Search NASA⌕ Search

SEARCH · Search NASA

Results for “robotic assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Robotic Assembly of Multi-Chip Modules Using Artificial Intelligence

With many properties of dark matter remaining a mystery, the OSCURA experiment aims to detect light dark matter particles using 1,536 Multi-Chip Modules (MCMs), containing a total of 24,576 skipper CCDs. Currently, each MCM is assembled by hand a time-consuming and error-prone process that can be automated. In this ongoing work, we present an automated assembly robot that leverages modern computer vision and artificial intelligence to assemble the OSCURA MCMs. This approach reduces cost, time, and error in the packaging of OSCURA sensors.

Arteaga, Matthew [Northern Illinois U.; Fermilab]↗

Automated Reconfigurable Mission Adaptive Digital Assembly Systems (ARMADAS): Robotically Assembled Sustainable Lunar Infrastructure

Introduction: The Automated Reconfigurable Mission Adaptive Digital Assembly Systems (ARMADAS) project at NASA Ames Research Center is developing autonomous infrastructure, instrumentation, and spacecraft assembly and manufacturing capabilities for next generation exploration and science missions, with a goal to change the cost scaling of these missions relative to mission size and duration. Using a building-block approach with a 'kit of parts' composed of ultra-light, high-performance mechanical metamaterials, simplified robots leverage the period environment to achieve high levels of autonomy and reliability for in-space and surface assembly of large-scale apertures, solar-arrays, towers, habitats, and other infrastructure. Robots and structure break down into a compact form factor for launch. By leveraging economies of scale and achieving high-packing ratios, ARMADAS technology can revolutionize possible space missions by breaking the tyranny of the launch shroud, decreasing development times, decreasing mission costs for transformative science capability, and providing a scalable and versatile space infrastructure strategy. Capabilities: To date, the ARMADAS project has demonstrated autonomous assembly of large numbers of structural modules into a meters-scale structure in an earth gravity environment. The mechanical performance is on par with conventional space structures, at a fraction of the cost. By using highly repeatable manufacturing processes (injection molding carbon fiber reinforced space-rated polymers), the structures are both cost effective and highly precise. The ARAMADAS system carefully designs parts for high-precision assembly–the simple and cost-effective robots build structures much larger and more precise than themselves. While maintaining structural efficiency, the ARMADAS system encompasses many functional module types, including for solar power, comm/power routing, etc., that will enable entire infrastructure systems to be engineered and autonomously assembled with modular parts. With well-defined interfaces, custom instrumentation modules can easily be added to fit many mission objectives. Lunar Infrastructure Vision: At the LSIC spring meeting, ARMADAS will present a vision for a general-purpose lunar construction kit capable of meeting a wide variety of lunar surface infrastructure needs (Figure 1). Investing in an ecosystem of reconfigurable, discretely repairable parts and robots enables systems than can expand their capability, reconfigure to meet emergency or unforeseen needs, self-repair and reduce spare-part needs. With a small set of parts (module types), a wide variety of infrastructure needs can be met. Footing modules will allow infrastructure construction at locations with no surface preparation. Footer, primary structure, and rail modules can create reconfigurable rail systems. These rail systems can be used to reduce cost-of-transport between frequently accessed sites, provide dust mitigation, and convey power and communications. High-performance structure modules combined with power-routing and solar modules can create tall towers for power and communication. Concepts for habitats and garages encompass a structure to support regolith cover for a pre-integrated module to an entirely ARMADAS system-based structure. This system can be leveraged by many in-situ resource utilization (ISRU) technologies to simplify processes and augment capabilities.

C. E. Gregg↗

Formulation of design guidelines for automated robotic assembly in outerspace

The approach for arriving at design guidelines for assembly by robots in outerspace is illustrated. The use of robots in a zero gravity environment necessitates that extra factors over and above normal design guidelines be taken into account. Besides, many of the guidelines for assembly by robots on earth do not apply in space. However, considering the axioms for normal design and assembly as one set, guidelines for design and robotic assembly as another, and guidelines for design and assembly in space as the third set, unions and intersections of these sets can generate guidelines for two or more of these conditions taken together - say design and manual assembly in space. Therein lies the potential to develop expert systems in the future, which would use an exhaustive database and similar guidelines to arrive at those required by a superposition of these conditions.

