Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource reservation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

A Study of Quality of Service Communication for High-Speed Packet-Switching Computer Sub-Networks

In this thesis, we analyze various factors that affect quality of service (QoS) communication in high-speed, packet-switching sub-networks. We hypothesize that sub-network-wide bandwidth reservation and guaranteed CPU processing power at endpoint systems for handling data traffic are indispensable to achieving hard end-to-end quality of service. Different bandwidth reservation strategies, traffic characterization schemes, and scheduling algorithms affect the network resources and CPU usage as well as the extent that QoS can be achieved. In order to analyze those factors, we design and implement a communication layer. Our experimental analysis supports our research hypothesis. The Resource ReSerVation Protocol (RSVP) is designed to realize resource reservation. Our analysis of RSVP shows that using RSVP solely is insufficient to provide hard end-to-end quality of service in a high-speed sub-network. Analysis of the IEEE 802.lp protocol also supports the research hypothesis.

Cui, Zhenqian↗

CCSDS Time-Critical Onboard Networking Service

The Consultative Committee for Space Data Systems (CCSDS) is developing recommendations for communication services onboard spacecraft. Today many different communication buses are used on spacecraft requiring software with the same basic functionality to be rewritten for each type of bus. This impacts on the application software resulting in custom software for almost every new mission. The Spacecraft Onboard Interface Services (SOIS) working group aims to provide a consistent interface to various onboard buses and sub-networks, enabling a common interface to the application software. The eventual goal is reusable software that can be easily ported to new missions and run on a range of onboard buses without substantial modification. The system engineer will then be able to select a bus based on its performance, power, etc and be confident that a particular choice of bus will not place excessive demands on software development. This paper describes the SOIS Intra-Networking Service which is designed to enable data transfer and multiplexing of a variety of internetworking protocols with a range of quality of service support, over underlying heterogeneous data links. The Intra-network service interface provides users with a common Quality of Service interface when transporting data across a variety of underlying data links. Supported Quality of Service (QoS) elements include: Priority, Resource Reservation and Retry/Redundancy. These three QoS elements combine and map into four TCONS services for onboard data communications: Best Effort, Assured, Reserved, and Guaranteed. Data to be transported is passed to the Intra-network service with a requested QoS. The requested QoS includes the type of service, priority and where appropriate, a channel identifier. The data is de-multiplexed, prioritized, and the required resources for transport are allocated. The data is then passed to the appropriate data link for transfer across the bus. The SOIS supported data links may inherently provide the quality of service support requested by the intra-network layer. In the case where the data link does not have the required level of support, the missing functionality is added by SOIS. As a result of this architecture, re-usable software applications can be designed and used across missions thereby promoting common mission operations. In addition, the protocol multiplexing function enables the blending of multiple onboard networks. This paper starts by giving an overview of the SOIS architecture in section 11, illustrating where the TCONS services fit into the overall architecture. It then describes the quality of service approach adopted, in section III. The prototyping efforts that have been going on are introduced in section JY. Finally, in section V the current status of the CCSDS recommendations is summarized.

Parkes, Steve↗

Supply of reactants for Redox bulk energy storage systems

World resources, reserves, production, and costs of reactant materials, iron, chromium, titanium and bromine for proposed redox cell bulk energy storage systems are reviewed. Supplying required materials for multimegawatt hour systems appears to be feasible even at current production levels. Iron and chromium ores are the most abundant and lowest cost of four reactants. Chromium is not a domestic reserve, but redox system installations would represent a small fraction of U.S. imports. Vast quantities of bromine are available, but present production is low and therefore cost is high. Titanium is currently available at reasonable cost, with ample reserves available for the next fifty years.

Gahn, R. F.↗

Lunar resource evaluation and mine site selection

Two scenarios in this evaluation of lunar mineral resources and the selection of possible mining and processing sites are considered. The first scenario assumes that no new surface or near-surface data will be available before site selection (presumably one of the Apollo sites). The second scenario assumes that additional surface geology data will have been obtained by a lunar orbiter mission, an unmanned sample return mission (or missions), and followup manned missions. Regardless of the scenario, once a potentially favorable mine site has been identified, a minimum amount of fundamental data is needed to assess the resources at that site and to evaluate its suitability for mining and downstream processing. Since much of the required data depends on the target mineral(s), information on the resource, its beneficiation, and the refining, smelting, and fabricating processes must be factored into the evaluation. The annual capacity and producing lifetime of the mine and its associated processing plant must be estimated before the resource reserves can be assessed. The available market for the product largely determines the capacity and lifetime of the mine. The Apollo 17 site is described as a possible mining site. The use of new sites is briefly addressed.

