Search NASA⌕ Search

SEARCH · Search NASA

Results for “schedule contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Multi-Timescale Integrated Dynamic and Scheduling Model (MIDAS-Solar)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power system operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power systems steady-state and dynamic performance. This project helps meet and exceed the Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for electric grid planning and operation. This will be accomplished by developing temporally comprehensive, closed-loop simulation models that seamlessly simulate power systems operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). Both a multi-timescale grid model and an integrated PV model will be developed in this project to accurately study the impacts of PV variability and uncertainty on system reliability at multiple timescales. Using quasi-dynamic simulation methods and data-driven security assessment (DSA) criteria will allow the dynamic characteristics of PV to be fed forward into longer-timescale scheduling models for a complete understanding of the effect of short-term PV dynamics on bulk systems operations (e.g., reserve scheduling and deployment). Upon completion of the proposed model, this project will help operators accurately assess system reliability by deploying energy and reserve scheduling under critical contingency conditions and studying interactions among all types of essential reliability services provided by modern PV power plants.

14 SOLAR ENERGY↗

On Secured Spinning Reserve Deployment of Energy-Limited Resources Against Contingencies

Featured with fast response abilities and high ramp rates, energy storage systems (ESS), such as pumped-storage hydropower (PSH) plants and battery storage systems (BSS), are considered as key first-responders to provide spinning reserve in response to system contingencies. However, ESSs are energy-limited resources, and their sustained spinning reserve deployment is restricted by the stored energy and available capacity. Indeed, the spinning reserve deployment against contingencies may deviate actual state-of-charge (SOC) from the scheduled value, inducing potential SOC boundary violations and non-dispatchability in later hours. This paper proposes the post-contingency operation model and the spinning reserve secure constraints to address these issues. The post-contingency operation model describes that spinning reserve from ESSs is promptly deployed when contingency occurs, and then gradually substituted by quick-start units when they are switched online. By leveraging this operation strategy, spinning reserve secure constraints in terms of SOC headrooms are adopted to guarantee its deplorability. Furthermore, a modified IEEE 118-bus system with multiple PSHs and BSSs is used to verify the proposed approach.

13 HYDRO ENERGY↗

Synchronized Phasor Measurement Unit-based Central Controller for Normal and Contingent Operation of a High-Capacity HVDC Macrogrid for the Continental US

This paper presents a Synchronized Phasor Measurement Unit (PMU) based controller to support the coordination and operation of a high-capacity high-voltage direct current (HVDC) macrogrid transmission for the continental US. The proposed controller allows for optimal scheduling of each segment of the multi-terminal HVDC network under normal and contingent conditions, while considering minimum levels of frequency response requirements. The performance of the proposed controller is tested on a 100,222-bus representation of the US Eastern and Western interconnections. Results show that a centralized PMU-based controller improves the frequency nadir of the HVDC macrogrid under contingency conditions by 25.9%. Furthermore, the primary frequency response (PFR) of the HVDC macrogrid is increased by 33.4%. The performance of each interconnection under the largest credible contingency conditions is also discussed.

Mohan, Nihal↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

On the role of Battery Energy Storage Systems in the day-ahead Contingency-Constrained Unit Commitment problem under renewable penetration

