Search NASASearch

SEARCH · Search NASA

Results for “solar array”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY

Solar Design/Install Labor Quantification (Cooperative Research and Development Final Report)

The goals of this project were to quantify the rate and/or total expected labor expenditure of engineers designing solar arrays and electricians installing solar across a spectrum of project sizes and configurations. Specifically, procuring and analyzing labor data from solar engineering firms relating to the amount of time it takes an engineer to design a solar project, the amount of time it takes an engineer to perform a wiring or stringing design, the amount of time it takes an electrician to install a solar project and the amount of time it takes electricians to install the strings of a solar array. Then these details could be analyzed to evaluate labor intensity for solar design/installation. These goals were unable to be completed because the participant was unable to collect the necessary data for analysis.

14 SOLAR ENERGY

The Rise of US Photovoltaics: An Exploration of Land Use Density Trends in Large‐Scale Solar Facility Attributes, 2012–2021

An energy transition is underway in the United States; renewable energy generation is now on par with coal and nuclear generation. The number of large-scale solar photovoltaic facilities increased approximately tenfold between 2012 and 2021, with an associated 25-fold increase in cumulative installed capacity. With ambitious decarbonization and renewable energy deployment goals at both the federal and state levels, deployments of large-scale solar photovoltaic facilities will continue apace. This growth is likely to be complex with ripples of impacts felt throughout different aspects of society, and thus accurate solar land use metrics allowing more accurate predictions are of value to policymakers, planners, and other stakeholders in the future photovoltaic build-out. In this paper, we leverage data from the newly released US Large-Scale Solar Photovoltaic Database to examine recent trends in large-scale solar photovoltaic land use. We analyze the relationships between solar array capacity density (W/acre) and a range of facility attributes to better understand the future land requirements of solar capacity expansion over the coming years. Installed capacity was the single strongest determinant of solar array area. However, we found substantial variation in capacity density across facility attributes, including mount type, latitude, urbanicity, time, and prior land use.

14 SOLAR ENERGY

Wind Conditions for Solar Energy Facility Design Based on Field Measurements at Nevada Solar One

This study characterises near-surface wind conditions at the Nevada Solar One (NSO) concentrated solar power plant using two years of measurements from a 15-m mast located 30 m west of the solar arrays. The surrounding terrain is fairly flat within 3 km, but nearby solar photovoltaic (PV) and concentrated solar power (CSP) installations introduce strong directional wind inhomogeneity, which motivates a sector-based analysis that distinguishes undisturbed inflow from waked flow. The analysis uses data from three sonic anemometers to assess whether turbulence in the surface layer can be represented as Gaussian and whether standard surface-layer scaling remains valid below 10 m height. The roughness length and displacement height are estimated for twelve directional sectors under near-neutral wind conditions, and all three velocity components show departures from Gaussian behaviour. Spectral analysis indicates that the turbulence contains low-frequency fluctuations with amplitudes higher than those predicted by standard models such as the Kaimal model or the Simiu and Scanlan model. The study introduces a new turbulence spectral model based on the eddy-surface-layer framework to better represent near-surface wind turbulence. The analysis further quantifies the influence of the surrounding power plants on mean wind profiles, one-point spectra, and vertical coherence for all velocity components. The solar collector arrays located 30 m east of the mast significantly modify the turbulence structure, whereas PV installations situated a few hundred metres away have only a limited influence on the turbulence measured at the mast. These findings highlight the limitations of conventional turbulence models for near-surface wind over solar infrastructure and provide improved parameterisations to support the structural design. The implications for the structural response of parabolic troughs and PV modules to such turbulence remain uncertain and require further investigation.

14 SOLAR ENERGY

Maturing Rational Design Methodologies and Industry Consensus Engineering Standards: Critical Fastened Joints - Solar PV Industry

Critical structural joints can be seen throughout a solar array and are called upon to secure modules and keep racking assembled and able to resist large demands from winds and snow loads. In the relatively new and fast-growing solar PV industry, the important role these hardware assemblies (e.g. clips, clamps, bolts, nuts, washers) play is not well understood by product designers. Failures with critical structural joints are surprisingly common and point to the need for maturing the engineering and assembly of these joints. The wide variety of design concepts (Figure 2&2) demonstrate interesting and innovative ideas but are lacking the basics of fastener engineering seen in matured industries (e.g. transportation, buildings). Complicating the maturing process for critical structural joints is that they are one component in rack supporting structures that exhibits a systems behavior; each component will affect the other and play a key role in maintaining structural integrity. When wind loads the surface of a module, the underlying racking members deflect and twist which in turn imparts forces back into the joints and into the mounted modules. Often, these supporting rack structures exhibit high deflections and low natural frequencies which amplify the demands placed into the joints even in moderate winds. Current engineering practices and associated structural conventions view solar racking support structures as they would a high mass building that exhibit more static behaviors in wind events. Solar structures are unique from high mass buildings and require the development of solar specific industry engineering consensus standards.