Dwivedi, Suren N.↗

Planning and scheduling for robotic assembly

A system for reasoning about robotic assembly tasks is described. The first element of this system is a facility for itemizing the constraints which determine the admissible orderings over the activities to be sequenced. The second element is a facility which partitions the activities into independent subtasks and produces a set of admissible strategies for each. Finally, the system has facilities for constructing an admissible sequence of activities which is consistent with the given constraints. This can be done off-line, in advance of task execution, or it can be done incrementally, at execution time, according to conditions in the execution environment. The language of temporal constraints and the methods of inference presented in related papers are presented. It is shown how functional and spatial relationships between components impose temporal constraints on the order of assembly and how temporal constraints then imply admissible strategies and feasible sequences.

Fox, Barry R.↗

Knowledge representation system for assembly using robots

Assembly robots combine the benefits of speed and accuracy with the capability of adaptation to changes in the work environment. However, an impediment to the use of robots is the complexity of the man-machine interface. This interface can be improved by providing a means of using a priori-knowledge and reasoning capabilities for controlling and monitoring the tasks performed by robots. Robots ought to be able to perform complex assembly tasks with the help of only supervisory guidance from human operators. For such supervisory quidance, it is important to express the commands in terms of the effects desired, rather than in terms of the motion the robot must undertake in order to achieve these effects. A suitable knowledge representation can facilitate the conversion of task level descriptions into explicit instructions to the robot. Such a system would use symbolic relationships describing the a priori information about the robot, its environment, and the tasks specified by the operator to generate the commands for the robot.

Jain, A.↗

Automated Multi-Robot Assembly of Compliance Optimized Structures

Autonomous assembly of large structures is one of the fundamental challenges on the way towards NASA’s objectives of deep space exploration. In this work, we propose an algorithmic framework to optimize the assembly process of a prescribed target structure by constraining the assembly effort as well as maintaining structural soundness throughout the process. This framework uses structural topology optimization with assembly effort metrics to generate checkpoints for robotic traversal algorithms. Assembly effort is quantified by the Wasserstein metric between consecutive structural configurations during the assembly process. The robotic assembly task is split into two subtasks, where we first optimize for a set of key frames, then perform reconfiguration between consecutive frames. Key frames are optimized by adopting topology optimization techniques to reduce assembly effort and maintain structural integrity during the assembly process, while reconfiguration between key frames is performed using a path planning algorithm with a minimum weight maximum matching approach on a bipartite graph. We employ a Crystalline robot model in which each structural element is capable of locomotion through the structure and locking into place with neighboring elements after reaching its destination. An example assembly of a two-dimensional cantilever beam under volume constraints and structural compliance considerations is presented to demonstrate the approach. Finally, we conclude by discussing possible future extensions to this work, including adoption of better metrics, extension to three-dimensional large-scale problems, and exacting finer control of structural integrity during the path-planning phase.

robotic assembly↗

Robotic Assembly Activities at NASA Langley Research Center

Over the past several decades, NASA Langley Research Center (LaRC) has developed a suite of hardware and software capabilities for robotic in-space assembly. Specific robots include the Lightweight Surface Manipulation System (LSMS), Tendon-Actuated Lightweight In-Space Manipulator (TALISMAN), NASA Intelligent Jigging and Assembly Robot (NINJAR), Strut Assembly, Manufacturing, Utility & Robotic Aid (SAMURAI), and most recently the Assemblers modular robots. Alongside the hardware, software tools such as the Autonomous Entity Operations Network (AEON) and the Baseline Environment for Autonomous Modeling (BEAM) have been developed to enable communication and simulation respectively. These tools have supported foundational research in single and multi-agent control, sensing and perception, trajectory generation, task allocation, and human-machine teaming. This talk will provide a broad overview of these capabilities and go into detail on recent developments made by the Assemblers project to create modular, reconfigurable robots for autonomous in-space assembly.