The integration of variable Renewable Energy Sources (vRES) to alleviate greenhouse gas emissions has introduced significant challenges for power systems operations. These challenges include high levels of uncertainty due to the intermittence associated with vRES and therefore impose the need to devise a reliable and cost-effective day-ahead unit commitment and power and reserves scheduling for real-time operations. Also, this increasing penetration of vRES requires higher ramping capabilities from units originally designed for other purposes (e.g., base-load generation), which might be exacerbated during contingency states. Hence, in this work, we propose a methodology to address the day-ahead Contingency-Constrained Unit Commitment (CCUC) problem that leverages the participation of Battery Energy Storage Systems (BESSs) to address load-following and post-contingency management, therefore alleviating the ramping burden on conventional thermal generators. To do so, we formulate a three-level optimization problem that represents the decision-making process of obtaining the least-cost commitment, generation and reserves scheduling, while restricting the Conditional Value-at-Risk (CVaR) of the system imbalance at real-time operations to user-defined tolerance levels. In addition, we devise a computationally efficient solution approach for the proposed problem based on the Column-and Constraint Generation (CCG) algorithmic framework. Two numerical experiments are conducted to empirically illustrate the benefits of the proposed methodology. Key results indicate a reduction in real-time ramping needs and a better usage of the system resources, with a reduction in the overall system commitment levels and reserve scheduling costs when compared to a benchmark case in which storage is not available.

Moreira, Alexandre↗

Post-extreme-event restoration using linear topological constraints and DER scheduling to enhance distribution system resilience

In this paper, a post-extreme-event restoration (PEER) algorithm is proposed to improve distribution system resilience. Linear topological constraints are proposed to ensure radial topology after N-k contingencies, possibly in multiple islands. The approach is made comprehensive by considering dispatchable distributed energy resources (DERs), non-dispatchable DERs, and demand responses, as well as on-load tap changers (OLTCs) and shunt capacitors. The goal is to minimize the accumulative expense caused by load reduction payment or penalty, as well as DER operation cost. As a result, the overall system will survive longer with higher resilience during an extreme event. To verify the effectiveness of the PEER algorithm, we proposed a resilience evaluation algorithm using Monte Carlo simulation (MCS) with reduced scenarios. This is based on a probabilistic model for generating random scenarios which consider the uncertainty of line faults and solar irradiance. Combined with the proposed PEER algorithm, this reduced-scenario MCS can evaluate the expected energy not served (EENS) which is an essential index for distribution system resilience. Case studies of the IEEE 33-bus and 123-bus test systems validate the proposed algorithm in reducing EENS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wash Vehicle Fleet Sizing for Contingency Planning Against Dust Storms

Wash vehicles containing either high- or low-pressure water sprayers, a collection of rotating brushes, or a combination of these, are frequently utilized in concentrating solar power (CSP) plants to maintain a high level of optical efficiency in the solar field. In recent years, multiple modeling approaches have been developed to obtain fleet sizes and mirror-washing schedules that optimize the tradeoff of vehicle capital and use costs and labor versus lost revenues due to soiling. These planning models cover normal operating conditions well but do not consider rare events such as dust storms which can cause a significant reduction in receiver productivity, or shut down operations until most or all of the solar field's mirrors have been cleaned. To that end, we propose a methodology that evaluates whether additional capital should be deployed to hedge against these events by weighing the net present value of the expected benefits against the capital costs. The output of this method is a breakeven frequency, a metric we sue to determine whether an additional vehicle should be purchased to address the contingency of dust storms by comparing it to the expected annual storm frequency We develop a small collection of case studies using commercial-scale CSP tower plants and obtain breakeven frequencies that mostly fall between 0.1 and 1.0 storms per year, depending on the existing fleet size and storm severity.

concentrating solar power↗

Wash Vehicle Fleet Sizing for Contingency Planning Against Dust Storms: Preprint

Wash vehicles containing either high- or low-pressure water sprayers, a collection of rotating brushes, or a combination of these, are frequently utilized in concentrating solar power (CSP) plants to maintain a high level of optical efficiency in the solar field. In recent years, multiple modeling approaches have been developed to obtain fleet sizes and mirror-washing schedules that optimize the tradeoff of vehicle capital and use costs and labor versus lost revenues due to soiling. These planning models cover normal operating conditions well but do not consider rare events such as dust storms which can a significant reduction in receiver productivity, or shut down operations until most or all of the solar field’s mirrors have been cleaned. To that end, we propose a methodology that evaluates whether additional capital should be deployed to hedge against these events by weighing the net present value of the expected benefits against the capital costs. The output of this method is a breakeven frequency, a metric we sue to determine whether an additional vehicle should be purchased to address the contingency of dust storms by comparing it to the expected annual storm frequency We develop a small collection of case studies using commercial-scale CSP tower plants and obtain breakeven frequencies that mostly fall between 0.1 and 1.0 storms per year, depending on the existing fleet size and storm severity.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

