Results for “solar PV permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

Photovoltaic (PV) Quick Reference Guide

This Photovoltaic (PV) and Energy Storage System (EES) Quick Reference Guide is for inspectors inspecting projects permitted with SolarAPP+.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

County Land-Use Regulations for Solar Energy Development in Colorado

We present a survey of county-level policies on ground-mounted solar development across Colorado, including both solar-specific ordinances as well as general land-use code that might be applicable in counties without solar-specific policies. This report provides an accessible reference for stakeholders interested in identifying counties with particular regulations or in analyzing the diversity of regulations across Colorado. We defined a set of search criteria to find information on solar definitions and classifications, permitting processes, and use-specific requirements in each of Colorado's 64 counties. With those criteria, we reviewed relevant ordinances, land-use code, and comprehensive and master plans. If any uncertainties were identified, we contacted county officials for clarification. The findings are categorized and mapped to illustrate the distribution of key policies adopted across Colorado's counties on the following topics: solar definitions, solar siting policy documentation, categorization of PV systems for permitting, 1041 permitting, solar on agricultural land, panel height restrictions, fencing requirements, vegetation management, visual impacts, decommissioning plans, and financial assurance for decommissioning. Additionally, we identify and discuss policies that might impact the deployment of agrivoltaics, a dual land use combining both agriculture and solar on the same land, which might not fit neatly in existing zoning definitions and solar-specific regulations.

14 SOLAR ENERGY↗

Benefits of the SolarAPP+ Online Permitting Software

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems.

automated permitting↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

5 Easy Steps to SolarAPP+ Adoption

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems. Here's how your jurisdiction can get started.

automated permitting↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Data Analytics for Residential PV from Permit to Interconnect (Final Technical Report)

The main objective of this research is to provide novel insights into the effects of permitting, inspection, and interconnection (PII) processes on PV system installations—and in particular, into the relationship between PII processes and adoption timelines. This research can then be used to clarify the potential effect of various process changes on reducing PII timelines, customer cancellation rates, and related costs nationwide. NREL completed this research by assembling a data set of distributed, largely residential rooftop solar systems less than 50 kilowatts in size from participating solar installers. NREL produced five publications describing the effects that PII processes can have on adoption timelines nationwide, in addition to publishing an interactive data viewer with five years of PII cycle time data. This tool can be used by stakeholders to identify potential adoption timelines by local government.

14 SOLAR ENERGY↗

Solar and Battery Storage Permitting and Siting Requirements - Solar Prize Round 7 (CRADA Final Report)

The purpose of this research project was to aggregate zoning and permitting data for utility-scale solar PV and battery energy storage systems. The ultimate goal of this collaboration is to lower solar and battery energy storage system soft costs by streamlining regulatory due diligence and reducing the burden of conducting feasibility assessments for solar and storage systems. The below sections describe the specific research completed by NLR (the contractor) in furtherance of the agreement with Vanox (the participant).

14 SOLAR ENERGY↗

Residential and Small Commercial Solar Photovoltaic and Storage Permitting, Inspection, and Interconnection Timelines: A Retrospective Review (2017-2023)

This report is part of the ongoing Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE) project, led by the National Renewable Energy Laboratory (NREL). The SolarTRACE project utilizes time-stamped project-level data provided by installer-partners to assess nationwide and AHJ- and utility-level PI&I and other solar PV adoption timelines since 2017. Our dataset now covers 22% of residential solar and 33% of residential storage installs in the U.S. since 2017. This report provides an update to our previous 2022 report (Cruce et al., 2022b) and includes: updated 2017 2023 project timelines for residential rooftop solar PV up to 20kW; updated tracking of permitting process changes at nearly 4,000 AHJs nationwide; and first-ever reporting of timelines for residential PV+storage projects up to 20kW.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review: Final Technical Report

The National Renewable Energy Laboratory (NREL) and its project partners have developed the novel Solar Automated Permit Processing plus (SolarAPP+) software platform that provides a flexible, web-based PV-permitting tool for residential systems that can be integrated with existing and complementary software platforms. The main objective of this research is to analyze the implementation of SolarAPP+. Analysis was conducted by identifying the benefits, tradeoffs, and overall performance of SolarAPP+, including achieving its goals of delivering automated, code compliant systems, influencing permitting cycle times, and improving application submittals and/or inspection performance. The NREL team published the results of this analysis in annual SolarAPP+ Performance Review technical reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Documenting 15 Years of Reductions in U.S. Solar Photovoltaic System Costs

