Search NASA⌕ Search

SEARCH · Search NASA

Results for “rig management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Utah FORGE: Daily Reports for the 2024 Stimulation of Wells 16A/16B(78)-32

The zip file below contains daily reports produced during the spring 2024 stimulation of wells 16A/16B(78)-32 at Utah FORGE . These reports cover a period from March 29th to April 28th, 2024. They discuss the activity on the rig each day, with each report containing information on general operations, management, safety, and weather.

15 GEOTHERMAL ENERGY↗

Optimizing Geothermal Drilling: Oil and Gas Technology Transfer

There is a significant amount of financial risk associated with geothermal drilling. This study of drilling operations seeks opportunities to improve upon current practices and technologies. The scope of this study included analyzing 21 geothermal wells and 21 oil and gas wells. The goal was to determine a 'Perfect Well' using historical data to compare the best oil and gas well to the best geothermal well. Unfortunately, limitations encountered in the study included missing data (bit records, mud information, etc.) and poor data collection practices An online software database was used to format drilling data to IADC coded daily drilling reports and generate figures for analysis. Six major issues have been found in geothermal drilling operations. These problems include lost circulation, rig/ equipment selection, cementing, penetration rate, drilling program, and time management. As a result of these issues, geothermal drilling averaged 56.4 days longer than drilling comparable oil and gas wells in the wells in this study. Roughly $13.9 million was spent on non-productive time in the 21 geothermal wells, compared with only $1.3 million in the oil and gas wells, assuming a cost of $50,000 per day. Comparable events such as drilling the same sized hole, tripping in/out, cementing, and running the same size casing took substantially less time in the oil and gas wells. Geothermal wells were drilled using older and/or less advanced technology to depths less than 10,000 feet, while oil and gas wells reached 12,500 feet faster with purpose built rigs. A new approach is now underway that will optimize drilling programs throughout the drilling industry using Mechanical Specific Energy (MSE) as a tool to realize efficient drilling processes. Potential improvements for current geothermal operations are: the use of electronic records, real time services, and official glossary terms to describe rig operations, and advanced drilling rigs/technology.

15 GEOTHERMAL ENERGY↗

Marine Energy Technology Development Risk Management Framework

Over the past decades, the global marine energy industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed a Marine Energy Risk Management Framework in 2015, with this revision published in 2024. This risk management framework shall be utilized on all DOE Water Power Technologies Office (WPTO) projects that require system testing in the open water. By addressing uncertainties, the Marine Energy Risk Management Framework increases the likelihood of successful development of marine energy converter technology. It covers projects of any technology readiness level technology performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over the development cycle. This risk framework is not a substitute for other risk management procedures that may be required for marine operations, such as installations at sea, hoisting and rigging, safe diver operations, and other safety requirements. This risk framework is intended to meet DOE's risk management expectations for marine energy technology research and development efforts from WPTO. It also provides an overview of other relevant risk management tools and documentation.

16 TIDAL AND WAVE POWER↗

Field Testing of Environmentally Friendly Drilling System

The Environmentally Friendly Drilling (EFD) program addresses new low-impact technology that reduces the footprint of drilling activities, integrates light weight drilling rigs with reduced emission engine packages, addresses on-site waste management, optimizes the systems to fit the needs of a specific development sites and provides stewardship of the environment. In addition, the program includes industry, the public, environmental organizations, and elected officials in a collaboration that addresses concerns on development of unconventional natural gas resources in environmentally sensitive areas. The EFD program provides the fundamentals to result in greater access, reasonable regulatory controls, lower development cost and reduction of the environmental footprint associated with operations for unconventional natural gas. Industry Sponsors have supported the program with significant financial and technical support. This final report compendium is organized into segments corresponding directly with the DOE approved scope of work for the term 2005-2009 (10 Sections). Each specific project is defined by (a) its goals, (b) its deliverable, and (c) its future direction. A web site has been established that contains all of these detailed engineering reports produced with their efforts. The goals of the project are to (1) identify critical enabling technologies for a prototype low-impact drilling system, (2) test the prototype systems in field laboratories, and (3) demonstrate the advanced technology to show how these practices would benefit the environment.

