Search NASA⌕ Search

SEARCH · Search NASA

Results for “robot arm”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Long Reach Robotic Arm

The Accelerator Division at Fermilab began a robotics program, known as the AD Robotics Initiative. A multi-axis robotic arm was proposed to be included in the program. This summer internship, our team began the planning and design for this project, called the Long Reach Robotic Arm. The problem is that critical systems around the magnets require analysis when water leaks cause them to fail. However, the tightly compacted parts and the quadrupole magnet, weighing approximately 1,000 pounds, cause access viewing problems. The process of having to dismantle and remove the magnet is time-consuming; it is not an efficient solution. The goal for the Long Reach Robotic Arm was to extend and reach behind the component of the Main Injector while "snaking" around and avoiding obstructions. At the start of the project, my teammate, Amanda Hoeksema, and I coded a program in the C language that will determine the number of links and their respective lengths for the robot arm. After, we began the 3D CAD model of the robot arm, base, and counterweight system. The design of the Long Reach Robotic Arm provided a learning experience in learning how to code in the C programming language, using SDL libraries and understanding mechanical engineering.

43 PARTICLE ACCELERATORS↗

Counterweight for Long Reach Robotic Arm

Maintenance for vital systems proves challenging due to their location: tucked up and behind components. Pinpointing the precise location of errors presents difficulty when relying solely on the human eye. The solution to this issue arises in the form of a Long Reach Robotic Arm. An adequately balanced robot with several individually controlled links contains the capability to maneuver around obstructing components to locate the points of failure with accuracy. The design process for such a robot begins with the writing of a program. The program intends to visualize how the Long Reach Robotic Arm will move in 2D space by printing a select number of lines representing each arm link to the screen and controlling each link through the keyboard. This code substantially simplifies the design process for the multi-linked arm. The next step in the Long Reach Robotic Arm design process is the development of the arm and its counterweight system. The clear division of this work allows two interns to work on this project: one assumes responsibility for the arm, and the other for the counterweight. I undertook the design for the counterbalance. My half of the project is essential for maintaining safety as an extended multi-linked robot arm presents the challenge of preserving stability. The best method to supply a balance to the robot, even in extension, is a mobile counterweight with a compact design.

43 PARTICLE ACCELERATORS↗

Arc Weld Robotic Arm & Enclosure Seismic Anchorage in B226

The Arc Weld Robotic Arm & Enclosure is adequately anchored by the details shown on sheets SKS-01 through SKS-03. Two different Hilti anchors have been provided to allow for installation flexibility. Existing documentation shows that the existing enclosure base has been anchored with 5/8”Ø Kwik Bolt TZ’s. As a result, it is believed that the existing holes are sized for that 5/8”Ø anchor. The first option is to install a 5/8”Ø Kwik Bolt TZ2, similarly to the existing conditions. The second option is to use a threaded insert anchor. Since the largest allowable diameter of HIS-N insert is 1/2”Ø based on the slab thickness, 2”x2” square plate washers with a 9/16”Ø hole will need to be installed on the top of the existing enclosure base plates to reduce the diameter of the existing holes. This is required for the anchorage to provide proper restraint in a seismic event.

42 ENGINEERING↗

Self-balancing, long reach robotic arm

Vital accelerator components are difficult to inspect and troubleshoot when they fail. Theuse of a self-balancing, long articulating robot simplifies the identification and troubleshootingof broken components in the narrow places of the beamline by pinpointing the location of theseerrors due to its ability to maneuver through these limited spaces. The design of the long reachrobot is the second iteration of a previous model accomplished by interns Amanda Hoeksemaand Brenda Sanchez. This new robot was redesigned with a greater focus on safety and structural integrity by removing 3D-printed parts in load-bearing positions and switching to off-the-shelf components with manufacturer-specified capabilities. These changes ensure that the new robotic arm and counterbalance designs conform closer to safety regulations by not depending on the vague durability of 3D-printed parts. This design change necessitated new calculations for the arm and counterweight to ensure the robot will function as intended.

Hoeksema, Amanda↗

Successful cleanroom installation of PIP-II SSR2 coupler using robotic arm

To minimize the contamination of SRF cavities, remote installation techniques are needed during the installation of components. Recent work at Fermilab has been performed to begin the process of developing techniques for assembling cavities using robotics. Multiple alignment methods were prototyped including alignment and computer vision methods. Using a remotely controlled robotic arm, the alignment and installation of couplers have been successfully performed on prototype PIP-II SSR2 cavities in a cleanroom. The installation process will be shown to show to demonstrate the potential of future installations on other cavities and cavity ancillaries.

