Search NASA⌕ Search

SEARCH · Search NASA

Results for “software assurance risk mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

TU-G-BRD-02: Automated Systematic Quality Assurance Program for Radiation Oncology Information System Upgrades

Purpose: To: (1) describe an independent, automated, systematic software-based protocol for verifying clinical data accuracy/integrity for mitigation of data corruption/loss risks following radiation oncology information system (ROIS) upgrades; and (2) report on application of this approach in an academic/community practice environment. Methods: We propose a robust approach to perform quality assurance on the ROIS after an upgrade, targeting four data sources: (1) ROIS relational database; (2) ROIS DICOM interface; (3) ROIS treatment machine data configuration; and (4) ROIS-generated clinical reports. We investigated the database schema for differences between pre-/post-upgrade states. Paired DICOM data streams for the same object (such as RT-Plan/Treatment Record) were compared between pre-/post-upgrade states for data corruption. We examined machine configuration and related commissioning data files for changes and corruption. ROIS-generated treatment appointment and treatment parameter reports were compared to ensure patient encounter and treatment plan accuracy. This protocol was supplemented by an end-to-end clinical workflow test to verify essential ROI functionality and integrity of components interfaced during patient care chain of activities. We describe the implementation of this protocol during a Varian ARIA system upgrade at our clinic. Results: We verified 1,638 data tables with 2.4 billion data records. For 222 under-treatment patients, 605 DICOM RT plans and 13,480 DICOM treatment records retrieved from the ROIS DICOM interface were compared, with no differences in fractions, doses delivered, or treatment parameters. We identified 82 new data tables and 78 amended/deleted tables consistent with the upgrade. Reports for 5,073 patient encounters over a 2-week horizon were compared and were identical to those before the upgrade. Content in 12,237 xml machine files was compared, with no differences identified. Conclusion: An independent QA/validation approach for ROIS upgrades was developed and implemented at our clinic. The success of this approach ensures a robust QA of ROIS upgrades without manual paper/electronic checks and associated intensive labor.

60 APPLIED LIFE SCIENCES↗

Fire Risk Investigation in 3D (FRI3D) Software and Process for Integrated Fire Modeling

Modeling and implementing fire safety for nuclear power plants is a costly activity. Because of the complexity of fire phenomena and multiple operational procedures, it is difficult to computationally provide assurance that mitigation methods are adequate for critical areas using current analysis methods in a cost-effective manner. The nuclear industry needs efficient methods to provide more accurate modeling and optimize mitigation methods to improve nuclear power plant understanding for fire scenarios. This report describes the work done over the last two year on the Fire Risk Investigation in 3D (FRI3D) software. This software simplifies the modeling process by importing existing plant models and data, incorporating a 3D modeling environment and coupling with the fire simulation software CFAST. This eliminates the manual labor and errors associated with much of the fire modeling process. The report lays out the status and path of FRID software for the Risk Informed Safety Analysis pathway of the Light Water Reactor Sustainability project at Idaho National Laboratory and industry collaborators to best help reduce costs and improve realism in fire probabilistic risk analysis.

97 MATHEMATICS AND COMPUTING↗

CRITICAL FUNCTION ASSURANCE: Understanding Critical Function and Critical Function Delivery is Foundational for Meaningful ICS Security Improvement and Policy Efforts

Modern life is enabled by a complex and interdependent web of critical functions, including energy, communications, transportation, food, and water. Automation has significantly reduced or replaced human interactions in the delivery of these functions, resulting in a web of goods and services that are made available 24/7 only through unique and intentional deployments of microprocessors, software, and firmware technologies. The prospect of cyber-enabled sabotage of these processes disrupts traditional risk determination models. Critical Function Assurance (CFA) is a foundational approach to identifying, prioritizing, and mitigating the risk that is inherent in the delivery of critical functions that depend on digital technology. It provides rapid focus to what matters most and illuminates elements and areas of risk that otherwise are often overlooked. This focus enables effective application of available security resources and optimizes security strategy and policy efforts. This paper introduces CFA to decision makers and risk executives (including CEOs, COOs, CFOs, and CISOs) whose organizations support and deliver the critical functions that underpin national defense, societal health and safety, and a vibrant economy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Transmission Technologies – GETs and HPCs Session 2: Advanced Power Flow Control and Transmission Topology Optimization