Bence, A. Edward↗

Regular Topologies for Gigabit Wide-Area Networks

In general terms, this project aimed at the analysis and design of techniques for very high-speed networking. The formal objectives of the project were to: (1) Identify switch and network technologies for wide-area networks that interconnect a large number of users and can provide individual data paths at gigabit/s rates; (2) Quantitatively evaluate and compare existing and proposed architectures and protocols, identify their strength and growth potentials, and ascertain the compatibility of competing technologies; and (3) Propose new approaches to existing architectures and protocols, and identify opportunities for research to overcome deficiencies and enhance performance. The project was organized into two parts: 1. The design, analysis, and specification of techniques and protocols for very-high-speed network environments. In this part, SRI has focused on several key high-speed networking areas, including Forward Error Control (FEC) for high-speed networks in which data distortion is the result of packet loss, and the distribution of broadband, real-time traffic in multiple user sessions. 2. Congestion Avoidance Testbed Experiment (CATE). This part of the project was done within the framework of the DARTnet experimental T1 national network. The aim of the work was to advance the state of the art in benchmarking DARTnet's performance and traffic control by developing support tools for network experimentation, by designing benchmarks that allow various algorithms to be meaningfully compared, and by investigating new queueing techniques that better satisfy the needs of best-effort and reserved-resource traffic. This document is the final technical report describing the results obtained by SRI under this project. The report consists of three volumes: Volume 1 contains a technical description of the network techniques developed by SRI in the areas of FEC and multicast of real-time traffic. Volume 2 describes the work performed under CATE. Volume 3 contains the source code of all software developed under CATE.

Shacham, Nachum↗

JIGSAW: Preference-directed, co-operative scheduling

Techniques that enable humans and machines to cooperate in the solution of complex scheduling problems have evolved out of work on the daily allocation and scheduling of Tactical Air Force resources. A generalized, formal model of these applied techniques is being developed. It is called JIGSAW by analogy with the multi-agent, constructive process used when solving jigsaw puzzles. JIGSAW begins from this analogy and extends it by propagating local preferences into global statistics that dynamically influence the value and variable ordering decisions. The statistical projections also apply to abstract resources and time periods--allowing more opportunities to find a successful variable ordering by reserving abstract resources and deferring the choice of a specific resource or time period.

Linden, Theodore A.↗

Lunar Resource Assessment: an Industry Perspective

The goals of the U.S. space program are to return to the Moon, establish a base, and continue onward to Mars. To accomplish this in a relatively short time frame and to avoid the high costs of transporting materials from the Earth, resources on the Moon will need to be mined. Oxygen will be one of the most important resources, to be used as a rocket propellant and for life support. Ilmenite and lunar regolith have both been considered as ores for the production of oxygen. Resource production on the Moon will be a very important part of the U.S. space program. To produce resources we must explore to identify the location of ore or feedback and calculate the surface and underground reserves. Preliminary resource production tests will provide the information that can be used in final plant design. Bechtel Corporation's experience in terrestrial engineering and construction has led to an interest in lunar resource assessment leading to the construction of production facilities on the Moon. There is an intimate link between adequate resource assessment to define feedstock quantity and quality, material processing requirements, and the successful production of lunar oxygen. Although lunar resource assessment is often viewed as a research process, the engineering and production aspects are very important to consider. Resource production often requires the acquisition of different types, scales, or resolutions of data than that needed for research, and it is needed early in the exploration process. An adequate assessment of the grade, areal extent, and depth distribution of the resources is a prerequisite to mining. The need for a satisfactory resource exploration program using remote sensing techniques, field sampling, and chemical and physical analysis is emphasized. These data can be used to define the ore for oxygen production and the mining, processing facilities, and equipment required.

Feldman, S. C.↗

Strategic Materials For Superalloys

Report discusses status of strategic materials for superalloys in United States. Reviews trends in development of superalloys, defines "strategic" materials, summarizes state of U.S. resources and reserves, and discusses sources and availability of supplies. Reviews results of Conservation of Strategic Aerospace Materials (COSAM) program.