43 PARTICLE ACCELERATORS↗

Long Reach Robotic Arm

Explore the source record for details and available documents.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Successful Cleanroom Installation of PIP-II SSR2 Coupler Using Robotic Arm

The Fermilab Side-Coupled Linac accelerates H- beam from 116 MeV to 400 MeV through seven 805 MHz modules. Twelve wire scanners are present in the Side Coupled Linac and four are present in the transfer line between the Linac and the Booster synchrotron ring. These wire scanners act as important diagnostic instruments to directly collect information on the beam s transverse distribution. The manipulation of the conditions of wire scanner data collection enables further characterization of the beamline, such as calculating emittance and the Twiss parameters of the beam at select regions. Here we present the results of these studies and characterization of the non-Gaussian transverse beam distribution observed.

Narug, C.↗

Development of NDE/NDT Tools for High-Volume & High-Speed Inspection of CFRP Structures in Automotive Manufacturing

Main advantages of the air-coupled ultrasound testing (ACUT) and electromagnetic testing (EMT) techniques for NDE of CFRP composites were non-contact sensing, scalability for high-speed inspection, cost-effectiveness, and non-hazardous operation. Despite these advantages, no systems that would satisfy the project requirements were commercially available. Hence, one of the major efforts of the Michigan State University (MSU) team at the initial stage of the project was to close this technological gap by developing, optimizing, and validating array sensors that would provide sufficient sensitivity, spatial coverage, and resolution for robust defect detection. Optimization of the ACUT and EMT sensor designs was performed using experimentally validated finite element models. Initial experiments using array probes were conducted on relatively flat CFRP samples. In parallel, the MSU team designed and assembled a portable platform with two robotic arms. The robots were equipped with newly designed sensors that enabled high-speed NDE of curved CFRP parts. Presently, the developed robotic platform can be used as a demo/template NDE system, which is easily adaptable to manufacturing environments and in-line NDE. The ACUT NDE system developed by the MSU team used a high-power 4-channel pulser receiver for parallel data acquisition. The array probes were designed by stacking commercially available ACUT transducers, which operated in the frequency range between 100 kHz and 500 kHz. MSU optimized the excitation procedure and developed wave focusing cones so as to reduce the crosstalk between the transducers and to provide higher pulse repletion frequency (PRF). The through-transmission (TT) and single-side access (SSA) inspection modes were successfully implemented. In the TT-ACUT, structural defects in CFRP were detected by passing ultrasonic waves through the test part. Hence, the ACUT transmitters and receivers needed to be placed on the opposite sides of the test part. In the SSA-ACUT, guided waves (GW) were excited in the test part using the transmitters and were sensed by the receivers from the same side. Multi-channel TT-ACUT and SSA-ACUT provided high-speed NDE, and were successfully validated on CFRP test samples with interlaminar delaminations and other embedded defects The EM techniques developed by the MSU team included: 1) eddy current testing (ECT), 2) capacitive imaging (CI) and hybrid dual-mode imaging. In ECT, structural damage was detected in CFRP using coils sensor arrays. In ECT, the excitation magnetic field is generated by passing an alternating current through a coil, which is placed above the test sample. The excitation field penetrates the conductive sample and induces the eddy currents in its transect. In turn, the eddy currents generate the reaction field, which affects the total field sensed by a coil. Hence, the presence of structural flaws will alter the eddy current flow and the picked-up signal. ECT is mostly sensitive to local changes of the electric conductivity of the test sample, and CFRPs are mostly conductive in the direction of carbon fibers. Hence, ECT was well suited for the detection of fiber damage/fiber irregularities. The MSU team developed printed circuit boards (PCB) with coil sensor arrays optimized for NDE of CFRP. Unlike most commercial probes designed for ECT of metallic structures, the MSU array probes were designed for operation in [1-10] MHz frequency range, which was optimal for low-conductive CFRP. Multiple sensing topologies (coil groups excitation/sensing arrangements) were implemented and successfully validated. Capacitive Imaging (CI) technique developed by MSU was complementary to ECT. In contrast to ECT, which was sensitive to local changes of the electrical conductivity, the CI was sensitive to local changes of the dielectric constant. Therefore, CI could provide information about matrix damage/matrix irregularities in CFRP. The MSU CI sensor arrays were made of multiple circular or rectangular open-plate capacitors printed on PCB. Sensors of this type are not commercially available. In addition to ECT and CI, the MSU team developed a hybrid (dual-mode) inductive/capacitive measurement technique that synergistically combined the benefits of inductive and capacitive sensing for rapid NDE of fiber reinforced polymer (FRP) composite structures. Fiber damage and fiber irregularities in FRPs were detected by configuring hybrid sensors as coil sensors. Similarly, matrix damage, matrix irregularities and interlaminar delaminations were detected by configuring hybrid sensors as capacitive sensors. ECT and CI were performed sequentially by means of electronic switching. Hence, eliminating the need for mounting two separate sensor arrays on the probe. Portable robotic platform was developed by MSU for multi-technique high-speed NDE of CFRP test parts. The platform had two 6-axis robots, which enabled inspection of curved parts in approximately a 6×6×6 ft 3 active scan area. On the software side, the MSU team integrated scripts for NDE hardware control with scripts for robot motion control. MSU also implemented automated path planning for the robots, reconstruction of part’s surfaces via stereovision, 3D rendering of inspection data, and image processing algorithms for enhanced defect detection. Automotive composite parts manufactured by Plasan Composites from Phase I were used to validate the ACUT and EMT techniques on representative testbeds. Among those parts were three X-braces for a Dodge Viper, one composite calibration plaque with known defects at known locations, and four other test sections, including sections from a front splitter, a corner section from a composite hood, and a high-pressure RTM panel made using non crimp fabric. Other test samples included CFRP and GFRP calibration plates with fiber/matrix defects fabricated at MSU/CVRC.

