Search NASA⌕ Search

SEARCH · Search NASA

Results for “service placement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

An Approach to Reasoning Service Migration in Data and Reasoning Fabric (DRF) Implementation

In this paper we consider service placement problem for Data and Reasoning Fabric (DRF) enabled airspace operations assuming a fixed cloud/edge infrastructure with allocated computing, storage and power resources, where cloud/edge servers, and communication stations are in a wired connected network, while vehicles use a wireless network for communication. The objective is to automatically select the best location for the requested service execution, which achieves minimum cost while satisfying the user quality of service (QoS) and available resources constraints. To this end, we estimate for each potential location the response time, consumed energy and total cost; formulate an optimization problem for cost minimization given the users QoS constraints and network infrastructure limitations; and solve it using nonlinear programming tools. The approach is applied to trajectory re-planning use case to handle a no-fly zone contingency in real time.

Vahram Stepanyan↗

Teleoperator maneuvering system

The Teleoperator Maneuvering System (TMS) is a Shuttle launched, free-flying, remotely controlled reusable propulsive stage capable of performing spacecraft and payload placement services, retrieval functions, assembly/servicing support for large space systems, dexterous manipulator operations for planned or contingency satellite servicing, satellite viewing, and subsatellite science support. The basic TMS segments, subsystems and performance are described, beginning with the criteria and requirements derived from mission models. Examples of TMS benefits to the STS and user communities are demonstrated. TMS applications such as support and servicing of Space Station, materials processing and subsatellite missions are presented.

Turner, J. R.↗

Geosynchronous platform definition study. Volume 7: Geosynchronous transporation requirements

The analyses and trade studies are presented which were conducted to define the interfaces between geosynchronous platforms and the space transportation system. Mission timelines are synthesized for both manned and unmanned placement and servicing operations. Physical, operational, and functional interfaces between platforms and the space shuttle and tug are derived from the timelines. Where interface incompatibilities exist, alternate approaches are evaluated and a preferred approach is defined. An evaluation of the adaptation of the solar electric propulsion (SEP) stage for geosynchronous operations is presented. A comparison of geosynchronous platform programs with and without the SEP stage in the transportation system is developed.

Myers, H. L.↗

Teleoperator maneuvering system

The teleoperator maneuvering system (TMS), consisting of the vehicle, the shuttle orbiter bay cradle with airborne support equipment, and the aft flight deck control station, is described. The vehicle is a reusable remotely controlled free flying vehicle capable of a variety of missions including payload placement, retrieval, servicing, viewing, and large space systems assembly support. The TMS flies preprogrammed trajectories as well as being controlled or reprogrammed from the aft flight deck or the ground. A building block design philosophy is described which permits the evolution of capability as it is needed and delays cost as much as possible. Various mission operations are discussed.

Turner, J. R.↗

Space station needs, attributes, and architectural options study

The top level, time-phased total space program support system architecture is described including progress from the use of ground-based space shuttle, teleoperator system, extended duration orbiter, and multimission spacecraft, to an initial 4-man crew station at 29 deg inclination in 1991, to a growth station with an 8-man crew with capabilities for OTV high energy orbit payload placement and servicing, assembly, and construction of mission payloads in 1994. System Z, proposed for Earth observation missions in high inclination orbit, can be accommodated in 1993 using a space station derivative platform. Mission definition, system architecture, and benefits are discussed.

Source record↗

Space Station needs, attributes and architectural options: Summary briefing

Computerized data sorting and analysis techniques were used with a data base accumulated in over 20 years of space station studies to evaluate candidate missions and select a final model of 88 missions. The social, cultural, scientific, technical, and commercial benefits to be accrued from each mission were identified. Requirements were determined for satellite servicing; payload placement and retrieval; refueling; repair; testing; assembly; and construction. Missions drivers determined include crew, remote manipulating system, external parts, instrumentation, extravehicular activity/manned maneuvering unit, and voice/video equipment. User interest for commercial applications were determined. Variable architecture based on a modular concept with multi-use elements is proposed.

Source record↗

Crew Transfer Options for Servicing of Geostationary Satellites

In 2011, NASA and DARPA undertook a study to examine capabilities and system architecture options which could be used to provide manned servicing of satellites in Geostationary Earth Orbit (GEO). The study focused on understanding the generic nature of the problem and examining technology requirements, it was not for the purpose of proposing or justifying particular solutions. A portion of this study focused on assessing possible capabilities to efficiently transfer crew between Earth, Low Earth Orbit (LEO), and GEO satellite servicing locations. This report summarizes the crew transfer aspects of manned GEO satellite servicing. Direct placement of crew via capsule vehicles was compared to concepts of operation which divided crew transfer into multiple legs, first between earth and LEO and second between LEO and GEO. In space maneuvering via purely propulsive means was compared to in-space maneuvering which utilized aerobraking maneuvers for return to LEO from GEO. LEO waypoint locations such as equatorial, Kennedy Space Center, and International Space Station inclinations were compared. A discussion of operational concepts is followed by a discussion of appropriate areas for technology development.