Stephens, Joseph R.↗

Big Cypress Water Resources: Using Earth Observations to Assess Water Quality in Big Cypress Reservation, FL

Upstream agricultural development and runoff are driving harmful algal blooms in the Big Cypress Reservation. The Seminole Tribe of Florida Environmental Resource Management Department monitors water quality in the Big Cypress Reservation, located on the north end of Big Cypress National Preserve. The Environmental Resource Management Department aims to incorporate Earth observations into its investigative approach, which consists of Geographic Information Systems and in situ water sampling. We assessed the feasibility of using Earth observations to measure harmful algal blooms over time and identify vulnerable areas. We analyzed data from multiple remote sensing platforms and sensors, including Landsat 8 Thermal Infrared Spectrometer(TIRS), Landsat 9 TIRS-2, Landsat 9 Operational Land Imager 2, Sentinel-2 MultiSpectral Instrument, and Sentinel-3 Ocean and Land Color Instrument. We determined that it was challenging to use Sentinel-3, Landsat 8, and Landsat 9 imagery for monitoring the canals within the Reservation, and that Sentinel-2 was the most capable platform for the study area. Using Sentinel-2, we created spectral indices for the detection of algal blooms. We used these indices to measure algal blooms at 8 stations across the Big Cypress Reservation. We then created time series and seasonal decompositions of in situ water sample data and indices to visualize relationships between datasets, along with correlation matrices. Our correlations were not conclusive. However, we found that the spectral indices have the potential to detect algal blooms. Lastly, we evaluated Maxar WorldView-3 imagery and found that using data from sensors with higher spatial resolutions would improve results.

Remote sensing↗

Protecting rain forests and forager's rights using LANDSAT imagery

Creating rain forest reserves is vital given the global decline in biodiversity. Yet, the plants and animals that will be protected from untrammeled commercial exploitation within such reserves constitute essential resources for indigenous foragers and farmers. Balancing the needs of local subsistence level populations with the goals of national and international conservation agencies requires a thorough understanding of the mutual impacts that arise from the interaction of park and people. In the Ituri forest of Zaire, LANDSAT TM image analysis and GPS ground truth data were used to locate human settlements so that boundaries of the proposed Okapi Reserve could be chosen to minimize its impact on the subsistence practices of the local foragers and farmers. Using satellite imagery in conjunction with cultural information should help to ensure traditional resource exploitation rights of indigenous peoples whilst simultaneously protecting the largest contiguous area of undisturbed forest.

Wilkie, David S.↗

Resource representation in COMPASS

A set of viewgraphs on resource representation in COMPASS is given. COMPASS is an incremental, interactive, non-chronological scheduler written in Ada with an X-windows user interface. Beginning with an empty schedule, activities are added to the schedule one at a time, taking into consideration the placement of the activities already on the timeline and the resources that have been reserved for them. The order that the activities are added to the timeline and their location on the timeline are controlled by selection and placement commands invoked by the user. The order that activities are added to the timeline and their location are independent. The COMPASS code library is a cost effective platform for the development of new scheduling applications. It can be effectively used off the shelf for compatible scheduling applications or it can be used as a parts library for the development of custom scheduling systems.

Fox, Barry R.↗

Scheduling with Automatic Resolution of Conflicts

DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

Clement, Bradley↗

New Topographic Products for the Lunar South Pole from the Lunar Orbiter Laser Altimeter (LOLA)

Due to the Moon’s low obliquity and highly cratered topography, its polar environments host regions of extreme illumination conditions. Multiple lines of evidence indicate the presence of geologically stable ice and other volatiles on or below the surface within polar permanently shadowed regions (PSRs). These regions are valuable targets for science and exploration as they hold clues to the history of water in the inner solar system and may hold sufficient reserves for in-situ resource utilization. Standing high above the PSRs, peaks of long-duration sunlight are oases where landed assets can easily generate power and communicate. For these reasons, the lunar south pole is the target of many upcoming missions including NASA’s Artemis program. The Lunar Orbiter Laser Altimeter (LOLA) onboard the Lunar Reconnaissance Orbiter (LRO) provides the global geodetic framework with which past, present, and future missions can accurately geolocate their data. Laser altimeters like LOLA are unaffected by shadows and, therefore, provide the most direct measurements of topography within PSRs. Here we present the latest work to improve LOLA’s polar topographic maps and resulting derived products, such as PSR maps, which are crucial tools for science and exploration of the polar regions

Michael K Barker↗

Jobos Bay Water Resources II: Using Earth Observations to Analyze Shoreline Changes and Understand the Effects of Sea Level Rise in Southern Puerto Rico