03 NATURAL GAS↗

Effects of Exhaust Gas Recirculation (EGR) on Turbulent Combustion and Emissions in Advanced Gas Turbine Combustors with High-Hydrogen-Content (HHC) Fuels (Final Report)

This Final Report documents the entire four years of the Cooperative Agreement DE-FE0011822, from October 1, 2013 through September 30, 2017, that was competitively awarded under Funding Opportunity Announcement DE-FOA-0000795 in support of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) University Turbine Systems Research (UTSR) Program. Under the UTSR Program, DOE typically issues Funding Opportunity Announcement (FOA) solicitations every 1-2 years so that U.S. colleges/universities may propose research & development (R&D) projects in specific technical topic areas (e.g., combustion, aerodynamics/heat transfer, advanced materials) that have been identified as both scientifically and industrially relevant to the gas turbine industry. The primary objectives of this Purdue University project (in collaboration with Princeton University through a sub-award) was to develop experimental methods, kinetic models, and numerical tools to help quantify and predict the impact of exhaust gas recirculation (EGR) on NOx and CO emissions, combustion kinetics, radiation heat transfer, turbulent combustion, and combustion instabilities for natural gas and high hydrogen content (HHC) fuels by using laminar and turbulent flow reactors and gas turbine combustors operating at high temperatures and pressures. This project has obtained detailed data for improving chemical kinetic models to study EGR effects and provide insight into the effects of EGR on flame speeds and turbulent flame structure, as well as assessing the impact of EGR on emissions in a high-pressure combustion test rig. The project was divided into six primary tasks: 1) Project Management and Program Planning; 2) Flow Reactor Investigation of EGR Chemical Kinetics; 3) Combustion Bomb Investigation of EGR Effects on Flame Speed; 4) Investigation of EGR Effects on Turbulent Flame Structure in Reactor-Assisted Turbulent Slot (RATS) Burner; 5) Investigation of EGR Effects in Purdue Staged Combustion Test Rig; and 6) Development and Validation of a Large Eddy Simulation (LES) Tool for Gas Turbine Combustion and Emission Modeling using HHC Fuels. Details on the execution and results of each of these tasks are provided in the main report. To assist the reader, each task is described in a chapter-like format with its own separate listing of tables, figures, and references so that the results of each task/subtask (i.e., technical sections covering various experiments and modeling work focused on a specific area) can be quickly obtained while also getting an overall feel of the project execution. This chapter-like format also allows for acknowledgement of support from other programs relative to specific tasks. In this manner, the reader can more conveniently digest the R&D results in the various task/subtask sections that may be of most interest to the reader. In addition to this Final Report, the Purdue/Princeton team was able to publish 7 journal articles and provide 7 presentations at national scientific meetings/conferences to disseminate results. A listing of these journal articles and presentations is provided at the end of this report

03 NATURAL GAS↗

Steam Dryer Segmentation and Packaging at Grand Gulf Nuclear Station - 13577

Entergy recently performed an Extended Power Up-rate (EPU) on their Grand Gulf Nuclear Station, near Port Gibson, Mississippi. To support the EPU, a new Steam Dryer Assembly was installed during the last refueling outage. Due to limited access into the containment, the large Replacement Steam Dryer (RSD) had to be brought into the containment in pieces and then final assembly was completed on the refueling floor before installation into the reactor. Likewise, the highly contaminated Original Steam Dryer (OSD) had to be segmented into manageable sections, loaded into specially designed shielded containers, and rigged out of containment where they will be safely stored until final disposal is accomplished at an acceptable waste repository. Westinghouse Nuclear Services was contracted by Entergy to segment, package and remove the OSD from containment. This work was performed on critical path during the most recent refueling outage. The segmentation was performed underwater to minimize radiation exposure to the workers. Special hydraulic saws were developed for the cutting operations based on Westinghouse designs previously used in Sweden to segment ABB Reactor Internals. The mechanical cutting method was selected because of its proven reliability and the minimal cutting debris that is generated by the process. Maintaining stability of the large OSD sections during cutting was accomplished using a custom built support stand that was installed into the Moisture Separator Pool after the Moisture Separator was installed back in the reactor vessel. The OSD was then moved from the Steam Dryer Pool to the Moisture Separator Pool for segmentation. This scenario resolved the logistical challenge of having two steam dryers and a moisture separator in containment simultaneously. A water filtration/vacuum unit was supplied to maintain water clarity during the cutting and handling operations and to collect the cutting chips. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Microwave Technology for TENORM Waste Treatment - 17377

