Search NASA⌕ Search

SEARCH · Search NASA

Results for “setback constraints”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Separation and Conditioning of Mars Atmospheric Gases via TSA

Space and planetary exploration almost always presents interesting and unusual engineering challenges. Separations engineering for chemical processes that are critical to humans working in space is no exception. The challenges are becoming clearer as we make the transition from concepts and planning to hardware development, and as we understand better the constraints and environments in which the processes must perform. The coming decade will see a robotic Mars exploration program that has recovered from recent setbacks and is building a knowledge and technology base for human exploration. One of the missions will carry a small chemical pilot plant for demonstrating the manufacture of rocket propellants and life support consumables from the low-pressure (0.01 atm) Martian atmosphere. By manufacturing and storing the fuel and consumables needed for human-return missions in situ, launch mass and landed mass are reduced by tons and missions become far less expensive. The front-end to the pilot plant is a solid-state atmosphere acquisition and separation unit based on temperature-swing adsorption (TSA). The unit produces purified and pressurized (to 1.0 atm) carbon dioxide to downstream reactors that will make methane and oxygen. The unit also produces a nitrogen-argon mixture as a valuable by-product for life support, inflatable structures, and propellant pressurization. With nighttime temperatures falling to -100 degrees C, power availability restricted to a few watts, and flawless operation critical to success, the dusty Martian surface is a difficult place to operate a remote plant. This talk will focus on how this TSA separation process is designed and implemented for this application, and how it might be used in the more distant future for human exploration.

Finn, John E.↗

Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew T.↗

Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility

The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

Webb, Andrew↗