Search NASA⌕ Search

SEARCH · Search NASA

Results for “small RPS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

The Costs and Feasibility of Floating Offshore Wind Energy in the O'ahu Region

The State of Hawai'i has set a target to achieve a 100% Renewable Portfolio Standard (RPS) by 2045, and is well suited to become the first state to achieve this goal due to its relatively small load, high electricity prices, heavy reliance on imported fossil fuels, and favorable conditions for wind and solar. The Bureau of Ocean Energy Management contracted NREL to conduct a cost and feasibility study to provide information to decision makers on Hawai'i about the viability of floating offshore wind to be a part of the 100% RPS. We used NREL's Offshore Regional Cost Analyzer (ORCA) spatial cost model to evaluate the Levelized Cost of Energy (LCOE) in the region surrounding O'ahu as this is the island with the highest energy demand. The ORCA results showed that LCOE could range from around $\$$83 MWh to $\$$194 MWh for commercial operation dates in 2019 but has the potential to decrease to $\$$48 MWh - $\$$109 MWh by 2032 due to maturing global supply chains, increasing turbine rating, and new technological innovations. These costs are expected to be competitive with global floating wind costs in the early 2030s. The strong wind resource, proximity to infrastructure on land, and benign metocean conditions can potentially compensate for the logistical complexities of installing projects in Hawai'i far from mainland supply chains if sufficient investments are made to develop ports, grid infrastructure, and workforce on O'ahu to support the construction and operation of offshore wind projects. In addition to the cost results, this report also discusses the likely technologies that would comprise floating wind projects near O'ahu, the existing infrastructure available to projects, unique conditions facing offshore wind in the region such as exposure to hurricanes and limits on allowable export cable capacity, newly developed wind resource data sets for the region, and local stakeholder perspectives on offshore wind.

17 WIND ENERGY↗

Modular repeat protein sculpting using rigid helical junctions

The ability to precisely design large proteins with diverse shapes would enable applications ranging from the design of protein binders that wrap around their target to the positioning of multiple functional sites in specified orientations. We describe a protein backbone design method for generating a wide range of rigid fusions between helix-containing proteins and use it to design 75,000 structurally unique junctions between monomeric and homo-oligomeric de novo designed and ankyrin repeat proteins (RPs). Of the junction designs that were experimentally characterized, 82% have circular dichroism and solution small-angle X-ray scattering profiles consistent with the design models and are stable at 95 °C. Crystal structures of four designed junctions were in close agreement with the design models with rmsds ranging from 0.9 to 1.6 Å. Electron microscopic images of extended tetrameric structures and ~10-nm-diameter “L” and “V” shapes generated using the junctions are close to the design models, demonstrating the control the rigid junctions provide for protein shape sculpting over multiple nanometer length scales.

59 BASIC BIOLOGICAL SCIENCES↗

SPC-70783 Rev 0 Seismic Detector and Switch Survey and Verification Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core and Stirling engines under the Microreactor Application Research Validation and Evaluation (MARVEL) program. The MARVEL microreactor Reactor Protection System (RPS) will have a seismic trip function. The selected part for this design is ETNA2 manufactured by Kinemetrics, Inc. B. Acceptance of the items delivered under this scope of work can be performed through a direct evaluation of the supplier’s controls and a factory acceptance test.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