John R Cooper↗

A Robotically Assembled and Serviced Science Station for Earth Observations

In this paper we present the overall architecture of a ”Science Station”, a robotically assembled and serviced persistent platform that can host multiple payloads for Earth observations. Recent decadal survey findings motivate the need to have spatial and temporal concurrency in measurements from multiple instruments. We have architected the science station to simultaneously host up to twelve Earth Venture class instruments at a time. These instruments can be replaced by newer instruments periodically to take advantage of evolving science needs and technology capabilities. The Science Station can also concurrently host science, commercial, defense and other national interest payloads. The Science Station may provide a cost-effective paradigm by mitigating some of the risks and costs associated with multiple free-flyers that may otherwise be needed for the various instruments. It leverages emergent and existent technologies in robotic assembly and servicing, lower cost commercial launch vehicles, secondary launch vehicles, and rendezvous and proximity operations. In this paper, we report the findings of a survey we conducted on the desired performance of the Science Station from various instrument hosting perspectives. We report the various trade studies that we conducted to developed a feasible architecture that meets the goals of the Science Station while also meeting the constraints of a space system. We also report the various considerations in the configuration, thermal system, pointing system, overall concept of operations, and the robotic system of the Science Station architecture. The paper then describes a testbed activity we are undertaking to evaluate the supervised autonomy robotics needed for the Science Station as well as to conduct a riskreduction demonstration of the end-to-end robotics behaviors.

Mukherjee, Rudranarayan↗

Development of a truss joint for robotic assembly of space structures

This report presents the results of a detailed study of mechanical fasteners which were designed to facilitate robotic assembly of structures. Design requirements for robotic structural assembly were developed, taking into account structural properties and overall system design, and four candidate fasteners were designed to meet them. These fasteners were built and evaluated in the laboratory, and the Hammer-Head joint was chosen as superior overall. It had a high reliability of fastening under misalignments of 2.54 mm (0.1 in) and 3 deg, the highest end fixity (2.18), the simplest end effector, an integral capture guide, good visual verification, and the lightest weight (782 g, 1.72 lb). The study found that a good design should incorporate chamfers sliding on chamfers, cylinders sliding on chamfers, and hard surface finishes on sliding surfaces. The study also comments on robot flexibility, sag, hysteresis, thermal expansion, and friction which were observed during the testing.

Parma, George F.↗

ISS-based Development of Elements and Operations for Robotic Assembly of A Space Solar Power Collector

We present a concept for an ISS-based optical system assembly demonstration designed to advance technologies related to future large in-space optical facilities deployment, including space solar power collectors and large-aperture astronomy telescopes. The large solar power collector problem is not unlike the large astronomical telescope problem, but at least conceptually it should be easier in principle, given the tolerances involved. We strive in this application to leverage heavily the work done on the NASA Optical Testbed Integration on ISS Experiment (OpTIIX) effort to erect a 1.5 m imaging telescope on the International Space Station (ISS). Specifically, we examine a robotic assembly sequence for constructing a large (meter diameter) slightly aspheric or spherical primary reflector, comprised of hexagonal mirror segments affixed to a lightweight rigidizing backplane structure. This approach, together with a structured robot assembler, will be shown to be scalable to the area and areal densities required for large-scale solar concentrator arrays.

astronomy↗

Probe-And-Socket Fasteners For Robotic Assembly

Self-alignment and simplicity of actuation make mechanism amenable to robotic assembly. Includes socket, mounted on structure at worksite, and probe, mounted on piece of equipment to be attached to structure at socket. Probe-and-socket mechanism used in conjunction with fixed target aiding in placement of end effector of robot during grasping, and with handle or handles on structure. Intended to enable robot to set up workstation in hostile environment. Workstation then used by astronaut, aquanaut, or other human, spending minimum time in environment. Human concentrates on performing quality work rather than on setting up equipment, with consequent reduction of risk.

Nyberg, Karen↗

Theoretical method for calculating relative joint geometry of assembled robot arms

Equations are developed to extract the relative joint parameters of an assembled robot arm. Specifically, the Denavit-Hartenberg parameters, which completely characterize the relative joint geometry, are calculated. These parameters are needed to control the hand of the robot arm by resolved rate. As an example, the parameter extraction equations are used with perfect simulated data (no measurement noise) obtained from a mathematical model of a six-degree-of-freedom robot arm. For an actual application, measurement data needed to estimate the relative joint parameters can be generated by moving a robot arm to different positions, measuring the location of the hand (or other extension) in base coordinates, and recording the corresponding joint angles.