High intensity storms and coastal development negatively impact the ecosystems of Jobos Bay, Puerto Rico, by causing reductions in mangrove forests and degradation of water quality. These changes can compromise the ecosystem services, economic value, and cultural significance provided to the community by Jobos Bay. In collaboration with the Jobos Bay National Estuarine Research Reserve (JBNERR), the Jobos Bay Water Resources II team used Earth observations to investigate water quality, watersheds land use land cover (LULC) changes, and the impact of Hurricanes Maria and Irma on mangrove forest area. This information will improve JBNERR’s understanding of the impacts of development and weather events on Jobos Bay, and will inform future shoreline management decisions that ensure continued quality of the ecosystem. Mangrove extent was examined using imagery from Landsat 8 Operational Land Imager (OLI), WorldView 2 WV110, and WorldView 3 WV110. Imagery from Sentinel-2 MultiSpectral Instrument (MSI) was used to map watersheds LULC. Landsat 8 OLI and Sentinel-2 MSI data were analyzed with in situ data collected at the time of satellite overpass to investigate water quality in Jobos Bay. Reduction from 2017 mangrove extent was observed in 2018 following the hurricane events, and area of mapped extent was greater than 2018 in 2021. Water quality derived from satellite data was compared to in situ water quality measurements to inform future methodology decisions.

Lily Oliver↗

Renewable Energy Contingencies in Power Systems: Concept and Case Study

This paper introduces the concept of renewable energy contingencies that represent long-term/extended variability of variable renewable energy (VRE) resources, namely, significant periods (e.g., days/weeks) of low wind/solar availability. These contingencies have not received much attention to date but are likely to emerge as a major issue in some countries such as India as the share of VRE increases. Using 38 years of climate model reanalysis data for wind over India, we demonstrate that low periods of wind contingency below long-term (Indian) national average of 5 m/s can extend for more than 100 days in several zones some of which are deploying large wind farms. Even in some of the best wind resource areas in India with long term average wind speed close to 7 m/s, low wind days (e.g., 5 m/s which is substantially below average) can extend up to 60 days. We propose a four-step methodology around a co-optimization based energy-ancillary services dispatch model to assess the impact of renewable contingency and implemented it for the state of Tamil Nadu, the most wind-rich state of India. We have estimated that annual renewable contingency cost impact of 5 GW additional wind in Tamil Nadu to be in the range of US$27-76 million pa. Planning analysis should embrace the concept of renewable contingency to recognize these costs and put in place necessary spinning reserve and back-up generation resources.

Mohar Chattopadhyay↗

Performance-based workload assessment: Allocation strategy and added task sensitivity

The preliminary results of a research program investigating the use of added tasks to evaluate mental workload are reviewed. The focus of the first studies was a reappraisal of the traditional secondary task logic that encouraged the use of low-priority instructions for the added task. It was believed that such low-priority tasks would encourage subjects to split their available resources among the two tasks. The primary task would be assigned all the resources it needed, and any remaining reserve capacity would be assigned to the secondary task. If the model were correct, this approach was expected to combine sensitivity to primary task difficulty with unintrusiveness to primary task performance. The first studies of the current project demonstrated that a high-priority added task, although intrusive, could be more sensitive than the traditional low-priority secondary task. These results suggested that a more appropriate model of the attentional effects associated with added task performance might be based on capacity switching, rather than the traditional optimal allocation model.

Vidulich, Michael A.↗

Capacity and Throughput of Urban Air Mobility Vertiports with a First-Come, First-Served Vertiport Scheduling Algorithm

In this paper, a first-come, first-served vertiport scheduling algorithm for Urban Air Mobility (UAM) was exercised to assess and compare the capacity and throughput of various vertiport configurations. The scheduler models each vertiport by the number of vertipads and parking spaces, and manages reservations on timelines for those vertiport resources, at a level of fidelity suitable for fast-time and system-level analyses of UAM concepts and other airspace studies. The paper defines the theoretical model that can be used to estimate the capacity of various vertiport configurations. The theoretical model provides an understanding of the conditions that can lead to either a parking space-limited or a vertipad-limited vertiport. Examples of potential throughput for some vertiport configurations are provided using both a queueing approach as well as a simulated UAM demand scenario. The study demonstrated that a first-come, first-served scheduling approach can have inefficiencies in the use of the vertiport resources. The inefficiencies can increase as the number of resources increases. Nonetheless, 80% or better peak throughput to capacity ratio was observed for most vertiport configurations.

UAM↗