Logistics support for launch site operations
Logistics support for Kennedy Space Center launch site operations
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Logistics support for Kennedy Space Center launch site operations
The criteria for cargo handling at the operational site of space shuttles are presented, based on assumed program requirements. The concepts for the following functions are described: maintenance and checkout facility, transfer to launch pad, and launch pad. The requirements for the ground equipment are given along with the general sequences for cargo loading.
A comparison was made between the methods of access utilized, or proposed, by the military, commercial airlines, and the space shuttle Phase B contractors. The methodology was subjected to consideration for space shuttle use and similarity to current space shuttle access concepts. The Phase B contractor concepts were in turn examined for degree of use of the state-of-the-art and progressive extension of new cost-effective ideas. This comparison disclosed a need for better definition of the criteria/requirements for space shuttle access equipment. Preliminary criteria, needed prior to initiation of the detail design (Phase C/D effort) of ground hardware for the operational site, are presented.
The effects of prelaunch assembly, testing, and integration activities on the scientific payload at the KSC are examined. The functions of the Shuttle and payload organizations of the KSC are discussed. The processing of the various types of pyaloads, and the amount of access to the payload during processing and after landing are described. The KSC facility contains: an Operations and Checkout Building, a Vertical Processing Facility, Cargo Integration and Test Equipment, an Orbiter Processing Facility, a Payload Changeout Room, payload transportation equipment, and Shuttle launch pads.
This paper examines the experiences of recent actual planetary payload procesing flows. The emphasis is on the processing of the Galileo spacecraft; however, the paper also addresses the Magellan and Ulysses programs to a lesser extent. An overview of the payload processing activity at the Kennedy Space Center is provided. A 'case study' narrative approach is applied to the Space Shuttle flight STS-34 Galileo processing, and some recommendations based on these operations are presented.
The Mars Global Surveyor (MGS) Mars Orbiter Laser Altimeter (MOLA) global dataset has ushered in a new era for Mars local and global geodesy and cartography. These data include the global digital terrain model (Digital Terrain Model (DTM) radii), the global digital elevation model (Digital Elevation Model (DEM) elevation with respect to the geoid), and the higher spatial resolution individual MOLA ground tracks. Currently there are about 500,000,000 MOLA points and this number continues to grow as MOLA continues successful operations in orbit about Mars, the combined processing of radiometric X-band Doppler and ranging tracking of MGS together with millions of MOLA orbital crossover points has produced global geodetic and cartographic control having a spatial (latitude/longitude) accuracy of a few meters and a topographic accuracy of less than 1 meter. This means that the position of an individual MOLA point with respect to the center-of-mass of Mars is know to an absolute accuracy of a few meters. The positional accuracy of this point in inertial space over time is controlled by the spin rate uncertainty of Mars which is less than 1 km over 10 years that will be improved significantly with the next landed mission.
NASA, military, and commercial satellite users need launch services that are highly reliable, less complex, easier to test, and cost effective. This project has developed a tapered optical fiber sensor for detecting hydrogen. The invention involves incorporating chemical indicators on the tapered end of an optical fiber using organically modified silicate nanomaterials. The Hazardous Gas Detection Lab (HGDL) at Kennedy Space Center is involved in the design and development of instrumentation that can detect and qualify various mission-critical chemicals. Historically, hydrogen, helium, nitrogen, oxygen, and argon are the first five gases of HGDL focus. The use of these cryogenic fluids in the area of propulsion offers challenges. Due to their extreme low temperatures, these fluids induce contraction of the materials they contact, a potential cause of leakage. Among them, hydrogen is of particular concern. Small sensors are needed in multiple locations without adding to the structural weight. The most vulnerable parts of the engine are the connection flanges on the transfer lines, which have to support cycles of large thermal amplitude. The thermal protection of the engine provides a closed area, increasing the likelihood of an explosive atmosphere. Thus, even a small leak represents an unacceptable hazardous condition during loading operations, in flight, or after an aborted launch. Tapered fibers were first fabricated from 1/1.3-mm core/cladding (silica/ plastic) optical fibers. Typically a 1-ft (approx. 30- cm) section of the 1-mm fiber is cut from the bundle and marked with a pen into five 2-.-in. (.5.7-cm) sections. A propane torch is applied at every alternate mark to burn the jacket and soften the glass core. While the core is softening, the two ends of the fiber are pulled apart slowly to create fine tapers of .- to .-in. (.6- to 12-mm) long on the 1-mm optical fiber. Following this, the non-tapered ends of the fibers are polished to a 0.3-micron finish. Then these fibers were coated with indicators sensitive to hydrogen. The tapered hydrogen detection system with its unique flexibility is the only system that can be placed in many locations inside the vehicles and detect the exact location of leaks, saving millions of dollars for launch vehicle industries.
