Search NASA⌕ Search

SEARCH · Search NASA

Results for “simulation test bed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

What can simulation test beds teach us about social science? Results of the ground truth program

The ground truth program used simulations as test beds for social science research methods. The simulations had known ground truth and were capable of producing large amounts of data. This allowed research teams to run experiments and ask questions of these simulations similar to social scientists studying real-world systems, and enabled robust evaluation of their causal inference, prediction, and prescription capabilities. We tested three hypotheses about research effectiveness using data from the ground truth program, specifically looking at the influence of complexity, causal understanding, and data collection on performance. We found some evidence that system complexity and causal understanding influenced research performance, but no evidence that data availability contributed. The ground truth program may be the first robust coupling of simulation test beds with an experimental framework capable of teasing out factors that determine the success of social science research.

97 MATHEMATICS AND COMPUTING↗

A high-fidelity building performance simulation test bed for the development and evaluation of advanced controls

We present an open-source building performance simulation test bed, the Advanced Controls Test Bed (ACTB), that interfaces high-fidelity Spawn of EnergyPlus building models, with advanced controllers implemented in Python. Additionally, the ACTB leverages the Building Optimization Testing and Alfalfa platforms for managing simulations, providing an external clock, a representational state transfer (REST) application programming interface (API), and key performance indicators for evaluating the effectiveness of control strategies. The REST API allows the development of external controllers programmed in languages such as Python, which provides flexibility and a rich choice of scientific libraries for designing control sequences. We present three test cases based on the U.S. Department of Energy's Reference Small Office Building to demonstrate the ACTB's capabilities: (a) rule-based controls compliant with ASHRAE Guideline 36 control sequences; (b) an economic model predictive control implemented using do-mpc; and (c) a deep Q-network reinforcement learning agent implemented using OpenAI Gym.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development and refinement of test bed simulations

Lewis Research Center of NASA, with support from Rocketdyne, was engaged in non-real time computer simulation effort for the Space Station Freedom Electric Power System (EPS) EASY5, a simulation package, is used as the primary tool for this activity. Early in the design of the EPS, two test beds were set up at Lewis. The Integrated Test Bed (ITB), that combines and upgrades these test beds, is in the planning stage. The test beds are designed to functionally represent many of the components of the EPS and their interconnections. The simulation effort is primarily directed towards these test beds. Model verification is performed using test bed data.

Dravid, Narayan V.↗

Development and refinement of test bed simulations

Lewis Research Center of NASA, with support from Rocketdyne, has engaged in a nonreal-time computer simulation effort for the Space Station Freedom Electric Power System (EPS). EASYS, a simulation package, is used as the primary tool for this activity. Early in the design of the EPS, two test beds were set up at Lewis. The Integrated Test Bed (ITB) that combines and upgrades these test beds is in the planning stage. The test beds are designed to functionally represent many of the components of the EPS and their interconnections. The simulation effort is primarily directed towards these test beds. Model verification is performed using test bed data.

Dravid, N. V.↗

Simulation test beds for the space station electrical power system

NASA Lewis Research Center and its prime contractor are responsible for developing the electrical power system on the space station. The power system will be controlled by a network of distributed processors. Control software will be verified, validated, and tested in hardware and software test beds. Current plans for the software test bed involve using real time and nonreal time simulations of the power system. This paper will discuss the general simulation objectives and configurations, control architecture, interfaces between simulator and controls, types of tests, and facility configurations.

Sadler, Gerald G.↗

Simulation test beds for the Space Station electrical power system

NASA Lewis Research Center and its prime contractor are respnsible for developing the electrical power system on the Space Station. The power system will be controlled by a network of distributed processors. Control software will be verified, validated, and tested in hardware and software test beds. Current plans for the software test bed involve using real time and nonreal time simulations of the power system. This paper will discuss the general simulation objectives and configurations, control architecture, interfaces between simulator and controls, types of tests, and facility configurations.

Sadler, Gerald G.↗

Challenges of the Cassini Test Bed Simulating the Saturnian Environment

The Cassini-Huygens mission is a joint NASA and European Space Agency (ESA) mission to collect scientific data of the Saturnian system and is managed by the Jet Propulsion Laboratory (JPL). After having arrived in Saturn orbit and releasing the ESA's Huygens probe for a highly successful descent and landing mission on Saturn's moon Titan, the Cassini orbiter continues on its tour of Saturn, its satellites, and the Saturnian environment. JPL's Cassini Integrated Test laboratory (ITL) is a dedicated high fidelity test bed that verifies and validates command sequences and flight software before upload to the Cassini spacecraft. The ITL provides artificial stimuli that allow a highly accurate hardware-in-the-loop test bed model that tests the operation of the Cassini spacecraft on the ground. This enables accurate prediction and recreation of mission events and flight software and hardware behavior. As we discovered more about the Saturnian environment, a combination of creative test methods and simulation changes were necessary to simulate the harmful effect that the optical and physical environment has on the pointing performance of Cassini. This paper presents the challenges experienced and overcome in that endeavor to simulate and test the post Saturn Orbit Insertion (SOI) and Probe Relay tour phase of the Cassini mission.

Titan atmospheric drag↗

Control Law-Control Allocation Interaction: F/A-18 PA Simulation Test - Bed

This report documents the first stage of research into Control Law - Control Allocation Interactions. A three-year research effort was originally proposed: 1. Create a desktop flight simulation environment under which experiments related to the open questions may be conducted. 2. Conduct research to determine which aspects of control allocation have impact upon control law design that merits further research. 3. Conduct research into those aspects of control allocation identified above, and their impacts upon control law design. Simulation code was written utilizing the F/A-18 airframe in the power approach (PA) configuration. A dynamic inversion control law was implemented and used to drive a state-of-the-art control allocation subroutine.

Durham, Wayne↗

The Ground Truth Program: Simulations as Test Beds for Social Science Research Methods.

Social systems are uniquely complex and difficult to study, but understanding them is vital to solving the world’s problems. The Ground Truth program developed a new way of testing the research methods that attempt to understand and leverage the Human Domain and its associated complexities. The program developed simulations of social systems as virtual world test beds. Not only were these simulations able to produce data on future states of the system under various circumstances and scenarios, but their causal ground truth was also explicitly known. Research teams studied these virtual worlds, facilitating deep validation of causal inference, prediction, and prescription methods. The Ground Truth program model provides a way to test and validate research methods to an extent previously impossible, and to study the intricacies and interactions of different components of research.

97 MATHEMATICS AND COMPUTING↗

Parallel-Processing Test Bed For Simulation Software

Second-generation Hypercluster computing system is multiprocessor test bed for research on parallel algorithms for simulation in fluid dynamics, electromagnetics, chemistry, and other fields with large computational requirements but relatively low input/output requirements. Built from standard, off-shelf hardware readily upgraded as improved technology becomes available. System used for experiments with such parallel-processing concepts as message-passing algorithms, debugging software tools, and computational steering. First-generation Hypercluster system described in "Hypercluster Parallel Processor" (LEW-15283).

Blech, Richard↗

R and DE Robotic Sensor Intern Team: Sensor Suite Mock Up Testing

Assess sensor suite performance: - Mounted on crawler typical to what would be used in tunnel; - In test bed simulating the tunnel environment. The SuperDroid fiber tethered LT-F crawler is a general-purpose surveillance robot that our team has refurbished as a testing platform for the sensor suite. This crawler was selected because its dimensions are similar to the actual crawler that will be deployed in the field. Crawler preparation included: - Communicating with vendor to resolve software and platform issues; - Configuring a laptop with the crawler control software; - Reconfiguration of communication protocol between computer and crawler; - Resolution of control board checksum errors; - Installation of a mounting fixture on the base; - In progress: addition of lighting needed for total darkness. A solution for hosting the selected sensors onto a single unit that could function standalone or be mounted on the crawler was needed. Sensor mount requirements included: - Host Lidar, panospheric cameras and IMU sensors; - Cable management for rotating Lidar; - House on-board crawler computer; - Method for affixing to crawler; - Robust and vibration proof. The Lidar sensor required a sturdy mount that ensured the axis of rotation be centered with the LiDAR's desired laser path and included a slender profile in order to not block the scanning FOV. The mounting plate holds two 180-degree cameras on either side and the servo on the center. The servo mount is located so the axis of rotation is in the center of the plate. The mount features a set of guides that hold the wires and ensure they wrap around the spool area properly. The sensor box design features thick walls for added strength, holes for mounting the sensor suite to the crawler, notches on the bottom for the different components and holes for cable routing and management. The sensor mounts were designed using CREO and printed in the R and DE Additive Manufacturing Lab. To test the performance of the sensor suite for our application it was desired to design and build a test bed simulating the H-Canyon tunnel environment. Requirements included: - Dimensions similar to the tunnel; - Wall surfaces simulating the eroded tunnel walls; - Complete darkness; - Even and uneven crawler path; - Ability to change the tunnel width to simulate erosion. The HCAEX tunnel changes in height and includes several bends ranging from approximately 30 to 80 degrees, for that reason a test bed capable of easily being changed was needed. The final design includes two sections that can be connected to provide a 16' tunnel or placed at an angle to create a tunnel bend. The test bed features caster wheels for easy movement and has a sliding inner wall that enables tunnel width to be controlled. In order to simulate the tunnel walls without adding a lot of weight to the test bed, sheets of faux stone are to be used on the inner walls. To create a completely dark tunnel, 100% black-out film will be draped over the tunnel structure. Carpet remnants in the lab will enable folds to be introduced in the floor to generate uneven surface data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A simulation-based test bed for data-association algorithms