Cerro, Jeffrey A.↗

Follow-on programs.

Discussion of space activities planned for the 1980's and resulting from the use of the Space Shuttle in providing easy access to orbits around the earth. Illustrations and brief explanatory notes describe the uses of the Space Shuttle in supporting space lab operations; retrieval and delivery of propulsion stages; placement, repair, and service of satellites; transportation of passengers and crews; execution of short-duration orbital missions; and rescue of endangered personnel.

Culbertson, P. E.↗

Development of concepts for satellite retrieval devices

The teleoperator being developed to augment the Space Transportation System (STS) for satellite placement, retrieval, or servicing at altitudes or orbital planes where it would be impractical to use the shuttle is primarily a general purpose propulsion stage that can be fitted with manipulator arms, automated servicers and satellite retrieval devices for particular missions. Design concepts for a general purpose retrieval device for docking with a satellite to which a grappling fixture has been attached, and for a retrieval device for docking with the Solar Maximum Mission (SMM) spacecraft were defined. The mechanical aspects of these two devices are discussed as well as the crew operations involved and problems created by the requirement for remote control. Drawings for the two retrieval device concepts are included.

Pruett, E. C.↗

System requirements

Requirements of future space systems, including large space systems, that operate beyond the space shuttle are discussed. Typical functions required of propulsion systems in this operational regime include payload placement, retrieval, observation, servicing, space debris control and support to large space systems. These functional requirements are discussed in conjunction with two classes of propulsion systems: (1) primary or orbit transfer vehicle (OTV) and (2) secondary or systems that generally operate within or relatively near an operational base orbit. Three propulsion system types are described in relation to these requirements: cryogenic OTV, teleoperator maneuvering system and a solar electric OTV.

Austin, R. E.↗

The International Space Station Habitat

The International Space Station (ISS) is an engineering project unlike any other. The vehicle is inhabited and operational as construction goes on. The habitability resources available to the crew are the crew sleep quarters, the galley, the waste and hygiene compartment, and exercise equipment. These items are mainly in the Russian Service Module and their placement is awkward for the crew to deal with ISS assembly will continue with the truss build and the addition of International Partner Laboratories. Also, Node 2 and 3 will be added. The Node 2 module will provide additional stowage volume and room for more crew sleep quarters. The Node 3 module will provide additional Environmental Control and Life Support Capability. The purpose of the ISS is to perform research and a major area of emphasis is the effects of long duration space flight on humans, a result of this research they will determine what are the habitability requirements for long duration space flight.

Watson, Patricia Mendoza↗

Kinematic study of flight telerobotic servicer configuration issues

Several factors, such as body size and shape, and the number of arms and their placement, will influence how well the Flight Telerobotic Servicer (FTS) is suited to its potential duties for the Space Station Program. In order to examine the implications of these configuration options, eight specific 2, 3, and 4 armed FTS configuration were simulated and used to perform a Space Station Orbital Replacement Unit (ORU) exchange. The strengths and weaknesses of each configuration were evaluated. Although most of the configurations examined were able to perform the exchange, several of the 3 and 4 arm configurations had operational advantages. The results obtained form these simulations are specific to the assumptions associated with the ORU exchange scenario examined. However, they do illustrate the general interrelationships and sensitivities which need to be understood.

Lewis, R. H.↗

ITOS/space shuttle study

The results are reported of a study to explore the potential cost reductions in the operational ITOS weather satellite program as a consequence of shuttle/bug availability for satellite placement and retrieval, and satellite servicing and maintenance. The study program was divided into shuttle impact on equipment and testing costs, and shuttle impact on overall future ITOS operational program costs, and shuttle impact on configuration. It is concluded that savings in recurring spacecraft costs can be realized in the 1978 ITOS program, if a space shuttle is utilized.

Source record↗

NPSS on NASA's IPG: Using CORBA and Globus to Coordinate Multidisciplinary Aeroscience Applications

