach to mitigate these challenges involves initially processing a subset of each step to measure precise resource utilization from actual processing profiles before completing the entire step. While this two-staged approach enables processing on optimal resources for most of the workflow, it has drawbacks such as initial inaccuracies leading to potential failures and suboptimal resource usage, along with overhead from waiting for initial processing completion, which is critical for fast-turnaround analyses. In this context, our study introduces a novel pipeline of machine learning models within a comprehensive workflow management system, the Production and Distributed Analysis (PanDA) system. These models employ advanced machine learning techniques to predict key resource requirements, overcoming challenges posed by limited upfront knowledge of characteristics at each step. Accurate forecasts of resource requirements enable informed and proactive decision-making in workflow management, enhancing the efficiency of handling diverse, complex workflows across heterogeneous resources.

97 MATHEMATICS AND COMPUTING

Risk Analysis for Resource Planning Optimization

The main purpose of this paper is to introduce a risk management approach that allows planners to quantify the risk and efficiency tradeoff in the presence of uncertainties, and to make forward-looking choices in the development and execution of the plan. Demonstrate a planning and risk analysis framework that tightly integrates mathematical optimization, empirical simulation, and theoretical analysis techniques to solve complex problems.

resource planning optimization

The Effects of Task Structure on Time-sharing Efficiency and Resource Allocation Optimality

A distinction was made between two aspects of time sharing performance: time sharing efficiency and attention allocation optimality. A secondary task technique was employed to evaluate the effects of the task structures of the component time shared tasks on both aspects of the time sharing performance. Five pairs of dual tasks differing in their structural configurations were investigated. The primary task was a visual/manual tracking task which requires spatial processing. The secondary task was either another tracking task or a verbal memory task with one of four different input/output configurations. Congruent to a common finding, time-sharing efficiency was observed to decrease with an increasing overlap of resources utilized by the time shared tasks. Research also tends to support the hypothesis that resource allocation is more optimal when the time shared tasks placed heavy demands on common processing resources than when they utilized separate resources.

Tsang, P. S.

GlideinBenchmark: collecting resource information to optimize provisioning

Choosing the right resource can speedup jobs completion, better utilize the available hardware and visibly reduce costs, especially when renting computers on the cloud. This was demonstrated in earlier studies on HEPCloud. But the benchmarking of the resources proved to be a laborious and time-consuming process. This paper presents GlideinBenchmark, a new Web application leveraging the pilot infrastructure of GlideinWMS to benchmark resources, and shows how to use the data collected and published by GlideinBenchmark to automate the optimal selection of resources. An experiment can select the benchmark or the set of benchmarks that most closely evaluate the performance of its workflows. With GlideinBenchmark and the help of the GldieinWMS Factory it controls the benchmark execution. Finally, a scheduler like HEPCloud’s Decision Engine can use the results to optimize resource provisioning.

Mambelli, Marco

GlideinBenchmark: collecting resource information to optimize provisioning

Choosing the right resource can speed up job completion, better utilize the available hardware, and visibly reduce costs, especially when renting computers in the cloud. This was demonstrated in earlier studies on HEPCloud. However, the benchmarking of the resources proved to be a laborious and time-consuming process. This paper presents GlideinBenchmark, a new Web application leveraging the pilot infrastructure of GlideinWMS to benchmark resources, and it shows how to use the data collected and published by GlideinBenchmark to automate the optimal selection of resources. An experiment can select the benchmark or the set of benchmarks that most closely evaluate the performance of its workflows. GlideinBenchmark, with the help of the GlideinWMS Factory, controls the benchmark execution. Finally, a scheduler like HEPCloud's Decision Engine can use the results to optimize resource provisioning.

Mambelli, Marco [Fermilab] (ORCID:0000000294892681

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY