Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource reservation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Study of Quality of Service Communication for High-Speed Packet-Switching Computer Sub-Networks

In this thesis, we analyze various factors that affect quality of service (QoS) communication in high-speed, packet-switching sub-networks. We hypothesize that sub-network-wide bandwidth reservation and guaranteed CPU processing power at endpoint systems for handling data traffic are indispensable to achieving hard end-to-end quality of service. Different bandwidth reservation strategies, traffic characterization schemes, and scheduling algorithms affect the network resources and CPU usage as well as the extent that QoS can be achieved. In order to analyze those factors, we design and implement a communication layer. Our experimental analysis supports our research hypothesis. The Resource ReSerVation Protocol (RSVP) is designed to realize resource reservation. Our analysis of RSVP shows that using RSVP solely is insufficient to provide hard end-to-end quality of service in a high-speed sub-network. Analysis of the IEEE 802.lp protocol also supports the research hypothesis.

Cui, Zhenqian↗

Protecting Customer Privacy Through Distributed Energy Resource Anonymization

Due to their stochastic nature, the increase of Renewable Energy Resources (RERs) as a primary source of energy for power grids creates challenges regarding the reliability and resilience of the system. In order to combat these obstacles, expansion of Distributed Energy Resources (DERs) and their participation in Demand Response (DR) programs is necessary. Widespread participation requires prioritizing customer privacy and addressing concerns that may arise regarding communication between DERs and the Grid Service Provider (GSP). This paper discusses the use of flow reservation resources to split the operating cycles of DER load profiles into unique phases. The splitting of phases increases anonymization of the DERs by making it more difficult to determine the individual characteristics of the device. We discuss an example of this using simulated DER load profile data and examine the resulting effectiveness by using a machine learning algorithm for classification, called Support Vector Machine (SVM).

Distributed Energy Resource, Anonymization, Renewa↗

DRAS: Deep Reinforcement Learning for Cluster Scheduling in High Performance Computing

Cluster schedulers are crucial in high-performance computing (HPC). They determine when and which user jobs should be allocated to available system resources. Existing cluster scheduling heuristics are developed by human experts based on their experience with specific HPC systems and workloads. However, the increasing complexity of computing systems and the highly dynamic nature of application workloads have placed tremendous burden on manually designed and tuned scheduling heuristics. More aggressive optimization and automation are needed for cluster scheduling in HPC. In this work, we present an automated HPC scheduling agent named DRAS (Deep Reinforcement Agent for Scheduling) by leveraging deep reinforcement learning. DRAS is built on a hierarchical neural network incorporating special HPC scheduling features such as resource reservation and backfilling. An efficient training strategy is presented to enable DRAS to rapidly learn the target environment. Once being provided a specific scheduling objective given by the system manager, DRAS automatically learns to improve its policy through interaction with the scheduling environment and dynamically adjusts its policy as workload changes. We implement DRAS into a HPC scheduling platform called CQGym. CQGym provides a common platform allowing users to flexibly evaluate DRAS and other scheduling methods such as heuristic and optimization methods. Furthermore, the experiments using CQGym with different production workloads demonstrate that DRAS outperforms the existing heuristic and optimization approaches by up to 50%.

97 MATHEMATICS AND COMPUTING↗

NREM sleep as a novel protective cognitive reserve factor in the face of Alzheimer's disease pathology

Alzheimer’s disease (AD) pathology impairs cognitive function. Yet some individuals with high amounts of AD pathology suffer marked memory impairment, while others with the same degree of pathology burden show little impairment. Why is this? One proposed explanation is cognitive reserve i.e., factors that confer resilience against, or compensation for the effects of AD pathology. Deep NREM slow wave sleep (SWS) is recognized to enhance functions of learning and memory in healthy older adults. However, that the quality of NREM SWS (NREM slow wave activity, SWA) represents a novel cognitive reserve factor in older adults with AD pathology, thereby providing compensation against memory dysfunction otherwise caused by high AD pathology burden, remains unknown. Here, we tested this hypothesis in cognitively normal older adults (N = 62) by combining 11 C-PiB (Pittsburgh compound B) positron emission tomography (PET) scanning for the quantification of β-amyloid (Aβ) with sleep electroencephalography (EEG) recordings to quantify NREM SWA and a hippocampal-dependent face-name learning task. We demonstrated that NREM SWA significantly moderates the effect of Aβ status on memory function. Specifically, NREM SWA selectively supported superior memory function in individuals suffering high Aβ burden, i.e., those most in need of cognitive reserve (B = 2.694, p = 0.019). In contrast, those without significant Aβ pathological burden, and thus without the same need for cognitive reserve, did not similarly benefit from the presence of NREM SWA (B = -0.115, p = 0.876). This interaction between NREM SWA and Aβ status predicting memory function was significant after correcting for age, sex, Body Mass Index, gray matter atrophy, and previously identified cognitive reserve factors, such as education and physical activity (p = 0.042). These findings indicate that NREM SWA is a novel cognitive reserve factor providing resilience against the memory impairment otherwise caused by high AD pathology burden. Furthermore, this cognitive reserve function of NREM SWA remained significant when accounting both for covariates, and factors previously linked to resilience, suggesting that sleep might be an independent cognitive reserve resource. Beyond such mechanistic insights are potential therapeutic implications. Unlike many other cognitive reserve factors (e.g., years of education, prior job complexity), sleep is a modifiable factor. As such, it represents an intervention possibility that may aid the preservation of cognitive function in the face of AD pathology, both present moment and longitudinally.

60 APPLIED LIFE SCIENCES↗

CCSDS Time-Critical Onboard Networking Service

The Consultative Committee for Space Data Systems (CCSDS) is developing recommendations for communication services onboard spacecraft. Today many different communication buses are used on spacecraft requiring software with the same basic functionality to be rewritten for each type of bus. This impacts on the application software resulting in custom software for almost every new mission. The Spacecraft Onboard Interface Services (SOIS) working group aims to provide a consistent interface to various onboard buses and sub-networks, enabling a common interface to the application software. The eventual goal is reusable software that can be easily ported to new missions and run on a range of onboard buses without substantial modification. The system engineer will then be able to select a bus based on its performance, power, etc and be confident that a particular choice of bus will not place excessive demands on software development. This paper describes the SOIS Intra-Networking Service which is designed to enable data transfer and multiplexing of a variety of internetworking protocols with a range of quality of service support, over underlying heterogeneous data links. The Intra-network service interface provides users with a common Quality of Service interface when transporting data across a variety of underlying data links. Supported Quality of Service (QoS) elements include: Priority, Resource Reservation and Retry/Redundancy. These three QoS elements combine and map into four TCONS services for onboard data communications: Best Effort, Assured, Reserved, and Guaranteed. Data to be transported is passed to the Intra-network service with a requested QoS. The requested QoS includes the type of service, priority and where appropriate, a channel identifier. The data is de-multiplexed, prioritized, and the required resources for transport are allocated. The data is then passed to the appropriate data link for transfer across the bus. The SOIS supported data links may inherently provide the quality of service support requested by the intra-network layer. In the case where the data link does not have the required level of support, the missing functionality is added by SOIS. As a result of this architecture, re-usable software applications can be designed and used across missions thereby promoting common mission operations. In addition, the protocol multiplexing function enables the blending of multiple onboard networks. This paper starts by giving an overview of the SOIS architecture in section 11, illustrating where the TCONS services fit into the overall architecture. It then describes the quality of service approach adopted, in section III. The prototyping efforts that have been going on are introduced in section JY. Finally, in section V the current status of the CCSDS recommendations is summarized.

Parkes, Steve↗

Privacy-Protected Simultaneous Provision of Energy and Primary Frequency Control Reserve

This paper investigates a Mixed Integer Linear Programming (MILP) model for simultaneous scheduling of energy and primary frequency control reserve. Given the model’s unique structure and growing concerns about privacy, we adopt Dantzig-Wolfe Decomposition (DWD) algorithm to solve the problem in a decentralized fashion while obfuscating the privacy of the energy and reserve resources. Additionally, we present a novel criterion for checking the model’s feasibility. Finally, simulation results are given and discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Supply of reactants for Redox bulk energy storage systems

World resources, reserves, production, and costs of reactant materials, iron, chromium, titanium and bromine for proposed redox cell bulk energy storage systems are reviewed. Supplying required materials for multimegawatt hour systems appears to be feasible even at current production levels. Iron and chromium ores are the most abundant and lowest cost of four reactants. Chromium is not a domestic reserve, but redox system installations would represent a small fraction of U.S. imports. Vast quantities of bromine are available, but present production is low and therefore cost is high. Titanium is currently available at reasonable cost, with ample reserves available for the next fifty years.

Gahn, R. F.↗

Lunar resource evaluation and mine site selection

Two scenarios in this evaluation of lunar mineral resources and the selection of possible mining and processing sites are considered. The first scenario assumes that no new surface or near-surface data will be available before site selection (presumably one of the Apollo sites). The second scenario assumes that additional surface geology data will have been obtained by a lunar orbiter mission, an unmanned sample return mission (or missions), and followup manned missions. Regardless of the scenario, once a potentially favorable mine site has been identified, a minimum amount of fundamental data is needed to assess the resources at that site and to evaluate its suitability for mining and downstream processing. Since much of the required data depends on the target mineral(s), information on the resource, its beneficiation, and the refining, smelting, and fabricating processes must be factored into the evaluation. The annual capacity and producing lifetime of the mine and its associated processing plant must be estimated before the resource reserves can be assessed. The available market for the product largely determines the capacity and lifetime of the mine. The Apollo 17 site is described as a possible mining site. The use of new sites is briefly addressed.

Bence, A. Edward↗

Regular Topologies for Gigabit Wide-Area Networks

In general terms, this project aimed at the analysis and design of techniques for very high-speed networking. The formal objectives of the project were to: (1) Identify switch and network technologies for wide-area networks that interconnect a large number of users and can provide individual data paths at gigabit/s rates; (2) Quantitatively evaluate and compare existing and proposed architectures and protocols, identify their strength and growth potentials, and ascertain the compatibility of competing technologies; and (3) Propose new approaches to existing architectures and protocols, and identify opportunities for research to overcome deficiencies and enhance performance. The project was organized into two parts: 1. The design, analysis, and specification of techniques and protocols for very-high-speed network environments. In this part, SRI has focused on several key high-speed networking areas, including Forward Error Control (FEC) for high-speed networks in which data distortion is the result of packet loss, and the distribution of broadband, real-time traffic in multiple user sessions. 2. Congestion Avoidance Testbed Experiment (CATE). This part of the project was done within the framework of the DARTnet experimental T1 national network. The aim of the work was to advance the state of the art in benchmarking DARTnet's performance and traffic control by developing support tools for network experimentation, by designing benchmarks that allow various algorithms to be meaningfully compared, and by investigating new queueing techniques that better satisfy the needs of best-effort and reserved-resource traffic. This document is the final technical report describing the results obtained by SRI under this project. The report consists of three volumes: Volume 1 contains a technical description of the network techniques developed by SRI in the areas of FEC and multicast of real-time traffic. Volume 2 describes the work performed under CATE. Volume 3 contains the source code of all software developed under CATE.

Shacham, Nachum↗

Zoned namespaces for computing device main memory

Disclosed in some examples are methods, systems, memory devices, memory controllers, and machine-readable mediums which provide for reserving physical memory device resources to specific execution units. Execution units may include processes, threads, virtual machines, functions, procedures, or the like. Physical memory device resources may include channels, modules, ranks, banks, bank groups, and the like. For example, a physical memory device resource that is reservable may be a smallest unit that allows for parallel access with another of the same size unit.