Fog and inland-penetrating sea-breezes occur often at SRS and have a strong impact on site operations. Site personnel therefore require accurate forecasts of these events, but both are difficult to forecast using traditional techniques. Our goal is to apply machine learning (ML) techniques to the problem of forecasting fog and the sea breeze at the Savannah River Site. We apply several such techniques - decision trees, regression, and a series of classification/regression techniques – and train them using the large datasets collected by our group at SRS and from external organizations that maintain databases of regional meteorological variables.
Battery sizing and siting problems are computationally challenging due to the need to make long-term planning decisions that are cognizant of short-term operational decisions. This paper considers sizing, siting, and operating batteries in a power grid to maximize their benefits, including price arbitrage and load shed mitigation, during both normal operations and periods with high wildfire ignition risk. Here we formulate a multi-scenario optimization problem for long duration battery storage while considering the possibility of load shedding during Public Safety Power Shutoff (PSPS) events that de-energize lines to mitigate severe wildfire ignition risk. To enable a computationally scalable solution of this problem with many scenarios of wildfire risk and power injection variability, we develop a customized temporal decomposition method based on a progressive hedging framework. Extending traditional progressive hedging techniques, we consider coupling in both placement variables across all scenarios and state-of-charge variables at temporal boundaries. This enforces consistency across scenarios while enabling parallel computations despite both spatial and temporal coupling. The proposed decomposition facilitates efficient and scalable modeling of a full year of hourly operational decisions to inform the sizing and siting of batteries. With this decomposition, we model a year of hourly operational decisions to inform optimal battery placement for a 240-bus WECC model in under 70 min of wall-clock time.
Several design/development and operational approaches for STS upper stages are being pursued to realize maximum operational and economic benefits upon the introduction of the STS in the 1980s. The paper focuses special attention on safety operations, launch site operations and on-orbit operations.
The Deep Space Network (DSN) comprises three sites, located in California, Spain, and Australia; each site operates one 70m and multiple 34m antennas that provide communications and navigation services to NASA and international partners. As part of a multiyear upgrade in automation of the network, the DSN has undertaken a series of operations efficiency improvements which has fundamentally changed the operations paradigm of the network. At the start of this effort, each site operated only their local antennas and equipment 24 hours/day, 7 days/week, and each spacecraft activity (link) had a single dedicated Link Control Operator. In its final stage, realized in 2020, each one of the three sites operates the entire network during their local day shift, handing off control to the next site as their day ends, and tracks can be run in a fully automated manner with no operator intervention. This paradigm change has realized significant operations cost savings, but has posed some major challenges along the way. This paper describes the system changes that enabled the operations efficiency improvements, some the challenges, and plans for the future.