Within NASA's High Performance Computing and Communication (HPCC) program, the NASA Glenn Research Center is developing an environment for the analysis/design of aircraft engines called the Numerical Propulsion System Simulation (NPSS). The vision for NPSS is to create a "numerical test cell" enabling full engine simulations overnight on cost-effective computing platforms. To this end, NPSS integrates multiple disciplines such as aerodynamics, structures, and heat transfer and supports "numerical zooming" between O-dimensional to 1-, 2-, and 3-dimensional component engine codes. In order to facilitate the timely and cost-effective capture of complex physical processes, NPSS uses object-oriented technologies such as C++ objects to encapsulate individual engine components and CORBA ORBs for object communication and deployment across heterogeneous computing platforms. Recently, the HPCC program has initiated a concept called the Information Power Grid (IPG), a virtual computing environment that integrates computers and other resources at different sites. IPG implements a range of Grid services such as resource discovery, scheduling, security, instrumentation, and data access, many of which are provided by the Globus toolkit. IPG facilities have the potential to benefit NPSS considerably. For example, NPSS should in principle be able to use Grid services to discover dynamically and then co-schedule the resources required for a particular engine simulation, rather than relying on manual placement of ORBs as at present. Grid services can also be used to initiate simulation components on parallel computers (MPPs) and to address inter-site security issues that currently hinder the coupling of components across multiple sites. These considerations led NASA Glenn and Globus project personnel to formulate a collaborative project designed to evaluate whether and how benefits such as those just listed can be achieved in practice. This project involves firstly development of the basic techniques required to achieve co-existence of commodity object technologies and Grid technologies; and secondly the evaluation of these techniques in the context of NPSS-oriented challenge problems. The work on basic techniques seeks to understand how "commodity" technologies (CORBA, DCOM, Excel, etc.) can be used in concert with specialized "Grid" technologies (for security, MPP scheduling, etc.). In principle, this coordinated use should be straightforward because of the Globus and IPG philosophy of providing low-level Grid mechanisms that can be used to implement a wide variety of application-level programming models. (Globus technologies have previously been used to implement Grid-enabled message-passing libraries, collaborative environments, and parameter study tools, among others.) Results obtained to date are encouraging: we have successfully demonstrated a CORBA to Globus resource manager gateway that allows the use of CORBA RPCs to control submission and execution of programs on workstations and MPPs; a gateway from the CORBA Trader service to the Grid information service; and a preliminary integration of CORBA and Grid security mechanisms. The two challenge problems that we consider are the following: 1) Desktop-controlled parameter study. Here, an Excel spreadsheet is used to define and control a CFD parameter study, via a CORBA interface to a high throughput broker that runs individual cases on different IPG resources. 2) Aviation safety. Here, about 100 near real time jobs running NPSS need to be submitted, run and data returned in near real time. Evaluation will address such issues as time to port, execution time, potential scalability of simulation, and reliability of resources. The full paper will present the following information: 1. A detailed analysis of the requirements that NPSS applications place on IPG. 2. A description of the techniques used to meet these requirements via the coordinated use of CORBA and Globus. 3. A description of results obtained to date in the first two challenge problems.

Lopez, Isaac↗

A Versatile Lifting Device for Lunar Surface Payload Handling, Inspection and Regolith Transport Operations

Devices for lifting and transporting payloads and material are critical for efficient Earth-based construction operations. Devices with similar functionality will be needed to support lunar-outpost construction, servicing, inspection, regolith excavation, grading and payload placement. Past studies have proposed that only a few carefully selected devices are required for a lunar outpost. One particular set of operations involves lifting and manipulating payloads in the 100 kg to 3,000 kg range, which are too large or massive to be handled by unassisted astronauts. This paper will review historical devices used for payload handling in space and on earth to derive a set of desirable features for a device that can be used on planetary surfaces. Next, an innovative concept for a lifting device is introduced, which includes many of the desirable features. The versatility of the device is discussed, including its application to lander unloading, servicing, inspection, regolith excavation and site preparation. Approximate rules, which can be used to size the device for specific payload mass and reach requirements, are provided. Finally, details of a test-bed implementation of the innovative concept, which will be used to validate the structural design and develop operational procedures, is provided.

Doggett, William R.↗

Space station

The Space Station is being defined as a multi-purpose facility with emphasis in the following areas: scientific and technology research laboratory; permanent observatory; spacecraft servicing facility; construction and assembly facility; manufacturing facility; transportation node; and staging base for future space endeavors. The Station complex, in its initial operating capability configuration, includes a continuously habitable manned element, a polar orbiting unmanned platform, and a second unmanned platform co-orbiting with the manned element. All elements are dependent on the Space Transportation System (STS) for initial placement on-orbit and for subsequent logistical services. The manned element will be designed for long duration operations with systems maintainable on-orbit and operationally autonomous from ground control. A major feature of the Station will be its adaptability to evolutionary technology upgrades; and the Space Station, as a system, is to be designed for maximum ease of use by its users.

Thompson, D. R.↗

Space manufacturing systems and the Space Operations Center

For the planned Space Operations Center (SOC) and envisioned space manufacturing and processes systems, the concepts of phased programs, development and operations, station-keeping orbit envelopes, propulsive harbor tugs, and aspects of servicing are discussed. The SOC three-phased program concept includes the servicing of satellites in compatible orbits and in transition to higher energy orbits. Two concepts of a free-flyer satellite are assessed, including the fuel system, and the placement of such a satellite into orbit is discussed. Finally, some services that will be provided by SOC are mentioned.

Louviere, A. J.↗

Solar Terrestrial Observatory Space Station Workshop Report

In response to a need to develop and document requirements of the Solar Terrestrial Observatory at an early time, a mini-workshop was organized and held on June 6, 1985. The participants at this workshop set as their goal the preliminary definition of the following areas: (1) instrument descriptions; (2) placement of instrumentation on the IOC Space Station; (3) servicing and repair assessment; and (4) operational scenarios. This report provides a synopsis of the results of that workshop.

Roberts, W. T.↗