The INL TADA GETs Cohort Session 2, held on November 7, 2025, conducted in collaboration with ScottMadden, focused on two core Advanced Transmission Technologies (ATTs): Advanced Power Flow Control (APFC) and Transmission Topology Optimization (TTO). These technologies are pivotal in enhancing grid flexibility, reliability, and cybersecurity resilience. APFC, particularly through modular FACTS devices like Modular Static Synchronous Series Compensators (M-SSSCs), enables dynamic voltage injection to reroute power flows. The session highlighted the deployment benefits of APFC, such as rapid installation, minimal civil works, and re-deployability. Regulatory drivers like FERC Order 2023 mandate the inclusion of Grid-Enhancing Technologies (GETs) in interconnection studies. Case studies from Central Hudson, CAISO, and National Grid (UK) demonstrated APFC’s effectiveness in congestion relief and cost savings. The session also addressed cybersecurity concerns, including firmware vulnerabilities, SCADA integration risks, and supply chain dependencies. Participants engaged in interactive exercises to rank cybersecurity and supply chain risks, emphasizing the need for robust digital assurance strategies. TTO involves software-based reconfiguration of transmission networks to optimize power flow without new infrastructure. The session showcased its operational value, with examples from SPP, PJM, and MISO showing significant congestion cost reductions. Cybersecurity vulnerabilities were discussed, particularly in API security and software supply chains, referencing incidents like SolarWinds and attacks on Danish utilities. Digital assurance exercises explored worst-case scenarios, attack paths, and mitigation responsibilities between vendors and utilities. Reliability challenges such as algorithm stability, vendor dependency, and operator trust were also examined. Cross-cutting themes emphasized the importance of digital assurance tools, including Software Bills of Materials (SBOMs) and hardware-in-loop testing. Human performance, training, and operational confidence were identified as critical enablers of technology adoption. The session concluded with a preview of Session 3, which will focus on High Performance Conductors (HPCs) and risk-based cybersecurity tools. Session 2 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

A Systematic Comprehensive Computational Model for Stake Estimation in Mission Assurance: Applying Cyber Security Econometrics System (CSES) to Mission Assurance Analysis Protocol (MAAP)

In earlier works, we presented a computational infrastructure that allows an analyst to estimate the security of a system in terms of the loss that each stakeholder stands to sustain as a result of security breakdowns. In this paper, we discuss how this infrastructure can be used in the subject domain of mission assurance as defined as the full life-cycle engineering process to identify and mitigate design, production, test, and field support deficiencies of mission success. We address the opportunity to apply the Cyberspace Security Econometrics System (CSES) to Carnegie Mellon University and Software Engineering Institute s Mission Assurance Analysis Protocol (MAAP) in this context.

97 MATHEMATICS AND COMPUTING↗

Quality Assurance Needs for Modern Image-Based Radiotherapy: Recommendations From 2007 Interorganizational Symposium on 'Quality Assurance of Radiation Therapy: Challenges of Advanced Technology'

This report summarizes the consensus findings and recommendations emerging from 2007 Symposium, 'Quality Assurance of Radiation Therapy: Challenges of Advanced Technology.' The Symposium was held in Dallas February 20-22, 2007. The 3-day program, which was sponsored jointly by the American Society for Therapeutic Radiology and Oncology (ASTRO), American Association of Physicists in Medicine (AAPM), and National Cancer Institute (NCI), included >40 invited speakers from the radiation oncology and industrial engineering/human factor communities and attracted nearly 350 attendees, mostly medical physicists. A summary of the major findings follows. The current process of developing consensus recommendations for prescriptive quality assurance (QA) tests remains valid for many of the devices and software systems used in modern radiotherapy (RT), although for some technologies, QA guidance is incomplete or out of date. The current approach to QA does not seem feasible for image-based planning, image-guided therapies, or computer-controlled therapy. In these areas, additional scientific investigation and innovative approaches are needed to manage risk and mitigate errors, including a better balance between mitigating the risk of catastrophic error and maintaining treatment quality, complimenting the current device-centered QA perspective by a more process-centered approach, and broadening community participation in QA guidance formulation and implementation. Industrial engineers and human factor experts can make significant contributions toward advancing a broader, more process-oriented, risk-based formulation of RT QA. Healthcare administrators need to appropriately increase personnel and ancillary equipment resources, as well as capital resources, when new advanced technology RT modalities are implemented. The pace of formalizing clinical physics training must rapidly increase to provide an adequately trained physics workforce for advanced technology RT. The specific recommendations of the Symposium included the following. First, the AAPM, in cooperation with other advisory bodies, should undertake a systematic program to update conventional QA guidance using available risk-assessment methods. Second, the AAPM advanced technology RT Task Groups should better balance clinical process vs. device operation aspects-encouraging greater levels of multidisciplinary participation such as industrial engineering consultants and use-risk assessment and process-flow techniques. Third, ASTRO should form a multidisciplinary subcommittee, consisting of physician, physicist, vendor, and industrial engineering representatives, to better address modern RT quality management and QA needs. Finally, government and private entities committed to improved healthcare quality and safety should support research directed toward addressing QA problems in image-guided therapies.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Process-based quality management for clinical implementation of adaptive radiotherapy

