Search NASA⌕ Search

SEARCH · Search NASA

Results for “site-built”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Modular Multi-family Construction: A Field Study of Energy Code Compliance and Performance through Offsite Prefabrication

Prefabrication in a controlled, factory setting may improve the energy code compliance and energy performance of modular buildings compared to traditional site-built buildings. To test this premise, the work detailed in this DOE-funded commercial field study (EE0009082) compares the energy code compliance of 25 modular and 30 site-built multifamily buildings under construction in Los Angeles, San Francisco, Philadelphia and Seattle representing climate zones 3B, 3C, 4A and 4C respectively. This dataset includes full data on 20 modular and site-built buildings and partial data on 35 modular and site-built buildings that had started prior to or were completed after the 18-month data collection period. This study also compares the post-occupancy energy performance or energy use intensity (EUI) of an additional 23 modular multifamily buildings and 128 site-built multifamily buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Zero Energy Ready Out of the Box

In this conference paper for the ASHRAE Buildings XV conference, December 2022, PNNL staff share key metrics for companies who are combining off site construction with certification to the U.S. Department of Energy’s Zero Energy Ready Home program to create homes that are both cost effective to construct and high performance to live in. Key performance metrics and measures for modular, panelized, and SIP homes are compared against all homes in the DOE Zero Energy Ready Home program and against new homes built to code. These metrics show that off-site construction homes got similar or better energy performance to site-built homes, and in the case of modular and panelized, at considerably lower average cost than site-built homes. The paper also highlights the experiences of two DOE Zero Energy Ready Home builders who employ offsite construction methods. One builder constructs production homes using pre-assembled panels. The other builder designs and ships kit homes all over the United States. The paper will focus on the optimum value engineering aspects of the panelized construction processes used by each builder to identify management and production practices employed by the builders to operate profitably while meeting high energy performance goals, despite a year marked by skyrocketing materials costs and supply chain and labor shortages. Cost and labor savings methods will be discussed in the context of these two unique business models.

U.S. Department of Energy Building Technologies Pr↗

Multifamily Air Leakage Evaluation: A Modular Case Study

The purpose of this case study is to compare the air leakage rates of modular and site-built multifamily dwelling units. The methods, materials, and equipment were observed to be very similar in the modular and site-constructed units in this case study. The installation quality of building envelope measures such as insulation and air barrier appeared to be better for modular construction, because they were installed in a controlled, factory setting. Through field observations, we identified cosmetic damage to the envelope of modular units following transport to the building site, but with no resulting significant air leakage pathways. However, we did see air leakage pathways resulting from field modifications to the envelope of modular units to accommodate structural and mechanical connections. We found that the extensive use of through-wall HVAC systems, combined with the transport, placement, and rework of modular units may compromise the high-quality envelope installation and airtightness observed in the factory without careful planning and/or design. Opportunities for improvement identified from the tested modular dwelling units include minimizing and optimally locating penetrations, pre-cutting and detailing penetrations at the factory where possible, properly sealing field modifications, and using split HVAC systems in place of through-wall packaged systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lab Evaluation of Downward Capacity of Radiant Ceiling Panel Systems

This project investigated the cooling delivery effectiveness of radiant ceiling panels as a function of attic insulation level using multiple laboratory testing and analytical methodologies. Delivery effectiveness is the heating or cooling energy delivered to a conditioned space divided by the total heating or cooling energy added or removed by the space conditioning system. The lower the losses of the heating or cooling delivery method, the higher the delivery effectiveness. For ducted systems, delivery effectiveness is reduced by both air leakage and thermal losses (especially if the ducts are installed in attics), while the delivery effectiveness of a radiant system supplied by hot and cold water is only reduced by thermal losses, which can be mitigated by sufficient insulation above, or at the "back" of the panel. Being installed at or below the ceiling plane, sufficient back insulation should be provided by default in the form of the attic insulation above the radiant ceiling panels. Site-built radiant ceiling panels were evaluated at Frontier Energy’s Building Science Research Laboratory (BSRL) in a uniquely designed environmental test chamber with independently controllable indoor and attic spaces and a height-adjustable ceiling.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Scalable and Cost-Effective Solution to the U.S. Housing Crisis: A Case Study on Locally Manufactured Modular Multifamily Housing