Barker, L. K.↗

End-effector - joint conjugates for robotic assembly of large truss structures in space: A second generation

Current designs, a first generation intended for robotic assembly, have given priority to the ease and certainty of the assembly process under less than ideal conditions with a minimum of sensory feedback. As a consequence they are either heavy or expensive and all exhibit a relatively low packaging density. Low packaging density is caused by extensive scars applied to the node, increasing its envelope diameter by as much as 150 percent. Strut envelopes are violated to a lessor extent with diameters increased by 25 percent or more. This smaller percentage is still a significant problem owing to a much higher fraction of the packaged volume represented by struts. As structures in space become larger, packaging density becomes an important consideration. The objective is to develop end-effector-joint conjugates that do not violate the envelopes of a 2.5 inch diameter node or a 1.0 inch diameter strut.

Brewer, W. V.↗

Multi-Robot Assembly Scheduling for the Lunar Crater Radio Telescope on the Far-Side of the Moon

The Lunar Crater Radio Telescope (LCRT) is a pro- posed ultra-long-wavelength radio telescope to be constructed on the far side of the moon. The proposed telescope will be constructed by deploying a 1km wire mesh in a 3-5km crater using a team of wall-climbing DuAxel robots. In this work, we consider the problem of generating minimum-time assembly sequences for LCRT, using realistic models of travel speed and lighting. Specifically, we pose the assembly sequencing problem as a mixed-integer linear program (MILP), which we solve to global optimality using commercial solvers. We present methods for modeling time-varying travel and assembly times, based on variable lighting conditions (including crater shadowing), and show how such time-varying parameters can be incorporated into the MILP. Finally, we present numerical studies of our method, showing how makespan varies with the number of assembly robots.

Schwager, Mac↗

Vector-algebra approach to extract Denavit-Hartenberg parameters of assembled robot arms

The Denavit-Hartenberg parameters characterize the joint axis systems in a robot arm and, naturally, appear in the transformation matrices from one joint axis system to another. These parameters are needed in the control of robot arms and in the passage of sensor information along the arm. This paper presents a vector algebra method to determine these parameters for any assembled robot arm. The idea is to measure the location of the robot hand (or extension) for different joint angles and then use these measurements to calculate the parameters.

Barker, L. K.↗

Robotic Specialization in Autonomous Robotic Structural Assembly

Robotic in-space assembly of large space structures is a long-term NASA goal to reduce launch costs and enable larger scale missions. Recently, researchers have proposed using discrete lattice building blocks and co-designed robots to build high-performance, scalable primary structure for various on-orbit and surface applications. These robots would locomote on the lattice and work in teams to build and reconfigure building-blocks into functional structure. However, the most reliable and efficient robotic system architecture, characterized by the number of different robotic 'species' and the allocation of functionality between species, is an open question. To address this problem, we decompose the robotic building-block assembly task into functional primitives and, in simulation, study the performance of the the variety of possible resulting architectures. For a set consisting of five process types (move self, move block, move friend, align bock, fasten block), we describe a method of feature space exploration and ranking based on energy and reliability cost functions. The solution space is enumerated, filtered for unique solutions, and evaluated against energy and reliability cost functions for various simulated build sizes. We find that a 2 species system, dividing the five mentioned process types between one unit cell transport robot and one fastening robot, results in the lowest energy cost system, at some cost to reliability. This system enables fastening functionality to occupy the build front while reducing the need for that functional mass to travel back and forth from a feed station. Because the details of a robot design affect the weighting and final allocation of functionality, a sensitivity analysis was conducted to evaluate the effect of changing mass allocations on architecture performance. Future systems with additional functionalities such as repair, inspection, and others may use this process to analyze and determine alternative robot architectures.

Bernus, Borbala↗

SpRoUTS (Space Robot Universal Truss System): Reversible Robotic Assembly of Deployable Truss Structures of Reconfigurable Length

Automatic deployment of structures has been a focus of much academic and industrial work on infrastructure applications and robotics in general. This paper presents a robotic truss assembler designed for space applications - the Space Robot Universal Truss System (SpRoUTS) - that reversibly assembles a truss from a feedstock of hinged andflat-packed components, by folding the sides of each component up and locking onto the assembled structure. We describe the design and implementation of the robot and show that the assembled truss compares favorably with prior truss deployment systems.

Deployable↗