Purpose: Intensity-modulated adaptive radiotherapy (ART) has been the focus of considerable research and developmental work due to its potential therapeutic benefits. However, in light of its unique quality assurance (QA) challenges, no one has described a robust framework for its clinical implementation. In fact, recent position papers by ASTRO and AAPM have firmly endorsed pretreatment patient-specific IMRT QA, which limits the feasibility of online ART. The authors aim to address these obstacles by applying failure mode and effects analysis (FMEA) to identify high-priority errors and appropriate risk-mitigation strategies for clinical implementation of intensity-modulated ART. Methods: An experienced team of two clinical medical physicists, one clinical engineer, and one radiation oncologist was assembled to perform a standard FMEA for intensity-modulated ART. A set of 216 potential radiotherapy failures composed by the forthcoming AAPM task group 100 (TG-100) was used as the basis. Of the 216 failures, 127 were identified as most relevant to an ART scheme. Using the associated TG-100 FMEA values as a baseline, the team considered how the likeliness of occurrence (O), outcome severity (S), and likeliness of failure being undetected (D) would change for ART. New risk priority numbers (RPN) were calculated. Failures characterized by RPN ≥ 200 were identified as potentially critical. Results: FMEA revealed that ART RPN increased for 38% (n = 48/127) of potential failures, with 75% (n = 36/48) attributed to failures in the segmentation and treatment planning processes. Forty-three of 127 failures were identified as potentially critical. Risk-mitigation strategies include implementing a suite of quality control and decision support software, specialty QA software/hardware tools, and an increase in specially trained personnel. Conclusions: Results of the FMEA-based risk assessment demonstrate that intensity-modulated ART introduces different (but not necessarily more) risks than standard IMRT and may be safely implemented with the proper mitigations.

60 APPLIED LIFE SCIENCES↗

Simplifying the Tracking of Waste Disposal Inventories: Process Improvement for Rapid Data Interpretation and Reduced Errors - 16143

Tracking the inventory of low-level radioactive waste at an operating disposal facility offers unique challenges. At the Savannah River Site's Saltstone Disposal Facility (SDF) the inventory used in Performance Assessment modeling is determined based on radionuclide concentrations from the aqueous waste in a feed tank and the volume of the waste that is transferred from the feed tank to the Saltstone Production Facility (SPF). These inputs are reported quarterly. As such, the disposal inventories are also updated quarterly; however, due to decay and ingrowth, the inventory values for some radionuclides can be misrepresented if the data is not tracked appropriately. Additionally, it is not feasible to analyze the feed tank samples for every possible radionuclide; therefore, a series of adjustments are necessary to estimate the concentrations of radionuclides that are not explicitly measured but still pose a potential dose risk. Prior to 2015, the SDF disposal inventories were updated using a series of spreadsheets that required users to perform a significant number of steps (including manually transferring data back and forth between a separate decay and ingrowth calculation software). Despite this labor intensive approach, the process only provided single point-in-time results. With multiple steps, minimal automation, and limited result data, this approach to inventory tracking was not ideal and minor mistakes were often identified during the equally cumbersome review process. As a process improvement, the simplified SDF Waste Inventory Disposed Estimator (SDF-WIDE) Model was developed using GoldSim software. The software allows users to identify specific dates to define the duration of the simulation, from the beginning of operations until the time of future facility closure, and provides graphical interfaces for displaying data over time. Further, GoldSim's Contaminant Transport Module is used to perform the decay and ingrowth calculations, making the model completely self-contained (i.e., there is no need to transfer intermediate data back and forth between different programs). GoldSim also includes model 'versioning' features that significantly reduce the time needed to perform the appropriate quality assurance reviews as required for each quarterly inventory update. By transitioning from the complex spreadsheets to the simplified SDFWIDE model, the time needed to perform updates to the SDF inventory has been reduced from days to hours, the risk of making human errors has been greatly mitigated, and users are able to quickly observe trends in the data over time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reliability Assessment of Safety-Critical Network Communication in a Digitalized Nuclear Power Plant