This case study assesses waste management efficiencies in modular buildings compared to traditional construction methods. We focus on the modular 1-bedroom Model/Z unit by Model Z Modular, LLC. As part of the collaboration between Model Z Modular and the National Renewable Energy Laboratory, we analyzed waste metrics from design through construction, contrasting these findings against conventional stick-built and site-built multifamily buildings. The Model/Z unit is part of a strategic effort to address affordable housing shortages in South Los Angeles, where household income challenges are pronounced. The unit is produced in a state-of-the-art 150,000 sq. ft. modular manufacturing facility located within the city it is serving, and has so far supported the production of over 1,500 affordable housing units. Model/Z units have been used in projects with as many as 195 units, achieving large economies of scale and time. Our analysis demonstrates that modular construction reduces waste compared to traditional methods. This reduction is achieved through precise prefabrication techniques, the implementation of new framing methods, the concentration of workforce expertise, and streamlined logistics, which optimize material use and greatly reduce on-site handling. Additionally, local manufacturing minimizes transportation needs, improving overall project efficiency. The Model/Z unit exemplifies a scalable solution for enhancing housing affordability by optimizing resource utilization and minimizing associated costs. These methods support the delivery of high-quality units at reduced expenses, addressing critical urban housing shortages effectively. This case study underscores Model Z Modular's commitment to producing affordable, quality housing while fostering economic opportunities through job creation and training programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

How Can Construction Process Simulation Modeling Aid the Integration of Lean Principles in the Factory-Built Housing Industry?

New and existing factories that produce and deliver factory-built housing can benefit from construction process simulation modeling to explore the integration of Lean principles in their operations. Construction process simulation modeling provides digital or virtual recreations of the real-world factory environments to visualize, quantify, analyze, and optimize their underlying behavior, including factory productivity, material flow, labor dynamics, bottlenecks, and work scope. One of the key benefits of process simulation modeling is the ability to create and compare "what-if" scenarios, including integrating Lean principles such as reducing waste (for example, transportation, waiting), line balancing, and just-in-time concepts. In general, three process simulation methods are widely used: discrete event simulation (DES), agentbased modeling (ABM), and system dynamics (SD). Myriad process simulation software also is available, but depending on the industry, complexity of the system, and purposes of the simulation, some software might be more appropriate. Similar to how computer-aided design (CAD) software such as AutoCAD and Rhinoceros enable building design of modular or factory-built housing, process simulation modeling software such as jStrobe, ProModel, and AnyLogic can enable factory design of new and existing factories to deliver modular affordable housing at scale, as opposed to traditional site-built construction. Software with DES capabilities can help generate a process model that is a logical representation of resources and activities in a factory. Software with CAD-DES integration can leverage product-process data integration to help spatially visualize a DES model of the factory in the CAD environment. Software with multimethod simulation capabilities, widely used in the manufacturing industry, brings together DES, ABM, and SD in a single platform that allows visualization, quantification, analyses, and optimization at varying data fidelities. Near-real-time data from an existing factory can be directly plugged into multimethod simulation software so that the construction process simulation model is a near-accurate representation of the real-world factory conditions. This report provides insights into the use of simulation as an aid to integrate Lean concepts in factories, including guidelines for selecting the appropriate process simulation modeling method and software. These insights have been developed as part of ongoing process simulation modeling research, development, and demonstration projects at the U.S. Department of Housing and Urban Development, the U.S. Department of Energy, and the National Renewable Energy Laboratory focused on how process simulation models can enable better integration of resilience, energy efficiency, and low-carbon design strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Benefits Of Automated Construction And Energy Efficiency Measures In Modular Homes

This article builds on and adds to a Buildings XV publication that introduced the Transformative Efficiency and Automation in Modular Homes (TEAMH) project. The TEAMH project sought to develop a scalable solution for producing modular homes with 20-50% energy savings and similar cost relative to site-fabricated single-family home construction. A key aspect of the project was assessing the potential for labor cost reductions through automation-assisted construction using light gauge steel (LGS). To quantify the advantages of this approach, side-by-side comparisons were made between traditional wood-framed construction and automation-assisted LGS construction. This demonstration involved constructing one wood-framed wall and several LGS test walls, accompanied by a time-and-motion study. The results indicated that automation assistance could decrease construction time and associated labor costs by as much as 46%. High-performance envelope technologies for exterior insulation and air sealing were evaluated to compare modular homes with site-built homes that meet the International Energy Conservation Code (IECC). A key technology considered was vacuum insulation panels (VIPs) with fiberglass cores. Guarded hot box testing of multiple full-scale wall assemblies containing different combinations of exterior continuous insulation systems containing phenolic foam and VIPs. Testing on various full-scale wall assemblies revealed that, with LGS construction, cavity insulation had minimal impact on exterior wall performance. Omitting cavity insulation can reduce labor and material costs while streamlining manufacturing, as its installation is labor-intensive and not easily automated due to the need for precise placement around wiring and other internal components. Guarded hot box tests of multiple LGS test walls with foam and VIP-based exterior insulation systems achieved R-values of up to 31 hr-ft2-°F/Btu. Finally, building energy modeling of multiple modular home designs indicated that the upgraded envelope assemblies can yield heating energy savings of up to 50% and cooling energy savings of up to 30% compared to IECC 2018 standards.

Shrestha, Som [ORNL] (ORCID:0000000183993797)↗