14 SOLAR ENERGY

Simulate Wind Loading on RUTE SunTracker: Cooperative Research and Development (Final Report)

RUTE produces and delivers efficient, sustainable structural foundation systems for the wind and solar industries, instrumental in the effort to lower the cost of clean electricity and reduce CO2. RUTE's SunTracker is a high-clearance agrivoltaic solar array. The system uses raised cables, providing support with less materials and cost. These cables can provide tracking for increased energy generation and greater revenue, allowing the land beneath to be used for other means simultaneously. RUTE provided data files that NREL will use to perform computational fluid dynamics (CFD) simulations to characterize and predict wind loading on the 6x6 RUTE SunTracker photovoltaic (PV) array. Varying both the panel orientations and wind speeds provides information on how the array can manage a variety of weather conditions. These results, in turn, inform RUTE's design and construction of these arrays.

14 SOLAR ENERGY

Solar Panel Anti-Soiling Evaluation (CRADA Final Report)

NREL and Pellucere Technologies, Inc. will cooperate to leverage NREL’s existing testing and data analysis capability to evaluate solar panel anti-soiling coating in both laboratory testing conditions and from actual solar array field data.

14 SOLAR ENERGY

Control and Real-Time Simulation of Microgrids with EV Fast-Charging and Grid-Forming Resources

Fast charging stations (FCSs) for electric vehicles (EVs) can behave as constant power loads, which is problematic for the operation of grid-forming (GFM) inverter-based resources (IBRs). To tackle this problem, this paper proposes a control suite that makes FCSs responsive to ac voltage and frequency disturbances. To test the performance of the FCS controls, the paper also sets forth theory to compensate for time-delays appearing in the real-time simulation of microgrid models divided into several central processing units (CPUs). Furthermore, these contributions are showcased via multi-CPU real-time simulations of a faulted microgrid having EV FCSs and GFM IBRs powered by photovoltaic solar arrays as well as power hardware-in-the-loop experiments. These contributions are significant to address NERC recommendations and IEEE standards.

14 SOLAR ENERGY

Community Solar Project Models: An Introduction to Basic Financial and Administrative Relationships [Slides]

This resource is a collection of visual aids and descriptions to help explain the basic financial and administrative relationships underpinning common community solar project models. The graphics in this resource depict the flow of electricity from generation to consumption and the financial exchanges between the community solar project owner, subscribers, and distribution utility. Community solar models vary based on ownership (e.g., third party, utility), customer type (e.g., multifamily, single-household), and solar array location (e.g., on-site, off-site).

14 SOLAR ENERGY

Solar Energy Demonstration Project for Public Libraries

In this project, the South Hero Library Foundation purchased and installed a 39.95 kW DC roof-mounted solar array on the south-facing roof of the Worthen Library as well as on the south-facing roof of the neighboring 54 Community Lane building. This 94 panel array has a projected output of 39,950 kWh of power which will cover the Library’s annual power usage for heat and lighting. Any power overage will be distributed to other local organizations as designated by the Library. Library programming and added resources will be available to all patrons.

14 SOLAR ENERGY

Greater Toledo Community Foundation Sustainable Communities Educational Initiative (Final Technical Report)

The Greater Toledo Community Foundation’s (GTCF) Sustainable Communities Educational Initiative leveraged the two recently constructed Overland Solar Arrays to launch a diverse collection of educational activities designed to promote the intersection between workforce development, renewable energy and community activism to showcase emerging avenues for greater prosperity in communities that have experienced historic disinvestment. In addition to educational programming focused on employment in the clean energy and advanced manufacturing fields, the project also activated storytelling approaches to explain sustainable energy’s role in philanthropy, grantmaking and resident-led neighborhood enhancements.

