Results for “securely energized and resilient”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

5G Securely Energized and Resilient: Task 2 and 3 Progress Report

The 5G Securely Energized and Resilient project implemented at the National Renewable Energy Laboratory is sponsored by the Office of the Under Secretary of Defense and is designed to demonstrate the successful deployment of 5G-6G (FutureG) technologies in the context of electrical microgrid scenarios. Through implementation of this project, cybersecurity researchers were able to design a platform to better understand the fundamental system architecture, limitations, and benefits of 5G systems supporting energy system requirements. Although the work for this project was developed in the context of “FutureG Advanced Component Development & Prototypes,” which is a U.S. Department of Defense effort to ensure communications system resilience in the context of military deployments, the results can also apply to communications for electrical grids in general. Several key points were established in Tasks 2 and 3 of this project that are further expanded on in the body of this document.

24 POWER TRANSMISSION AND DISTRIBUTION↗

5G Securely Energized and Resilient: (5G-SER) (Final Report)

NREL's work on 5G integration with physical power systems (versus simulated systems demonstrated in task 3) under 5G-Securely Energized and Resilient (5G-SER) achieved a major milestone in with the completion of Task 4 activities. After many months (6+) of planning and development along with scaling challenges along the way, a full 5G end-to-end network with physical hardware components (physical inverter, physical power panel, physical battery, etc.) was deployed in a containerized environment. In parallel, a distributed controls architecture for a microgrid powering 5G resources was also successfully modified from its previous instantiation for a simulated environment to work with these physical components. These accomplishments set the stage to use newly setup 5G technology with physical microgrid components to test the feasibility of 5G wireless with physical systems to enable resilient communications between controls and distributed solar and storage resources while exploring ways to configure 5G components to survive power disturbances. The results detailed in the report below show that even utilizing physical components, 5G wireless systems were able to provide resilient results that were similar to the results from the simulated environment Task 3).

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Security constrained optimal power shutoff for wildfire risk mitigation

Abstract Electric grid faults are increasingly the source of ignition for major wildfires. To reduce the likelihood of such ignitions in high risk situations, utilities use preemptive de‐energization of power lines, commonly referred to as Public Safety Power Shutoffs (PSPS). Besides raising challenging trade‐offs between power outages and wildfire safety, PSPS removes redundancy from the network at a time when component faults are likely to happen. This may leave the network particularly vulnerable to unexpected line faults that may occur while the PSPS is in place. Previous works have not explicitly considered the impacts of these outages. To address this gap, the Security Constrained Optimal Power Shutoff problem is proposed which uses post‐contingency security constraints to model the impact of unexpected line faults when planning a PSPS. This model enables, for the first time, the exploration of a wide range of trade‐offs between both wildfire risk and pre‐ and post‐contingency load shedding when designing PSPS plans, providing useful insights for utilities and policy makers considering different approaches to PSPS. The efficacy of the model is demonstrated using the EPRI 39‐bus system as a case study. The results highlight the potential risks of not considering security constraints when planning PSPS and show that incorporating security constraints into the PSPS design process improves the resilience of current PSPS plans.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SOLAr Critical Infrastructure Energization (SOLACE): Leveraging Distributed Energy Resources to Provide Local Power

This document is a technical report based on a large-scale DOE-funded project conducted between 2019 and 2022. The project, called SOLAr Critical infrastructure Energization (SOLACE), is aimed at leveraging distributed energy resources (DERs) to provide local power to communities, feeders, or other regions. The project included a particular focus on high-value critical loads such as municipal water supply, telecommunication hubs, and disaster shelters. The key developments of the project were: (1) A comprehensive pre-event power system analysis methodology that identifies and characterizes the viable local power options. (2) A DMS-based example control system for activating and operating the local power solution during a time of crisis. (3) Grid-forming inverter technology to enable isolated local power operation and black-starting. (4) Cyber-security considerations for isolated systems when wider-area communication may be offline. This report describes the overall process that identifies and assesses the viable DER-based local power solutions for a given facility, region, or community. The report documents the process, including the key analysis steps, tools required, data requirements, and recommended pass/fail criteria for each step. It also provides a sample implementation of this process through a test case. Finally, it provides details of how a viable pre-event plan can be selected and activated at go-time when an event has occurred.

14 SOLAR ENERGY↗

Distribution System Blackstart and Restoration Using DERs and Dynamically Formed Microgrids

Extreme weather events have led to long-duration outages in the distribution system (DS), necessitating novel approaches to blackstart and restore the system. Existing blackstart solutions utilize blackstart units to establish multiple microgrids (MGs), sequentially energize non-blackstart units, and restore loads. However, these approaches often result in isolated MGs. In DERs-aided blackstart, the continuous operation of these MGs is limited by the finite energy capacity of commonly used blackstart units like battery energy storage (BES)-based gridforming inverters (GFMIs). To address this issue, this article proposes a holistic blackstart and restoration framework that incorporates synchronization between dynamic MGs and the entire DS with the transmission grid (TG). To support synchronization, we leveraged virtual synchronous generator-based control for GFMIs to estimate their frequency response to load pick-up events using only initial/final quasi-steady-state points. Subsequently, a synchronization switching condition is developed to model synchronizing switches, aligning them seamlessly with a linearized branch flow problem. Finally, we designed a bottomup blackstart and restoration framework that considers the switching structure of the DS, energizing/synchronizing switches, DERs with grid-following inverters, and BES-based GFMIs with frequency security constraints. In conclusion, the proposed framework is validated in IEEE-123-bus system, considering cases with two and four GFMIs under various TG recovery instants.

24 POWER TRANSMISSION AND DISTRIBUTION↗