The sludge and scales generated by the oil and gas industry usually contain radionuclides of the thorium and uranium decay chains, the so-called technologically enhanced, naturally occurring radioactive materials (TENORM) waste. The handling of this waste must consider both the radiation risks presented by those radionuclides and its chemical toxicity, due to the decomposition of oil residues, which may generate hydrogen sulfide and other hazardous compounds. In the case of Brazil, Public Law 10.308 limits the management options for radioactive waste generated by offshore oil production rigs to drumming and storage; it prohibits disposal of any radioactive waste in sea-waters, seabed or oceanic islands. This paper describes the results of the work to develop a treatment process using a specially designed microwave oven, which removes simultaneously water and hydrocarbons from the sludge, thus reducing the volume, the chemical toxicity and the chemical reactivity of the waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Collection of Radioactive Waste at Chalk River Laboratories - 19425

Remote handling of radioactive waste may be required during a variety of decommissioning and waste management activities. Based on the level of radiation and complexity of the application, the design, development and implementation of novel electromechanical systems can offer optimal solutions. At Canadian Nuclear Laboratories, current decommissioning and waste management projects routinely employ solutions including innovative and unique tools, test rigs, mock-ups, robotics, unmanned aerial vehicles, and automated systems. CNL ability to integrate an experienced team from a wide range of technical areas make such solutions possible. In this paper, we present an example of remotely controlled systems to collect highly radioactive waste materials from storage tanks at the Chalk River Laboratories. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RLUOB Toppled Load: Near Miss to Personnel Injury (Incident Investigation Final Report)

On Monday, February 25, 2019, at approximately 1430, the Logistics Central Shop (LOG-CS) Hoisting and Rigging (H&R) crew moved an anti-vibration table on the first floor of Technical Area 55 (TA-55), Building 400, Radiological Laboratory/Utilities/Office Building (RLUOB). The table was designed to be anchored to the facility floor on pedestals to provide vibration dampening for an electron microscope (SEM/TEM). The table was approximately 86 inches wide by 56 inches tall, an asymmetrical load. It weighed approximately 2,300 pounds. The crew was transporting the load using a lifting device, specifically a Vere Optical Table Hoist. The work control package (Integrated Work Document [IWD] and H&R Ordinary Lift Plan) included staging the table, moving the load from the loading dock through corridors into a laboratory, and installing the table. During the table move, the riggers made adjustments to the lifting device to enable the load and device to pass through security double doors. After the crew successfully passed through the security double doors, three riggers moved the load approximately ten linear feet further at which point the lifting device and load fell to the RLUOB facility floor. No injuries were sustained as a result of the toppled load and frame. The rigging crew immediately notified supervision who then notified the TA-55 Facility Operations Director (FOD). After further review, the TA-55 FOD categorized the event as a near miss to personnel injury. The scene was preserved and all H&R operations within the TA-55 directorate were paused pending a review of all lift plans with the rigging supervisor and the Chemistry and Metallurgy Research Replacement (CMRR) Construction Manager. All lift plans were to be reviewed prior to resumption of H&R lifts within the directorate. Additionally, all newly generated lift plans will be reviewed by the TA-55 FOD, the H&R supervisor and the affected manager. The Associate Laboratory Director for Weapons Production (ALDWP) appointed a team to investigate the event, identify all relevant facts, and determine the direct, contributing, and root causes. The team was also charged with reviewing other similar events to identify common causes for multiple recurring events and the organizational and management weaknesses that have led to failure to correct recurring events. (See Appendix A: Memo, Appointment of Accident Investigation Board.)