Sheridan, Patrick Michael↗

JIGSAW: Preference-directed, co-operative scheduling

Techniques that enable humans and machines to cooperate in the solution of complex scheduling problems have evolved out of work on the daily allocation and scheduling of Tactical Air Force resources. A generalized, formal model of these applied techniques is being developed. It is called JIGSAW by analogy with the multi-agent, constructive process used when solving jigsaw puzzles. JIGSAW begins from this analogy and extends it by propagating local preferences into global statistics that dynamically influence the value and variable ordering decisions. The statistical projections also apply to abstract resources and time periods--allowing more opportunities to find a successful variable ordering by reserving abstract resources and deferring the choice of a specific resource or time period.

Linden, Theodore A.↗

Lunar Resource Assessment: an Industry Perspective

The goals of the U.S. space program are to return to the Moon, establish a base, and continue onward to Mars. To accomplish this in a relatively short time frame and to avoid the high costs of transporting materials from the Earth, resources on the Moon will need to be mined. Oxygen will be one of the most important resources, to be used as a rocket propellant and for life support. Ilmenite and lunar regolith have both been considered as ores for the production of oxygen. Resource production on the Moon will be a very important part of the U.S. space program. To produce resources we must explore to identify the location of ore or feedback and calculate the surface and underground reserves. Preliminary resource production tests will provide the information that can be used in final plant design. Bechtel Corporation's experience in terrestrial engineering and construction has led to an interest in lunar resource assessment leading to the construction of production facilities on the Moon. There is an intimate link between adequate resource assessment to define feedstock quantity and quality, material processing requirements, and the successful production of lunar oxygen. Although lunar resource assessment is often viewed as a research process, the engineering and production aspects are very important to consider. Resource production often requires the acquisition of different types, scales, or resolutions of data than that needed for research, and it is needed early in the exploration process. An adequate assessment of the grade, areal extent, and depth distribution of the resources is a prerequisite to mining. The need for a satisfactory resource exploration program using remote sensing techniques, field sampling, and chemical and physical analysis is emphasized. These data can be used to define the ore for oxygen production and the mining, processing facilities, and equipment required.

Feldman, S. C.↗

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗

Critical minerals lists for low-carbon transitions: Reviewing their structure, objectives, and limitations

Critical minerals lists have flourished in the past decade, in particular linked to the importance of critical minerals for low-carbon transitions. We identified 27 critical minerals or materials lists across 15 countries and the European Union (EU). These lists are designed to attract public and private attention and investments to secure both domestic and foreign supplies. This review article fills a gap in the existing literature by analyzing the ways in which these lists are defined and utilized by countries engaged in a mineral rush. We focus our attention on three categories of minerals – battery minerals, platinum-group metals (PGMs), and rare earth elements (REEs) that are particularly important to energy transitions. We situate this research in the broader legal and administrative developments that have driven critical minerals policies in the past decade. We provide an in-depth analysis of the commonalities and variations in the raw materials included in these lists, and identify six core limitations of critical minerals lists: (1) unclear links between criticality assessments and mineral prioritization (2) failure to account for the full mineral value-chain; (3) limited strategic alignment between allied nations; (4) limited flexibility in dynamic environments (5) limited consideration for recycling and by-product sourcing; and (6) reliance on incomplete reserve and resource data.

Battery minerals↗

Planning and Operations in Electricity Markets Under System Tansformation: Key Findings

This report summarizes a set of key findings that have been developed through a set of interconnected research activities performed by five institutions between January 2020 and December 2023. The project team, comprising Argonne National Laboratory, the National Renewable Energy Laboratory, Lawrence Berkeley National Laboratory, the Electric Power Research Institute, and Johns Hopkins University, collective engaged with the North American Independent System Operators and Regional Transmission Operators (ISO/RTOs) to identify the key challenges they are facing and opportunities for the project team to provide technical assistance in several prioritized challenge areas.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Strategic Materials For Superalloys

Report discusses status of strategic materials for superalloys in United States. Reviews trends in development of superalloys, defines "strategic" materials, summarizes state of U.S. resources and reserves, and discusses sources and availability of supplies. Reviews results of Conservation of Strategic Aerospace Materials (COSAM) program.

Stephens, Joseph R.↗