36 MATERIALS SCIENCE↗

Robotic Assisted Non-Destructive Testing (NDT)

Mission Statement: Concrete wall characterization for structural integrity evaluation of H-Canyon exhaust tunnel using a remote controlled robotic arm with a NDT Concrete Instrument. Challenges: Rough and Curved Surfaces, Remote location. The UR5 is a collaborative robotic arm capable of: Payload: 11 lbs (5 kg), Reach: 33.5 in (850 mm), Footprint: 5.87 in (149 mm) diameter, Weight: 45.4 Ibs (20.6 kg). The force torque sensor reacts to a set value inputted by the user that can be utilized for sensitive products. This allows the UR5 to react to surfaces using the built-in function to search for a wall and orient itself normal to that plane. The Proceq Pundit 250 array is a nondestructive device that the user applies against a concrete wall and scans using ultrasonic transducers. The back wall and other defects can be show through the touchscreen. A fixture to hold the Proceq Pundit 250 array onto the UR5 robotic arm was designed and 3D printed. It includes openings for easy access to the buttons from the Pundit array as well as a reinforced structural design. The scan from the Pundit array can show the back-wall, rebars, and other defects to assist in determining the structural integrity. In order to scan, a program was made to search for the wall first. 1. The UR5 robotic arm will go to the desired location away from the wall. 2. It will then search for the wall by moving towards it slowly. 3. After contact, the force applied will slowly but steadily increase to a preset value inputted by the user. 4. The force torque sensor will use those values and communicate with the UR5 by adjusting the arm to become normal to the wall. 5. The arm will then apply force to push back the transducers on the Pundit array to avoid gaps. 6. It will then prompt the user to collect data and wait until finished. The UR5 teach pendant allows the user to program the robot to perform automated and repeatable tasks. It includes a free drive mode which allows the user to move the arm to a desired position by hand. The user can also apply restricted planes which include either stopped or slower motion to ensure safety. The concrete sample being tested includes rebars and different grades of surface roughness to understand the readings from the Proceq Pundit 250 array. Desired concrete samples are currently being fabricated that will simulate the terrain being tested.

3D PRINTING↗

Improving Self-Driving Labs: Quantifying System-Level Experiment Repeatability and Broadening Instrument-Level Compatibility

Modular Autonomous Research System (MARS) is a self-driving laboratory (SDL) which performs wet-lab science with peptide-lanthanide combinations in an automated and, ultimately, an autonomous manner to aid in soil analysis for domestic lithium mining. Autonomous experimentation involves automated experimentation, experiment planning, and active learning. MARS consists of a 6-axis robotic arm (UR5e) on a linear rail, pipette robots (Opentrons 2), and microplate readers. These components transport, operate on, and collect data with chemical solutions in standard labware. For effective autonomy, MARS must perform system-level labware operations repeatably, plan experiments autonomously, and be portable between research-domains. Repeatability is evaluated by labware placement precision, such that future operations can properly locate labware, as well as the elapsed time, so that low variance mean estimates of experiment duration can inform high-level researcher decision making. Autonomous experiment planning is the next step to decouple experimentation from human management; however, there is a conflict between the ideal system-level experiment goals and the constraints imposed by instruments’ limitations. Sub-domain portability is a long-term goal to extend MARS’ research beyond the chemistry of peptide-lanthanide binding to other sub-domains without having to invest significant overhead to system retrofitting. To address these goals, we manually trained the robotic arm labware placement and modelled statistical failurerate and uncertainty Additionally, we benchmarked the duration and variance of each experiment sub-operation as a heuristic for research decision making. Next, we use a parameterized geometric program (PGP) approach to design experiments that optimize system-level objectives and satisfy instrument-level constraints. Lastly, we proposed a Python framework to maximize MARS’ extensibility to other scientific sub-domains through a JSON-based experiment specification.

