NGNP Risk Management Database: A Model for Managing Risk

The Next Generation Nuclear Plant (NGNP) Risk Management System (RMS) is a database used to maintain the project risk register. The RMS also maps risk reduction activities to specific identified risks. Further functionality of the RMS includes mapping reactor suppliers Design Data Needs (DDNs) to risk reduction tasks and mapping Phenomena Identification Ranking Table (PIRTs) to associated risks. This document outlines the basic instructions on how to use the RMS. This document constitutes Revision 1 of the NGNP Risk Management Database: A Model for Managing Risk. It incorporates the latest enhancements to the RMS. The enhancements include six new custom views of risk data - Impact/Consequence, Tasks by Project Phase, Tasks by Status, Tasks by Project Phase/Status, Tasks by Impact/WBS, and Tasks by Phase/Impact/WBS.

42 ENGINEERING↗

NGNP Risk Management Database: A Model for Managing Risk

To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

42 ENGINEERING↗

Quantitative Risk Management - Risk Informed Decision Making on High-Risk Waste Remediation Projects - 19022

For every $1 billion invested in projects, $97 million is wasted due to poor project performance. That means 9.7% of money spent on projects is wasted due to poor risk and uncertainty management. High-risk projects, similar to those in waste remediation, have the most to lose. A solid quantitative risk management program is one of the keys to increasing the likelihood that a project will succeed. A quantitative risk program solves two major problems that challenge the effective management of risk and uncertainty: 1. Risks arise at all levels of an organization; however, not all organizational levels have an effective way to identify and resolve them. This can lead to risks that, even if identified, are not reported. 2. Decision-makers are often forced to operate solely on intuition when implementing mitigation strategies, not fully understanding the effects that certain decisions have on the program's cost and schedule. A quantitative risk program uses a risk register and builds it into the project/program integrated schedule to assess the impact of these risks, typically at the 80% confidence contingency level for specific milestones and/or project completion. Implementing a quantitative risk program drives a forward-thinking, proactive mentality to problem solving into all levels of the organization. A healthy risk program for regular reporting and communication ensures that all members of an organization are thinking about risks and using their communication channels to resolve them. It gives a method of communication and incentive for all levels in the organization and helps to ensure that risks will be reported and resolved. Pacific Northwest National Laboratory (PNNL) has developed tools and methods that provide a level of realism for analyzing different scenarios and estimating contingency that does not exist in the standard industry risk tool kit. These tools and methods provide decision-makers with actionable, quantitatively based information to guide their decision making. The first tool is a probabilistic branching risk model for mitigation strategies. Current quantitative risk analysis tools in the industry simulate two cases: fully mitigated and un-mitigated. In the fully mitigated case, the user assumes that every planned mitigation activity is successful. In the un-mitigated case, the user assumes that none are successful. The truth lies between these two extremes. The PNNL team has developed a probabilistic risk model for mitigation scenarios that includes a probability that a mitigation activity will succeed and a probability that a mitigation action will be funded. These probabilities are elicited from subject matter experts and ensure that the contingency calculations at the specified confidence are approaching reality. The second tool developed at PNNL is the Risk Box, which is a tool that integrates with different scenarios in the risk register. For example, say the user is faced with two different and mutually exclusive mitigation actions to reduce a risk. The Risk Box methodology performs the contingency calculations and then displays them on a time-phased graph that shows how each scenario reduces the risk contingency needed on the project/program. This graph then provides quantitative information to show decision-makers which mitigation action provides the greatest reduction (cost and schedule) in risk contingency for the program. Implementing these and other tools within a structured risk program increases the likelihood that a project will come in on schedule and budget, ensures that all personnel are proactively thinking about problems and resolutions, creates communication channels for all members to submit and resolve potential problems, produces a prioritized list of risk rankings to focus leadership on issues that may cause the biggest problems, and implements processes that drive updates to the risk program as the risk profile changes. PNNL has been developing these methods and using them on projects for over 20 years. They have been successfully applied on waste management projects, high-tech research and development projects, and construction projects, and they continue to be used on a number of U.S. Department of Energy projects today. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applications of Capstone Depleted Uranium Aerosol Risk Data to Military Combat Risk Management