14 SOLAR ENERGY

Solar Panel Installation at Goucher College

As part of our multi-phased sustainability initiative, Goucher College is implementing a series of necessary changes to become a model “green” campus. This comprehensive approach includes implementing systems designed to reduce energy consumption, water usage, and waste production by 2030. The first phase of this holistic endeavor is to develop two independent solar projects. One will be on the Facility Management Services building (FMS) and the other will be on the Central Utility Plan (CUP). The anticipated duration of this project is expected to be 24 months. When completed, the new photovoltaic panels (PVPs) and resulting solar array system will help offset campus energy consumption. The projects will also help the College achieve its goal of working towards operating primarily on renewable energy. During initial review of the project, it was revealed replacing the roofs prior to installing new PVPs would not only provide a sound structural foundation for the projects, but the new roofing systems will also aid de-carbonization. The project’s scope is divided between two buildings. Building A: FMS is the first building and Building B: CUP is the second building.

14 SOLAR ENERGY

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY

Corral Summit Pumped Storage Hydropower Hybrid Site Suitability Assessment (Rev.1)

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY

DOE EV Data Collection - Facility Data

Facility data includes information on electricity consumption by larger-scale infrastructure, including buildings, solar arrays, and energy storage systems. Parameter definitions can be found in the data dictionary. If a connection between specific vehicle information and facility data exists, it will be available in the vehicle attributes table. Vehicle ID can be used as a key between vehicle data and vehicle attribute tables. Data is being uploaded quarterly through 2023 and subject to change until the conclusion of the project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

The Iowa Tribe of Kansas and Nebraska: Advancing Clean, Resilient, and Sovereign Energy (Summary Report of Communities LEAP Activities)

The Iowa Tribe of Kansas and Nebraska (ITKN) is a federally recognized Native American Tribe located along the Missouri River on the border of northeast Kansas and southeastern Nebraska. There are over 800 residents (Tribal citizens and non-Tribal) who live on the reservation, as well as more than 500 people who visit or work on the reservation on a daily basis. The ITKN faces many energy challenges, including rising service costs and dozens of power outages annually that impact resident well-being and business activities on Tribal lands. Power service issues are made more challenging by the remoteness of the reservation, which is 20 miles from the nearest town. Despite this, the ITKN has a long history of cultural and economic resilience: Local self-reliance, environmental stewardship, respecting the carrying capacity of the land, and strengthening the community are Tribal communities' traditional strengths. Long-term energy goals for the ITKN are centered around achieving energy sovereignty. Priority actions include: (1) Establishing a Tribal Utility Authority (TUA) to promote social welfare and community development.; (2) Deploying renewable community microgrids with ground-mount solar arrays and sustainable energy storage systems to advance energy sovereignty, resilience, and reliability. To advance these goals, the ITKN partnered with the U.S. Department of Energy's (DOE's) Communities LEAP (Local Energy Action Program) pilot. From August 2022 to March 2024, the ITKN community coalition collaborated with technical assistance providers at DOE's National Renewable Energy Laboratory (NREL) and Sandia National Laboratories to evaluate TUA planning needs and microgrid deployment scenarios. This final report details the Communities LEAP technical assistance process, models and analysis performed, and results.

24 POWER TRANSMISSION AND DISTRIBUTION

The Iowa Tribe of Kansas and Nebraska: Advancing Clean, Resilient, and Sovereign Energy

The Iowa Tribe of Kansas and Nebraska (ITKN) is a federally recognized Native American Tribe located along the Missouri River on the border of northeast Kansas and southeastern Nebraska. There are over 800 residents (Tribal citizens and non-Tribal) who live on the reservation, as well as more than 500 people who visit or work on the reservation on a daily basis. The ITKN faces many energy challenges, including rising service costs and dozens of power outages annually that impact resident well-being and business activities on Tribal lands. Power service issues are made more challenging by the remoteness of the reservation, which is 20 miles from the nearest town. Despite this, the ITKN has a long history of cultural and economic resilience: Local self-reliance, environmental stewardship, respecting the carrying capacity of the land, and strengthening the community are Tribal communities' traditional strengths. Long-term energy goals for the ITKN are centered around achieving energy sovereignty. Priority actions include: (1) Establishing a Tribal Utility Authority (TUA) to promote social welfare and community development.; (2) Deploying renewable community microgrids with ground-mount solar arrays and sustainable energy storage systems to advance energy sovereignty, resilience, and reliability. To advance these goals, the ITKN partnered with the U.S. Department of Energy's (DOE's) Communities LEAP (Local Energy Action Program) pilot. From August 2022 to March 2024, the ITKN community coalition collaborated with technical assistance providers at DOE's National Renewable Energy Laboratory (NREL) and Sandia National Laboratories to evaluate TUA planning needs and microgrid deployment scenarios. This fact sheet provides an overview of the results and outcomes from the Communities LEAP technical assistance process.

Communities Leap