This attachment expands on the general description of the Nevada National Security Site (NNSS) presented in the Introduction to the Nevada National Security Site Environmental Report 2019. Included are subsections that summarize the site’s geological, hydrological, climatological, and ecological settings and the cultural resources of the NNSS. The subsections are meant to aid the reader in understanding the complex physical and biological environment of the NNSS. An adequate knowledge of the site’s environment is necessary to assess the environmental impacts of new projects, design and implement environmental monitoring activities for current site operations, and assess the impacts of site operations on the public residing in the vicinity of the NNSS. The NNSS environment contributes to several key features of the site that afford protection to the inhabitants of adjacent areas from potential exposure to radioactivity or other contaminants resulting from NNSS operations. These key features include the general remote location of the NNSS, restricted access, extended wind transport times, the great depths to slow-moving groundwater, little or no surface water, and low population density. This attachment complements the annual summary of monitoring program activities and dose assessments presented in the main body of this report.
The Kennedy Space Center Shuttle launch site operations concept involves launch site facilities, operations, and crews being organized for maximum flexibility and minimum impact in support of future programs. The goal is to reduce program costs by having optimum utilization of facilities resulting in a greater return on the investment for these facilities. The present paper develops the notion that the cost and lead times associated with a program such as Space Industrialization can be significantly influenced by early planning for the transition of launch site operations concepts developed for the Space Transportation System.
The U.S. Department of Defense (DoD) has identified more than 400 underwater sites that are potentially contaminated with munitions. Many of these sites are in shallow water (0–35 m deep) where the munitions pose a threat to human health and the environmental. To address this challenge, the Strategic Environmental Research and Development Program (SERDP) and Environmental Security Technology Certification Program (ESTCP) held a workshop in 2018 to establish the requirements and framework for developing a series of underwater unexploded ordnance (UXO) Standardized Demonstration sites (“test beds”) to support the evaluation of sensors, equipment, and technologies to detect UXO. Sequim Bay in Washington State was evaluated as a potential test bed and was determined to meet initial qualifying criteria with respect to environmental setting, and operational, logistical, and facilities support provided by the Pacific Northwest National Laboratory (PNNL).
This report provides a summary of Pacific Northwest National Laboratory’s (PNNL’s) activities to initiate Phase II development of the Sequim Bay Underwater UXO Prototype demonstration site (MR-2735) in 2020. Testbed development and field operations were conducted by PNNL’s Coastal and Marine Research Laboratory (MCRL) in support of the Strategic Environmental Research and Development Program (SERDP) and Environmental Security Technology Certification Program (ESTCP) underwater Munitions Response (MR) program. A series of standardized underwater unexploded ordnance (UXO) demonstration sites (“testbeds”) are being developed by SERDP/ESTCP to test, evaluate, and demonstrate technologies that can detect, geolocate, and classify proud and buried munitions in 0–35 m water depths. As a prototype demonstration site, Sequim Bay is a semi-enclosed marine waterbody containing sand and mud sediments with minimal clutter in 5–30 m water depths. MCRL is located at the entrance to Sequim Bay, where it provides operational, logistical, and facilities support for testbed activities.
A Power Extension Package (PEP) has been designed to provide additional electrical power and energy during Shuttle sortie missions. The considered investigation was conducted to determine the most suitable allocation of PEP monitoring and control functions between the Orbiter's existing (centralized) Systems Management General Purpose Computer and an embedded PEP processor. PEP monitoring and control functions are examined, and a configuration definition is considered, taking into account the 'functional migration' process, function allocation criteria, and candidate functional configurations. A trade study is conducted, giving attention to an assessment of four candidate configurations. Assessment factors are related to cost, development risk, aspects of reliability and safety, PEP design complexity, PEP/STS integration complexity, flight operations, and launch/landing site operations. A thorough (subjective) assessment of the PEP system life cycle indicates substantial benefits from a distributed processing approach.
This panel focused on senior utility managers discussing specific disposal site issues with the disposal site operators. Representatives from each of the operating commercial disposal sites began by presenting an update of their facility, license, and waste acceptance criteria (WAC) followed by a panel discussion in response to audience questions. Panelists with presentations: Current and Emerging US NRC Regulatory Topics (Joe Weismann); WCS Update (Dan Burns); EnergySolutions Clive Facility Support for US LLW Disposal Issues (Vern C. Rogers)