99 GENERAL AND MISCELLANEOUS↗

Air quality impacts from the development of unconventional oil and gas well pads: Air toxics and other volatile organic compounds

Unconventional oil and natural gas development (UOGD) has expanded rapidly across the United States in recent decades and raised concerns about associated air quality impacts. While significant effort has been made to quantify methane emissions, relatively few observations have been made of Volatile Organic Compounds (VOCs), especially during drilling and completion of new wells. Extensive air monitoring during development of several large, multi-well pads in Broomfield, Colorado, in the Denver-Julesburg Basin, provides a novel opportunity to examine changes in local air toxics and other VOC concentrations during well drilling and completions and production. These operations offer an especially useful case to study as several management practices were implemented to reduce emissions (e.g., electrified, grid-powered drill rigs and closed loop fluid handling systems to reduce truck traffic and limit fluid handling on the pad). With simultaneous measurements of methane and 50 VOCs from October 2018 to December 2022 at as many as 19 sites near well pads, in adjacent neighborhoods, and at a more distant reference location, we identify impacts from each phase of well development and production. Use of weekly, time-integrated canisters, a Proton Transfer Reaction Mass Spectrometer (PTR-MS), continuous photoionization detectors (PID) to trigger canister collection upon detection of VOC-rich plumes, and an instrumented vehicle, provided a powerful suite of measurements to characterize both transient plumes and longer-term changes in air quality. Prior to the start of well development, VOC gradients were small across Broomfield. Once drilling commenced, concentrations of oil and gas (O&G) related VOCs, including alkanes and aromatics, increased around active well pads. Concentration increases were clearly apparent during certain operations, including drilling, coil tubing/millout operations, and production tubing installation. Emissions of C 8 –C 10 n-alkanes during drilling operations highlighted the importance of VOC emissions from synthetic drilling mud chosen to reduce odor impacts. More than 90 samples were collected of transient plumes. Using composition measurements, meteorological data, and information about well pad activities, these plumes were connected with specific UOGD operations including drilling, flowback, and production equipment maintenance. The chemical signatures of these plumes differed by operation type (e.g., C 8 –C 10 n-alkanes constituted a larger fraction of measured VOCs in drilling-related plumes). Concentrations of individual, oil and gas-related VOCs in these plumes were often several orders of magnitude higher than in background air, with maximum ethane and benzene concentrations of 79,600 and 819 ppbv, respectively. Because these plumes typically impact a monitoring site for just several minutes, they are easily missed by slower-responding instruments. Study measurements highlight future emission mitigation opportunities during UOGD operations, including better control of emissions from shakers that separate drill cuttings from drilling mud, production separator maintenance operations, and periodic emptying of sand cans during flowback operations.

54 ENVIRONMENTAL SCIENCES↗

Installation and operation of GeoMelt{sup R} in container vitrification in NNL Central Lab active rig hall at Sellafield - 15328