How Can Probabilistic Solar Power Forecasts Be Used to Lower Costs and Improve Reliability in Power Spot Markets? A Review and Application to Flexiramp Requirements

Net load uncertainty in electricity spot markets is rapidly growing. There are five general approaches by which system operators and market participants can use probabilistic forecasts of wind, solar, and load to help manage this uncertainty. These include operator situation awareness, resource risk hedging, reserves procurement, definition of contingencies, and explicit stochastic optimization. We review these approaches, and then provide a case study in which a method for using probabilistic solar forecasts to define needs for reserves is developed and evaluated. The case study has three parts. First, we describe building blocks for enhancing the Watt-Sun solar forecasting system to produce probabilistic irradiance and power forecasts. Second, relationships between Watt-Sun forecasts for multiple sites in California and the system's need for flexible ramp capability (flexiramp) are defined by machine learning and statistical methods. Third, the performance of present methods to defining flexiramp requirements, which are not conditioned on weather and renewables forecasts, is compared with that of probabilistic solar forecast-based requirements, using a multi-timescale production costing model with an 1820-bus representation of the WECC power system. Significant potential savings in fuel and flexiramp procurement costs from using solar-informed reserve requirements are found.

14 SOLAR ENERGY↗

The Challenge of Achieving Site Closure of a Complex Groundwater Plume - 20531

Over the last three decades, DOE has made substantial progress in nearly every area of nuclear waste cleanup and has closed and transitioned 91 of the 107 sites in the EM complex. Several of the remaining groundwater plumes at Hanford, Los Alamos, Paducah, Oak Ridge, and Savannah River are complex and tend to have unique site or contaminant characteristics which provide an almost impossible challenge to remediate to regulatory levels. As a result, these complex sites will require a large investment to remediate. In order for DOE to achieve regulatory closure, a technically sound case must be developed and presented to regulators and stakeholders that clearly demonstrates that remedial goals have been or will be irreversibly achieved or that there is an alternate acceptable end-state. Five lines of evidence are required: - A conceptual site model that is as complete as possible, with the knowledge that it may continue to evolve with time; - Demonstration that trends in contaminant concentrations, or flux, versus time indicate that remedial goals will be achieved on schedule or within a reasonable time thereafter and that trends that deviate from this path are explainable by the conceptual model; - Demonstration that remobilization of attenuated contaminants is unlikely to occur in the future; - Explicit consideration of remedial contingencies, should deviations in the path toward remedial goals occur; - Development of an effective long-term monitoring plan to detect any conditions that might alter the path toward remedial goals. SRS has made significant progress in the remediation of contamination associated with the F-area and H-Area Seepage Basins, and it is currently developing a strategic closure path that addresses each of these lines of evidence and identifies both basic and applied scientific issues that will need to be addressed in order to obtain regulatory closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tightest Mixed-Integer Programming Formulations for Quadratic SCUC Optimization