36 MATERIALS SCIENCE↗

Single site robotic device and related systems and methods

Disclosed herein are various medical device components, including components that can be incorporated into robotic and/or in vivo medical devices. Also disclosed are various medical devices for in vivo medical procedures. Included herein, for example, is a surgical robotic device having an elongate device body, a right robotic arm coupled to a right shoulder assembly, and a left robotic arm coupled to a left shoulder assembly.

Mondry, Jack↗

Single site robotic device and related systems and methods

Disclosed herein are various medical device components, including components that can be incorporated into robotic and/or in vivo medical devices. Also disclosed are various medical devices for in vivo medical procedures. Included herein, for example, is a surgical robotic device having an elongate device body, a right robotic arm coupled to a right shoulder assembly, and a left robotic arm coupled to a left shoulder assembly.

Source record↗

Design of a robot-automated flat plate/reflection geometry x-ray diffraction setup for accelerated materials discovery and structural screening

Here, we report the design, construction, and automation of a flat plate sample loading, alignment, and data acquisition system for X-ray diffraction measurements in reflection geometry implemented at the Stanford Synchrotron Radiation Lightsource. The system is built onto a single platform, enabling facile transferability, and is compartmentalized into sample storage, sample transfer, and sample position/alignment segments. The core feature of this system is a six-axis robotic arm that offers a large range of highly reproducible and programable movements. The degrees of freedom of the robot arm enable adaptability in which movements can be modified to fit various beamline environments and sample configurations. Samples are housed on 3D printed sample mounts, which are arranged onto a 6 × 2 array of sample cassettes capable of holding 7 samples. Using sample mounts designed for solid oxide electrolysis button cells (SOECs), the maximum tray capacity is 84 samples, which can be aligned and run in ~ 24 hours with long exposure scans. The sample array is additionally capable of accommodating a range of sample sizes and geometries due to the rapid 3D printed fabrication. The components of the setup will be described in detail and performance will be demonstrated with a set of representative SOEC and XRD standard samples. Opportunities for future developments and integration with the automated setup are summarized.

08 HYDROGEN↗

Automated Inspection of Criticality Control Overpacks for Surplus Plutonium Disposition: Qualification Update – 25313

In an effort to reduce the amount of nuclear waste in South Carolina, the Department of Energy (DOE) tasked the Savannah River Site (SRS) with diluting and disposing of the amount of plutonium in the state. This process involves the movement and shipment of over 100,000 criticality control overpacks (CCOs) throughout the project lifespan, lending itself to the use of automation to reduce worker radiation exposure and more efficiently utilize human capital. Due to the large scope, this overarching process was broken down into several different “automation projects” to be developed. The first opportunity pursued was the receipt and inspection of empty CCO drums coming into SRS, identified as Automation Project 1 (AP1), and is the focus of this paper. AP1 was developed to unpack incoming CCOs and inspect them for unwanted foreign objects and any damage to the drum or its contents. This process is accomplished by the combination of an automated guided vehicle (AGV) that delivers CCOs to a robotic arm which uses a suite of custom tools to disassemble a CCO, inspect the inside and outside of the CCO and its inner criticality control container (CCC), reassemble the CCC and CCO, and apply a tamper indicating device (TID) to the inspected drum. In past years, the robotic work cell had been developed in a small-scale testing facility for proof-of-concept. This year, major improvements were made to the robotic work cell to perform the process, including integration into the final facility where CCOs will be inspected. Other technical improvements include the implementation of sensor feedback and safety relays into the control system to allow the state of the work cell to be better tracked, and additional development of the TID application process to complete the robotic inspection. Further enhancements were made to the robotic vision processes and robot pathing, as well as development on a computer vision inspection process to detect inspection criteria anomalies in CCOs. In addition to developmental improvements, the work cell underwent a six-month testing period to ensure the project requirements were met. Results of this testing period demonstrate the work cell’s capability to meet project throughput goals at an acceptable level, successfully document the status of each CCO inspected, and reduce the toll on technical operations’ human power by two thirds. At the time of this paper, the work cell is capable of autonomously handling up to eight CCOs with an AGV, delivering CCOs to and from the robot work cell, and having a robotic arm perform a full receipt and inspection procedure on each CCO. Moving forward, repeatability will be improved so that these CCOs can be run back-to-back seamlessly, as well as improving the system to handle more significant edge cases and failure modes.

Spivey, Nicholas↗