Risks to personnel engaged in military operations include not only the threat of enemy firepower but also risks from exposure to other hazards such as radiation. Combatant commanders of the U. S. Army carefully weigh risks of casualties before implementing battlefield actions using an established paradigm that take these risks into consideration. As a result of the inclusion of depleted uranium (DU) anti-armor ammunition in the conventional (non-nuclear) weapons arsenal, the potential for exposure to DU aerosols and its associated chemical and radiological effects becomes an element of the commanders’ risk assessment. The Capstone DU Aerosol Study measured the range of likely DU oxide aerosol concentrations created inside a combat vehicle perforated with a DU munition, and the Capstone Human Health Risk Assessment (HHRA) estimated the associated doses and calculated risks. This paper focuses on the development of a scientific approach to adapt the risks from DU’s non uniform dose distribution within the body using the current U.S. Department of Defense (DoD) radiation risk management approach. The approach developed equates the Radiation Exposure Status (RES) categories to the estimated radiological risks of DU and makes use of the Capstone-developed Renal Effects Group (REG) as a measure of chemical risk from DU intake. Recommendations are provided for modifying Army guidance and policy in order to better encompass the potential risks from DU aerosol inhalation during military operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Risk Management and Risk Aversion, from Benefit to Impediment

Risk management is a critical tool for improving the probability of project success by identifying, assessing, prioritizing, and attempting to control threats to project realization. For industries that require high operational reliability due to the potential consequences of off-normal events, such as the nuclear, aerospace, and chemical sectors, a major focus of risk management is the preservation of process safety. Due to the nature of the processes or systems under consideration, the associated process safety analyses (such as risk and safety assessments) and safety features can require significant resources. These costs are typically tolerated either due to the need to satisfy regulatory requirements or based on the assumption that they generally decrease the occurrence of unwanted events and therefore improve the probability of project success. However, as the level of acceptable or tolerable risk from unwanted events decreases, the required resources necessary for ensuring and demonstrating satisfaction of these criteria can grow and in turn can become one of the dominant impediments to project success. This paper outlines a high-level theoretical framework for the consideration of dominant project risks, which includes potential project failure from both the occurrence of high consequence off-normal events and the inability to achieve project completion due to the resource needs and innovation losses associated with extreme risk aversion. Utilizing such an integrated approach permits an attempt to optimize the probability of successful project realization while also providing valuable insight into the proper level of acceptable risk. The work is presented as a first step, in hopes of spurring additional discussion and analysis regarding appropriate levels of risk tolerance and the balance of project benefits.

Grabaskas, David↗

Managing Risk for Cassini During Mission Operations and Data Analysis (MOandDA)

A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working put into place will become visible and will be illusmted in future papers.

risk management↗

Continuous Risk Management

Risk identification is an ongoing activity that takes place during the routine project work flow. Project activities such as programmatic and technical meetings, telecons, reviews, and other forms of communication often bring to light project risks. When this occurs, we record and analyze the risk on a Risk Information Sheet. This process helps the project team identify and cope with project risks throughout the life of the project.

Sabelhaus, Phil↗

Advance Liquid Metal Reactor Discrete Dynamic Event Tree/Bayesian Network Analysis and Incident Management Guidelines (Risk Management for Sodium Fast Reactors)

Accident management is an important component to maintaining risk at acceptable levels for all complex systems, such as nuclear power plants. With the introduction of self-correcting, or inherently safe, reactor designs the focus has shifted from management by operators to allowing the system's design to manage the accident. Inherently and passively safe designs are laudable, but nonetheless extreme boundary conditions can interfere with the design attributes which facilitate inherent safety, thus resulting in unanticipated and undesirable end states. This report examines an inherently safe and small sodium fast reactor experiencing a beyond design basis seismic event with the intent of exploring two issues: (1) can human intervention either improve or worsen the potential end states and (2) can a Bayesian Network be constructed to infer the state of the reactor to inform.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Project Risk Management

Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

Risk Management↗

Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, and monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.

42 ENGINEERING↗

Applying the Risk Management Framework: The Distributed Energy Resource Risk Manager

As part of a multiyear effort, the National Renewable Energy Laboratory (NREL) has dedicated resources to understand and identify cybersecurity weaknesses in distributed energy resources (DERs) by performing assessments. Due to a lack of standardization and rapidly increasing adoption of DERs, there is a critical need to address cybersecurity needs for DER systems in an interactive way. Furthermore, federal agencies, which are required to obtain an authority to operate, are challenged by the complexities of including their DERs. To help meet this need, in early 2020, NREL released the Distributed Energy Resources Cybersecurity Framework (DERCF) and accompanying Web application. This process is supported by the Risk Management Framework (RMF) developed by the National Institute of Standards and Technology. This project, referred to as the DERCF RMF application, expands on the existing DERCF work to include methods that support walking a user through the seven RMF steps. The tool will be available for download at no cost from [link ]. The purpose of this paper is to describe the steps the DERCF team at NREL took to understand Steps 1-5 of the RMF process. Additionally, this document will identify future work on the first five steps as well as a plan for Steps 6 and 7.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk Management Implementation Tool