In this project, we developed new, tighter Mixed-Integer Programming (MIP) formulations for the combined Alternating Current (AC) Security-Constrained Unit Commitment (SCUC) and Security-Constrained Optimal Power Flow (SCOPF). The work addresses a critical challenge in power system operations: efficiently determining which generation units to commit and how to optimally dispatch them while maintaining network reliability constraints for both normal and contingency scenarios. Our efforts: 1. Advance the Understanding of SCUC/SCOPF Modeling: By introducing tighter MIP formulations and leveraging cutting-edge optimization tools (Julia/JuMP, PowerModels.jl), this project has pushed forward the state of the art in efficient power systems scheduling. 2. Enhance Technical and Economic Feasibility: The methods developed provide more accurate and potentially faster solutions to large-scale, realistic scheduling and dispatch problems in electric power systems, which can translate into improved reliability and potentially lower costs for grid operations. 3. Benefit to the Public: Greater efficiency in power system operations leads to cost savings for utilities and end-users. Improved reliability and integration of advanced modeling approaches can facilitate the adoption of clean energy resources and better accommodate uncertainties in renewable generation. Because this technology could impact bulk power markets and reliability, these innovations have far-reaching public benefits in terms of cost savings, reliability, and sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimal Network Reconfiguration and Scheduling With Hardware-in-the-Loop Validation for Improved Microgrid Resilience

With the increased occurrence of various major extreme weather events, power outages and prompt power system restorations have recently drawn more attention to the resilience and recovery of power systems. From the perspective of a more resilient power delivery at the distribution grid, system restoration using network topology reconfiguration together with optimal scheduling of distributed energy resources are adopted in this paper. The proposed optimization model aims at minimizing the total load shedding cost and other operational costs, in which linearized topological constraints borrowed from graph theory and linearized DistFlow models are respectively used to maintain the radial network topology and power flow balance after system contingencies. To demonstrate the applicability of the proposed strategy, a real-world case study of a networked three-microgrid system in Adjuntas, Puerto Rico, is used with the consideration of different independent/interconnected microgrid scenarios, contingencies, and fairness settings. Furthermore, hardware-in-the-loop testing is conducted for the same three-microgrid network, where the closely matched results with the simulated ones have validated the effectiveness of the proposed restoration strategy, which is now ready to move one step forward towards field deployment. Finally, to test the proposed restoration strategy in a larger networked system, the modified IEEE-33 bus test distribution system is considered, and the results show a more resilient power delivery for critical loads under three and four line outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data-Driven Unit Commitment Refinement - a Scalable Approach for Complex Modern Power Grids

Integration of renewable generation, which is often intermittent and decentralized, substantially increases the stochasticity and complexity of power grid operations. Future power systems planning will require significant computational capability to evaluate balance between demand and supply under varying conditions, both temporally and spatially. The standard approach for generation unit commitment is to use mixed-integer linear programming to find the optimal generation schedule considering ramping and generator constraints. In the future grid this poses computational scalability challenges because generation and demand are not known with certainty due to stochasticity in weather and complexity of the grid. To address this challenge, we present a data-driven unit commitment approach that can efficiently include stochastic weather impacts and contingency considerations to improve unit commitment. Our approach uses graph-based data analytics techniques on solutions to the security constrained (and possibly stochastic) economic dispatch problem to identify potential improvements to a given unit commitment. Recent breakthroughs in fully-parallel stochastic economic dispatch software allow this approach to be scalably deployed. Simulations on synthetic South Carolina and Texas grids show this method can improve grid reliability with security constraints over a set of contingencies, while also meaningfully lowering total generation cost.

Holt, Timothy↗

Large-scale simulation-based parametric analysis of an optimal precooling strategy for demand flexibility in a commercial office building