The U.S. Department of Energy's (DOE) Solar Energy Technologies Office (SETO) has played a key role in reducing PV system costs by supporting essential and high-impact research, development, and deployment (RD&D) activities. SETO's efforts go beyond improving technology and hardware innovations to tackle soft costs like installation labor, permitting, and customer acquisition. This holistic focus ensures that solar energy remains a viable, scalable solution for combating climate change and achieving the nation's clean energy goals. This National Renewable Energy Laboratory's (NREL) report highlights over a decade of transformative advancements in PV system technology and its cost reductions from 2010 to 2024, documenting a remarkable trajectory in line with the goals set forth by SETO. By analyzing benchmark configurations across different photovoltaic (PV) sectors over years, this work provides industry stakeholders with a comprehensive understanding of cost trends and their impact on Levelized Cost of Energy (LCOE) targets established under the 2010 SunShot Initiative.

14 SOLAR ENERGY↗

Solar and Battery Storage Permitting and Siting Requirements - Solar Prize Round 7 (CRADA Final Report)

The purpose of this project is to identify local zoning ordinances, state permitting requirements, federal regulatory bottlenecks throughout the development process, and the potential to use Large Language Models (LLM) and aggregate permitting and interconnection data for commercial and industrial (C&I), community, and utility-scale solar photovoltaic (PV) and battery storage projects.

14 SOLAR ENERGY↗

SolarAPP+ Enhancements and Commercialization (Final Technical Report)

With millions of distributed photovoltaic (PV) systems expected to be installed over the next five years, the permitting and inspection processes of authorities having jurisdiction (AHJs) may become overburdened, causing delays and increased costs for installed systems (Cruce et al. 2022). The central goal of this project was to automate and streamline permitting processes for distributed PV systems and complementary technologies, such as battery storage. Deploying automated permitting has been hypothesized to reduce permit review times, resulting in reduced costs and improved customer experience. This has the potential to expand the PV and PV-plus-storage market nationwide. The National Renewable Energy Laboratory (NREL) and its project partners, including UL Solutions, the Interstate Renewable Energy Council (IREC), the International Code Council (ICC), and more, developed the Solar Automated Permit Processing (SolarAPP+™) software platform to reduce permit review times. NREL and its partners also collaborated with the solar industry, the building safety community, and local governments to develop SolarAPP+.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar PV Transmission Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from transmission. A setback requirement is a minimum distance from transmission infrastructure that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a 30-meter setback, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Railroad Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from railroads. A setback requirement is a minimum distance from a railroad that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a 30-meter setback, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Oil and Gas Pipeline Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from oil and gas pipelines. A setback requirement is a minimum distance from a pipeline that an energy project may be developed. As of April 2022, no ordinances were discovered for any counties. Such ordinances are likely to arise as regulations continue to expand. Therefore, this dataset applies a 30-meter setback, sourced from trends in other infrastructure. A TIF data file and a PNG map of the data are provided, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗

Solar PV Water Setbacks: Ordinances (2022) and Extrapolated Trends

This dataset represents solar energy setback requirements from bodies of water based on county ordinances as of April 2022. A setback requirement is a minimum distance from water that an energy project may be developed, and these varied widely across the counties in which they existed. Two versions are provided: one reflecting only the county ordinances and another incorporating extrapolated trends. In the extrapolated version, a default setback of 30 meters was applied in counties without specific water setback regulations. A TIF data file and a PNG map of the data are provided for both versions, showing areas where solar energy is prohibited or permitted across the contiguous United States. For further details and citation, please refer to the publication linked below: Lopez, Anthony, Pavlo Pinchuk, Michael Gleason, Wesley Cole, Trieu Mai, Travis Williams, Owen Roberts, Marie Rivers, Mike Bannister, Sophie-Min Thomson, Gabe Zuckerman, and Brian Sergi. 2024. Solar Photovoltaics and Land-Based Wind Technical Potential and Supply Curves for the Contiguous United States: 2023 Edition. Golden, CO: National Renewable Energy Laboratory. NREL/TP-6A20-87843.

Array↗