Continuous Risk Management (CM) is a software engineering practice with processes, methods, and tools for managing risk in a project. It provides a controlled environment for practical decision making, in order to assess continually what could go wrong, determine which risk are important to deal with, implement strategies to deal with those risk and assure the measure effectiveness of the implemented strategies. Continuous Risk Management provides many training workshops and courses to teach the staff how to implement risk management to their various experiments and projects. The steps of the CRM process are identification, analysis, planning, tracking, and control. These steps and the various methods and tools that go along with them, identification, and dealing with risk is clear-cut. The office that I worked in was the Risk Management Office (RMO). The RMO at NASA works hard to uphold NASA s mission of exploration and advancement of scientific knowledge and technology by defining and reducing program risk. The RMO is one of the divisions that fall under the Safety and Assurance Directorate (SAAD). I worked under Cynthia Calhoun, Flight Software Systems Engineer. My task was to develop a help screen for the Continuous Risk Management Implementation Tool (RMIT). The Risk Management Implementation Tool will be used by many NASA managers to identify, analyze, track, control, and communicate risks in their programs and projects. The RMIT will provide a means for NASA to continuously assess risks. The goals and purposes for this tool is to provide a simple means to manage risks, be used by program and project managers throughout NASA for managing risk, and to take an aggressive approach to advertise and advocate the use of RMIT at each NASA center.

Wright, Shayla L.↗

Root Source Analysis/ValuStream[Trade Mark] - A Methodology for Identifying and Managing Risks

Root Source Analysis (RoSA) is a systems engineering methodology that has been developed at NASA over the past five years. It is designed to reduce costs, schedule, and technical risks by systematically examining critical assumptions and the state of the knowledge needed to bring to fruition the products that satisfy mission-driven requirements, as defined for each element of the Work (or Product) Breakdown Structure (WBS or PBS). This methodology is sometimes referred to as the ValuStream method, as inherent in the process is the linking and prioritizing of uncertainties arising from knowledge shortfalls directly to the customer's mission driven requirements. RoSA and ValuStream are synonymous terms. RoSA is not simply an alternate or improved method for identifying risks. It represents a paradigm shift. The emphasis is placed on identifying very specific knowledge shortfalls and assumptions that are the root sources of the risk (the why), rather than on assessing the WBS product(s) themselves (the what). In so doing RoSA looks forward to anticipate, identify, and prioritize knowledge shortfalls and assumptions that are likely to create significant uncertainties/ risks (as compared to Root Cause Analysis, which is most often used to look back to discover what was not known, or was assumed, that caused the failure). Experience indicates that RoSA, with its primary focus on assumptions and the state of the underlying knowledge needed to define, design, build, verify, and operate the products, can identify critical risks that historically have been missed by the usual approaches (i.e., design review process and classical risk identification methods). Further, the methodology answers four critical questions for decision makers and risk managers: 1. What s been included? 2. What's been left out? 3. How has it been validated? 4. Has the real source of the uncertainty/ risk been identified, i.e., is the perceived problem the real problem? Users of the RoSA methodology have characterized it as a true bottoms up risk assessment.

Brown, Richard Lee↗

Managing Risk on a Technology Development Project/Advanced Mirror System Demonstrator

The risk management study applied to the Advanced Mirror System Demonstrator (AMSD), a precursor mirror technology development for the Next Generation Space Telescope (NGST) is documented. The AMSD will be developed as a segment of a lightweight primary mirror system that can be produced at a low cost and with a short manufacturing schedule. The technology gained from the program will support the risk mitigation strategy for the NGST, as well as other government agency space mirror programs.

Byberg, Alicia↗

Managing Risk for Thermal Vacuum Testing of the International Space Station Radiators

The International Space Station (ISS) is designed with large deployable radiator panels that are used to reject waste heat from the habitation modules. Qualification testing of the Heat Rejection System (HRS) radiators was performed using qualification hardware only. As a result of those tests, over 30 design changes were made to the actual flight hardware. Consequently, a system level test of the flight hardware was needed to validate its performance in the final configuration. A full thermal vacuum test was performed on the flight hardware in order to demonstrate its ability to deploy on-orbit. Since there is an increased level of risk associated with testing flight hardware, because of cost and schedule limitations, special risk mitigation procedures were developed and implemented for the test program, This paper introduces the Continuous Risk Management process that was utilized for the ISS HRS test program. Testing was performed in the Space Power Facility at the NASA Glenn Research Center, Plum Brook Station located in Sandusky, Ohio. The radiator system was installed in the 100-foot diameter by 122-foot tall vacuum chamber on a special deployment track. Radiator deployments were performed at several thermal conditions similar to those expected on-orbit using both the primary deployment mechanism and the back-up deployment mechanism. The tests were highly successful and were completed without incident.

Carek, Jerry A.↗