In analog instrumentation and control (I and C) systems for nuclear power plants (NPPs), most connections are comprised of hardwired point-to-point types. Since they are based on analog technologies, they are fragile to noise and require analog-to-digital conversion time. Therefore, many NPPs have adopted communication network for the exchange of safety-critical data between programmable logic controllers (PLCs) in digital I and C systems to effectively accommodate a huge number of field controllers. However, the primary issue of digital network communication in a safety-critical system involves potential hazards, such as partial or total loss of communication between PLCs, which may result in a failure of safety critical signal generation when it is needed. Therefore, the probability that a safety-critical system in digitalized NPP becomes unsafe due to a network failure must be evaluated to quantify the risk of digital I and C system. In Korea, the Engineered Safety Feature-Component Control System (ESF-CCS) was developed as one of the digital safety-critical system in Advanced Power Reactor- 1400 (APR-1400). The function of a digital engineered safety feature (ESF) actuation system and field actuator controllers of conventional NPPs are performed by the ESF-CCS. In this system, safety-critical network, High Reliable- Safety Data Network (HR-SDN), was employed for the safety-critical data transmission from group controllers (GCs) to loop controllers (LCs). In this study, a framework for assessing the reliability of a HR-SDN network communication between GCs and LCs in the ESF-CCS in addition to a fault-tree model for ESF components considering network failure between GCs and LCs were developed to assess the plant risk effect of a newly developed digitalized ESF-CCS. Based on the case studies and cut set analysis, the risk effect of network failure on plant risk and the important risk contributors of network failure were quantitatively addressed. A framework for identifying the potential hazardous states of network communication in the ESFCCS was proposed. In addition, a fault-tree model for network communication failure was developed to estimate the risk effects of network failure between the GCs and LCs on ESF-CCS signal failure. The developed fault-tree model was then applied to several case studies. The fault-tree model of ESF-CCS signal failure for ESF components required for various mitigation actions regarding NPP DBAs was designed by considering the identified hazardous states of network failure that would result in a failure to provide input signals to the corresponding LC. As a sensitivity study, three case studies were performed based on the periodic test methods for hardware components in HR-SDN module and their test intervals in this study. The quantitative results for three case studies demonstrated that the probability of overall network communication failure, which was calculated as the sum of the failure probability associated with each failure cause, contributed up to 1.58% on the Small-LOCA CD frequency. The results also revealed the important basic events related to network failure in the case studies which included CCF of hardware and software in HR-SDN module. This study is expected to provide insight into the development of the fault-tree model for the network failure in digital I and C system and into the quantification of the risk effect of network failure for safety-critical data transmission in NPPs. As a further study, the risk effects of network failure in the ESF-CCS on the plant risk can be estimated in a more detailed manner by analyzing the failure modes and causes in a sub-component level and the fault detection coverage of the fault tolerance techniques for network failure implemented in ESF-CCS after the detailed configuration of ESF-CCS is decided. In terms of the failure of manual ESF actuation, the relationship among the human action failures must be investigated to consider multiple human error condition since ESF-CCS provides multiple manual actuation to assure the diversity of the system. Since the conventional HEP method cannot accommodate the multiple conditions in a fault tree, condition-based human reliability assessment (CBHRA) method or the dynamic human reliability modeling approach can be applied to include a complex relationship among the automated safety signal generation and the human operator's manual actuation, avoiding the optimistic estimation of HEP of the human action failure.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Refinement and Exploration

This report documents activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2023 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective, and secure DI&C technologies for digital upgrades/designs. A risk assessment-informed framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk informed capability to quantitatively estimate the safety margin obtained from plant modernization, especially for safety-related DI&C systems, (2) support and supplement existing risk informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of safety-related DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the LWRS-developed framework provides a means to address relevant technical issues by: (1) defining a risk informed analysis process for DI&C upgrade that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies in nuclear power plants (NPPs). Adding diversity within a system or components is the primary means to eliminate and mitigate CCFs, but diversity also increases system complexity and may not address all sources of systematic failures. Optimization of diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in safety-related DI&C systems of NPPs and supporting relevant design optimization, the proposed framework provides: (a) A best-estimate, risk informed capability to address new technical digital issues quantitatively, focusing on software CCFs in safety-related DI&C systems of NPPs; (b) A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to predict and prevent risk in the early design stage of DI&C systems; (c) Technical bases and risk informed insights to assist users address the risk informed alternatives for evaluation of CCFs in safety-related DI&C systems of NPPs; and (d) A risk informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The research and development efforts of this project in FY 2023 are focused on refining current methods on software CCF modeling and estimation and exploring additional innovative approaches to risk assessment of DI&C systems to enable a more comprehensive and complete assessment of various safety-related DI&C design architectures. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists. It should be noted that all the analyses are performed for the demonstration of the methodology, not for the evaluation of an actual digital control system. Results are obtained based on limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