Cleanup and subsequent immobilization of wastes on the UK's NDA estate brings major challenges. With the exception of HLW where vitrification is utilized for immobilization, cement is typically used in the management and immobilization of non-heat generating wastes. However some legacy feeds such as those containing reactive metals can be incompatible with cementation technologies, and the application of engineered cement encapsulating product to raw wastes increases wasteform volume. Cementation has also been developed to be compatible with the repository concept, which provides it with a level of protection from the environment. Potential delays in repository implementation and as yet to be determined repository waste form acceptance criteria for some wastes may require the duration of above ground storage of immobilized wastes to be extended with potential effect on the integrity of the wasteform. Vitrification is a treatment option which destroys organics and hazardous inorganics such as asbestos, reduces wasteform volume, and produces a robust leach resistant wasteform. Kurion's GeoMelt{sup R} In-container Vitrification (ICV){sup TM} is a vitrification process wherein the treatment vessel can serve as an interim-storage, transport, and final long-term storage vessel - thus negating the need to pour glass into a separate container, effectively leading to a much simpler system than traditional waste melters. The inherent volume reduction from vitrification results in a dense product with self-shielding properties, and the GeoMelt treatment process has been demonstrated to homogenize elemental metals and radionuclide contaminants of concern, eliminating hot spots and mitigating criticality concerns. All of which opens up alternatives strategies for storage and disposal. GeoMelt has been proven in the commercial and US DOE waste treatment environment with over 26,000 tonnes of hazardous waste treated to date (half of this radioactive). Kurion and the UK's National Nuclear Laboratory (NNL) plan to demonstrate its application to Sellafield radioactive wastes. A small (engineering) scale demonstrator is being installed in the active rig hall at NNL's Central Laboratory at Sellafield UK with a twofold mission; 1) demonstration of the vitrification of ILW/LLW, and 2) processing of smaller volume orphan wastes that currently have no treatment path. The NNL facility will allow the handling of uranium containing materials which form a substantial component of ILW currently stored on the Sellafield site. Accurate DFs across the melter and off gas system are often difficult to obtain using inactive materials at the low concentrations present in radioactive wastes. Installation in the NNL facility will allow trace quantities of active species such as Cs-137 and Tc-99 to be processed as part of a simulant ILW stream and monitoring will allow accurate decontamination factors (DFs) to be established to support future vitrification facility design. In addition to underpinning melter operation and obtaining DFs across the system, the facility will allow the processing of radioactive waste arisings of low activity which may either be typical of larger waste volumes or may present as orphans without a disposition route. In either case the melter facility will be able to vitrify these wastes into a form that will be suitable for interim storage and disposal. Among the feeds envisaged for processing will be asbestos from power stations, contaminated soils, feeds containing uranium metals, ponds solids, sludge, and miscellaneous active laboratory wastes. The NNL Central Lab capability will be used to analyze the active product to support disposal requirements whether through letters of compliance for the Geological Disposal Facility (GDF) or waste acceptance criteria for the Low Level Waste Repository (LLWR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Generator Technology

New generator technology project is driven by the need to be able to remotely deploy generator technology where it is needed, when it is needed. Both the military and aid programs that provide assistance after disasters could use the ability to deploy energy generation that fits the needs of the situation. Currently, pre-specified generators are deployed, sometime more than half way around the world to provide electricity. Through our Phase-I to Phase III DARPA grant, we will provide a mechanism where a 3d print station and raw materials could be shipped to a deployment site and remotely deployed personnel. These remote personnel can collaborate with engineers at a home location where 3d print plans can be optimized for the remote purpose. The plans can then be sent electronically to the remote location for printing, much like NASA sent the plans for a socket wrench to the International Space Station for printing in . If multiple generators need to be deployed at different remote locations, within miles of each other the printer rig can be moved to print the generators where they are needed. 3d printing is growing in the field of manufacturing. 3d printing has matured to the point where many types of materials are now available for many types of manufacturing. Both magnetic and electrically conductive material materials have recently been developed which can now lead to 3d printing of engines and generators. Our project will provide a successful printer rig that can be remotely deployed, to print a generator design in the field as well as provide a process for deploying the printed generator as well. This Systems Engineering Management Plan(SEMP) will provide the planning required for a Phase I DARPA grant that may also include goals for Phase II and Phase II grants. The SEMP provides a proposed project schedule, references, system engineering processes, specialty engineering system deployment and product support sections. Each section will state how our company will provide the necessary services to make this project succeed.