A modular All-Source System-evaluation Test bed (ASSET) designed and developed for aiding in the testing and evaluation of advanced data-acquisition algorithms is described, with focus placed on the problem of integrating surveillance information in supporting command decision making. The evaluation procedure employed is based on a measure of the distance between a baseline representation and the representation produced by the association algorithm at some time instant. Choices for the baseline representation are presented, and scores are defined between these baselines and an algorithm representation. The test-bed architecture implementing the evaluation procedure is described, and sample outputs from performing algorithm evaluations in the test bed are outlined.

Brown, Donald E.↗

Functional evaluation of the Galileo attitude and articulation control subsystem using FUNSIM

The functional performance of the Galileo spacecraft's attitude and articulation control subsystem is evaluated. The tests are performed utilizing the simulation program developed on an IBM 370 system known as the Functional Simulation (FUNSIM). FUNSIM is an entirely software-based simulation which uses the actual flight software in HAL/S and simulated spacecraft dynamics in FORTRAN language. A description of how the test cases were selected to verify that the algorithms perform functionally correctly, and a summary of the problems encountered are included in the paper. The benefits of having an alternative test bed such as FUNSIM to the real-time simulation test beds which utilize the spacecraft hardware components in discovering the problems are described. A sample test case which shows that the desired tasks were performed functionally correctly is included in the paper. The commands in this test are selected to start the dual-spin spacecraft initially in launch mode and lead it all the way to inertial mode. Major attitude control algorithms such as rotor and platform attitude estimators, clock and core platform attitude estimators, clock and core platform controllers, and the command turn and burn are examined.

Namiri, M. K.↗

The Space Station Module Power Management and Distribution automation test bed

The Space Station Module Power Management And Distribution (SSM/PMAD) automation test bed project was begun at NASA/Marshall Space Flight Center (MSFC) in the mid-1980s to develop an autonomous, user-supportive power management and distribution test bed simulating the Space Station Freedom Hab/Lab modules. As the test bed has matured, many new technologies and projects have been added. The author focuses on three primary areas. The first area is the overall accomplishments of the test bed itself. These include a much-improved user interface, a more efficient expert system scheduler, improved communication among the three expert systems, and initial work on adding intermediate levels of autonomy. The second area is the addition of a more realistic power source to the SSM/PMAD test bed; this project is called the Large Autonomous Spacecraft Electrical Power System (LASEPS). The third area is the completion of a virtual link between the SSM/PMAD test bed at MSFC and the Autonomous Power Expert at Lewis Research Center.

Lollar, Louis F.↗

The SSM/PMAD automated test bed project

The Space Station Module/Power Management and Distribution (SSM/PMAD) autonomous subsystem project was initiated in 1984. The project's goal has been to design and develop an autonomous, user-supportive PMAD test bed simulating the SSF Hab/Lab module(s). An eighteen kilowatt SSM/PMAD test bed model with a high degree of automated operation has been developed. This advanced automation test bed contains three expert/knowledge based systems that interact with one another and with other more conventional software residing in up to eight distributed 386-based microcomputers to perform the necessary tasks of real-time and near real-time load scheduling, dynamic load prioritizing, and fault detection, isolation, and recovery (FDIR).

Lollar, Louis F.↗

A Test Bed for Self-regulating Distribution Systems: Modeling Intergrated Renewable Energy and Demand Response in the GridLAB-D/MATLAB Environment

This paper discusses the development of a simulation test bed permitting the study of integrated renewable energy generators and controlled distributed heat pumps operating within distribution systems. The test bed is demonstrated in this paper by addressing the important issue of the self-regulating effect of consumer-owned air-source heat pumps on the variability induced by wind power integration, particularly when coupled with increased access to demand response realized through a centralized load control strategy.

Wang, Dan↗