Achieving success with grid-interactive efficient buildings (GEBs) is closely tied to the utilization of flexible loads. A valuable strategy involves the implementation of precooling techniques before high-demand events, such as peak hours, by adjusting zone air temperature setpoints. This leads to a reduction in thermal loads and peak electricity demand during these times, as the building’s thermal mass stores and subsequently releases thermal energy. However, the effectiveness of the pre-cooling optimization is highly contingent on specific conditions such as building thermal properties, weather conditions, utility rate structure, HVAC equipment sizing, etc. Therefore, investigating the impacts of these condition-specific factors is crucial, especially when considering precooling strategies that utilize thermal mass in commercial buildings. In this paper, we first devised a novel heuristic control approach that incorporates parameterized optimal precooling thermostat schedules to enhance demand flexibility in a commercial office building. Subsequently, we conducted a thorough performance evaluation of this control strategy. Here, the optimal thermostat schedule was parameterized using three optimization variables: the precooling start time, the precooling end time, and the precooling temperature setpoint. Utilizing the DOE medium-sized office building as the virtual testbed, we showed that the parameterized schedule effectively approximates model predictive control and requires drastically reduced computational overhead. In addition, we investigated the impact of different influencing factors on the optimal precooling strategy. These factors include building thermal mass, outdoor air conditions, and energy price profiles. Using high-performance computing, we simulated a total of 225 scenarios, consisting of three levels of thermal mass, five typical outdoor air temperature profiles, and fifteen time-of-use price plans. The results demonstrate that optimal thermostat scheduling could save substantial energy cost in medium-sized office buildings with heavy thermal mass but with some energy penalty. Although the potential for cost savings is lower in buildings with low and medium thermal mass, the energy penalty remains consistent in all three thermal mass scenarios. The study also highlights the need to account for zone diversity and recognize that a one-size-fits-all-zone setpoint schedule may not be suitable for all zones and can lead to unnecessary energy wastage. Furthermore, the results highlight that while outdoor air conditions play a role in cost and energy performance, the cooling load exerts a more immediate and substantial influence on cost savings in precooling strategies. Although cost savings are comparable under certain conditions with the same cooling load, observed deviations in energy penalty indicate potential disparities in the efficiency of the HVAC system during the load-shifting process. In addition, the duration of peak pricing and the ratio between peak and off-peak times exhibit clear correlations with cost savings and energy consumption, aligning with intuitive expectations. These findings offer valuable insights for optimizing precooling strategies in office buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Analysis and design of DC-link capacitor in cascaded H-bridge multilevel active front-end converter

Medium-voltage grid-tied systems often use a cascaded H-bridge multi-level active front-end. In this converter, dc link bus capacitors play an important role in stabilizing the converter and enabling both active and reactive power injections. The present work provides analytical expressions for the capacitor current, which are essential for optimizing system design (especially capacitor size vs. lifetime). Then, the expression is incorporated into the grid connected bidirectional power system model. Consequently, this work contributes to the guiding principles to choose accurate dc link capacitor ratings against grid-side power delivery requirements. DC-link capacitors come with an expiration date which is dependent on the operating power and voltage values. Lack of information about the lifetime of the dc-link capacitor creates uncertainty in the duration of online operation of the converter, thus increasing the probability of a contingency outage. The lifetime of the capacitor can range from only a few seconds of online operation of the station due to under-sizing, to a compromised quality of power flowing through other solid state devices which may not have been designed for the transients that are caused by over-sizing of the dc-link capacitor. A better estimate of the lifetime of these capacitors can help maximize usage and maintain scheduled outages more efficiently, without disruption in service.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed optimization and control for autonomous distributed energy resource power dispatch and frequency regulation considering communication failures

Distributed energy resources (DERs) can significantly enhance grid flexibility by supplying power and secondary frequency regulation (SFR) services. Yet, their large number and dispersed nature limit the effectiveness of traditional centralized power dispatch and frequency control schemes, and expose the system to single-point communication failures. This paper presents a unified distributed optimization and control framework for DER power dispatch and SFR provision. A transmission-loss-aware distributed direct current optimal power flow is first formulated to optimize DER power dispatch and reserve scheduling. On top of this, a fully distributed control scheme for DER autonomous SFR provision is developed to allocate automatic generation control signals cost-effectively while ensuring robustness to communication link disruptions. The framework is validated on IEEE 14-bus and 39-bus transmission systems with large-scale distribution feeders using transmission-distribution dynamic co-simulation, demonstrating reliable and autonomous DER power dispatch and SFR provision under diverse operating conditions and communication contingencies.

24 POWER TRANSMISSION AND DISTRIBUTION↗