3D printing, manufacturing, generator technology, ↗

Annual Report: Turbines

The FY12 NETL-RUA Turbine Thermal Management effort supported the Department of Energy (DOE) Hydrogen Turbine Program through conduct of novel, fundamental, basic, and applied research in the areas of aerothermal heat transfer, coatings development, and secondary flow control. This research project utilized the extensive expertise and facilities readily available at NETL and the participating universities. The research approach includes explorative studies based on scaled models and prototype coupon tests conducted under realistic high-temperature, pressurized, turbine operating conditions. This research is expected to render measurable outcomes that will meet DOE advanced turbine development goals of a 3- to 5-point increase in power island efficiency and a 30 percent power increase above the hydrogen-fired combined cycle baseline. In addition, knowledge gained from this project will further advance the aerothermal cooling and TBC technologies in the general turbine community. This project has been structured to address Development and design of aerothermal and materials concepts in FY12-13. Design and manufacturing of these advanced concepts in FY13. Bench-scale/proof-of-concept testing of these concepts in FY13-14 and beyond. The Turbine Thermal Management project consists of four tasks that focus on a critical technology development in the areas of aerothermal and heat transfer, coatings and materials development, design integration and testing, and a secondary flow rotating rig.

20 FOSSIL-FUELED POWER PLANTS↗

Systematic Analysis of Drivers and Barriers of Cross-Sectorial Learning Between Nuclear and Oil and Gas Decommissioning Projects - 20139

Project and megaproject management in the energy sector have historically focused on the planning and delivery of the construction of infrastructure. Therefore, policies are predominantly oriented to support the construction of infrastructure rather than its decommissioning. However, globally, several facilities have reached (or will soon reach) their end-of-life and need to be decommissioned. These facilities span across the energy sector, including nuclear power plants and oil and gas rigs, whose decommissioning present unprecedented techno-socio-economic challenges. Moreover, globally, their decommissioning cost is estimated to reach hundreds of billions of US dollars and this budget keeps increasing, with limited knowledge-transfer across industries to mitigate the spiraling increase of this figure. Cross-sectorial knowledge-transfer is a way to tackle this matter and improve the planning and delivery of decommissioning and waste management projects. The aim of this research is to build a road-map based on cross-sectorial industrial experience, designed to promote the sharing of good practices between projects both within and across industries dealing with major decommissioning and waste management challenges. To reach this aim, the tacit knowledge of senior practitioners on several large scale nuclear and oil and gas decommissioning projects is made explicit by the means of semi-structured interviews, systematically analyzed through directed content analysis. The results of this analysis include a list of good practices that could and should be transferred to nuclear decommissioning projects, including the need to promote the adoption of incentives explicitly linked to the project deliverables, and to develop long-term plans to support smooth transition from operations to decommissioning. Suggestions about how the knowledge-transfer can be promoted within and across organizations are also discussed. In this way, this research provides practical guidance for project managers and policymakers on how to support the planning and delivery of projects with improved performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Floodplain Assessment for the Middle Los Alamos Canyon Aggregate Area Investigations in Technical Area 02 at Los Alamos National Laboratory

The proposed action being assessed in this document occurs in TA-02 in the bottom of Los Alamos Canyon. The DOE proposes to conduct soil sampling at AOC 02-011 (d), AOC 02- 011(a)(ii), and SWMU 02-005, and excavate soils in AOC 02-011(a)(ii) as part of a corrective actions effort. Additional shallow surface soil samples (soil grab samples) will be collected throughout the TA-02 area, including within the floodplain, to perform ecotoxicology studies (Figures 1 and 2). The excavation boundaries in AOC 02-011(a)(ii) are slightly within the delineated 100-year floodplain. The project will use a variety of techniques for soil sampling and remediation efforts to include hand/digging, standard hand auger/sampling, excavation using machinery such as backhoe and front end loader and small drill rig. Heavy equipment will traverse the floodplain and spoils piles will be staged in the floodplain within developed or previously disturbed areas (e.g., existing paved roads and parking areas). The project will utilize and maintain appropriate best management practices (BMPs) to contain excavated materials, and all pollutants, including oil from machinery/vehicles. The project will stabilize disturbed areas as appropriate at the end of the project.

54 ENVIRONMENTAL SCIENCES↗

CHANGING THE SAFETY CULTURE IN HANFORD TANK FARMS

In 2000 the Hanford Tank Farms had one of the worst safety records in the Department of Energy Complex. By the end of FY08 the safety performance of the workforce had turned completely around, resulting in one of the best safety records in the DOE complex for operations of its kind. This paper describes the variety of programs and changes that were put in place to accomplish such a dramatic turn-around. The U.S. Department of Energy's 586-square-mile Hanford Site in Washington State was established during World War II as part of the Manhattan Project to develop nuclear materials to end the war. For the next several decades it continued to produce plutonium for the nation's defense, leaving behind vast quantities of radioactive and chemical waste. Much of this waste, 53,000,000 gallons, remains stored in 149 aging single-shell tanks and 28 newer double-shell tanks. One of the primary objectives at Hanford is to safely manage this waste until it can be prepared for disposal, but this has not always been easy. These giant underground tanks, many of which date back to the beginning of the Manhattan Project, range in size from 55,000 gallons up to 1.1 million gallons, and are buried beneath 10 feet of soil near the center of the site. Up to 67 of the older single-shell tanks have leaked as much as one million gallons into the surrounding soil. Liquids from the single-shell tanks were removed by 2003 but solids remain in the form of saltcake, sludges and a hardened heel at the bottom of some tanks. The Department of Energy's Office of River Protection was established to safely manage this waste until it could be prepared for disposal. For most of the last seven years the focus has been on safely retrieving waste from the 149 aging single-shell and moving it to the newer double-shell tanks. Removing waste from the tanks is a difficult and complex task. The tanks were made to put waste in, not take it out. Because of the toxic nature of the waste, both chemically as well as radiologically, all retrieval operations must be performed using remote-controlled equipment which has to be installed in each tank, then removed when retrieval is completed. This process involves a variety of potentially hazardous construction activities including crane and rigging, excavation, electrical and piping work. It also requires strong attention to safety to avoid injuries to personnel and contamination of the environment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A pulse-controlled modified-burst test instrument for accident-tolerant fuel cladding

Pellet-cladding mechanical interaction due to thermal expansion of nuclear fuel pellets during a reactivity-initiated accident (RIA) is a potential mechanism for failure of nuclear fuel cladding. To investigate the mechanical behavior of cladding during an RIA, we developed a mechanical pulse-controlled modified burst test instrument that simulates transient events with a pulse width from 10 to 300 ms. This paper includes validation tests of unirradiated and prehydrided ZIRLO cladding tubes. A ZIRLO cladding sample with a hydrogen content of 168 wt. ppm showed ductile behavior and failed at the maximum limits of the test setup with hoop strain to failure greater than 9.2%. ZIRLO samples showed high resistance to failure even at very high hydrogen contents (1,466 wt. ppm). When the hydrogen content was increased to 1,554 wt. ppm, brittle-like behavior was observed at a hoop strain of 2.5%. Preliminary scoping tests at room temperature with FeCrAl tubes were conducted to imitate the pulse behavior of transient test reactors during integral tests. The preliminary FeCrAl tests are informative from the perspective of characterizing the test rig and supporting the design of integral tests for current and potentially accident tolerant cladding materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposal of a pretreated oil sludge by the cementation method

Radioactive oil sludge is generated in oil production rigs worldwide and in large quantities. However, in Brazil, there is no disposal route or well-defined treatment option for this waste. This sludge is classified as TENORM due to the presence of Potassium-40 and the radionuclides of the natural decay chains of thorium and uranium. The management of this radioactive waste has been in situ packaging on the offshore platforms, followed by its transport to storage facilities onshore. Long term storage is problematic due to the high content of hydrocarbons, sulfur and water, which generates the toxic gas H{sub 2}S and the corrosive sulfuric acid. Ozonation, an advanced oxidation process (AOP) can be considered an attractive option of treatment, and followed by cementation can improve safety in long-term storage. This work aims at investigating if the ozone process was able to enhance the immobilization capacity of oil sludge. Oil sludge from different drums and mixed oil sludge (obtained by mixing equal parts of each drum) were analyzed by ICP. Solidification of oil sludge with Portland cement enhances safety of the waste disposal. In addition, ozonation treatment is efficient in the degradation of organic compounds, increasing the resistance of the solidified material.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