Search NASA⌕ Search

SEARCH · Search NASA

Results for “solar permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Solar and Battery Storage Permitting and Siting Requirements - Solar Prize Round 7 (CRADA Final Report)

The purpose of this research project was to aggregate zoning and permitting data for utility-scale solar PV and battery energy storage systems. The ultimate goal of this collaboration is to lower solar and battery energy storage system soft costs by streamlining regulatory due diligence and reducing the burden of conducting feasibility assessments for solar and storage systems. The below sections describe the specific research completed by NLR (the contractor) in furtherance of the agreement with Vanox (the participant).

14 SOLAR ENERGY↗

Solar and Battery Storage Permitting and Siting Requirements - Solar Prize Round 7 (CRADA Final Report)

The purpose of this project is to identify local zoning ordinances, state permitting requirements, federal regulatory bottlenecks throughout the development process, and the potential to use Large Language Models (LLM) and aggregate permitting and interconnection data for commercial and industrial (C&I), community, and utility-scale solar photovoltaic (PV) and battery storage projects.

14 SOLAR ENERGY↗

Benefits of the SolarAPP+ Online Permitting Software

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems.

automated permitting↗

Wind and solar powered turbine

A power generating station having a generator driven by solar heat assisted ambient wind is described. A first plurality of radially extendng air passages direct ambient wind to a radial flow wind turbine disposed in a centrally located opening in a substantially disc-shaped structure. A solar radiation collecting surface having black bodies is disposed above the fist plurality of air passages and in communication with a second plurality of radial air passages. A cover plate enclosing the second plurality of radial air passages is transparent so as to permit solar radiation to effectively reach the black bodies. The second plurality of air passages direct ambient wind and thermal updrafts generated by the black bodies to an axial flow turbine. The rotating shaft of the turbines drive the generator. The solar and wind drien power generating system operates in electrical cogeneration mode with a fuel powered prime mover.

Wells, I. D.↗

Characteristics of Mini-Magnetospheres Formed by Paleo-Magnetic Fields of Mars

The intensely and non-uniformly magnetized crustal sources generate an effective large-scale magnetic field. In the Southern hemisphere the strongest crustal fields lead to the formation of large-scale mini-magnetospheres. In the Northern hemisphere, the crustal fields are rather weak and there are only isolated mini-magnetospheres. Re-connection with the interplanetary magnetic field (IMF) occurs in many localized regions. This may occur not only in cusp-like structures above nearly vertical field anomalies but also in halos extending several hundreds of kilometers from these sources. Re-connection will permit solar wind (SW) and more energetic particles to precipitate into and heat the neutral atmosphere. Electron density profiles of the ionosphere of Mars derived from radio occultation data obtained by the Radio Science Mars Global Surveyor (MGS) experiment are concentrated in the near polar regions. The effective scale-height of the neutral atmosphere density in the vicinity of the ionization peak has been derived for each of the profiles studied. The effective scale-heights have been compared with the crustal magnetic fields measured by the MGS Magnetometer/Electron Reflectometer (MAG/ER) experiment. A significant difference between the large-scale mini-magnetospheres and regions outside of them has been found. The neutral atmosphere is cooler inside the large-scale mini-magnetospheres. It appears that outside of the cusps the strong crustal magnetic fields prevent additional heating of the neutral atmosphere by direct interaction of the SW. The scale-height of the neutral atmosphere density derived from the experiment with the MGS Accelerometer has been compared with MAG/ER data. The scale-height was found to be usually larger than mean value near the boundaries of potential mini-magnetospheres and around cusps . It may indicate that the paleo-magnetic/IMF field re-connection is characteristic of the mini-magnetospheres at Mars.

N F Ness↗

Developing Consensus Recommendations to Address Challenges with Solar and Solar-Plus-Storage Code Enforcement and Permitting Approvals

The Sustainable Energy Action Committee (SEAC) provides a national platform for collaboration between key stakeholders in code enforcement and permitting for solar and solar-plus-storage projects. The outcomes from SEAC include code and standard proposals, guidance documents, information bulletins and stakeholder education. With this work, permitting and inspection of solar and solar+storage systems uses best practices, enhances safety, and becomes more efficient reducing costs for both jurisdictions and installers.

14 SOLAR ENERGY↗

Go slow to go fast? A review of the impacts of permitting on large-scale solar project development

State and local permitting challenges could impede the ability of large-scale solar (LSS) to meet growing electricity demand in the United States. Here, we review research that explores LSS permitting and its impacts on the pace and scale of LSS project development. Research on LSS permitting is relatively scarce, such that we support our review with research in the context of wind permitting, where appropriate. Further, few studies attempt to rigorously quantify the effects of permitting on the pace and scale of LSS project development. The available evidence allows us to identify various hypotheses and identify gaps for further research. Our review suggests that differences in permitting policies, regulations, and ordinances explain relatively little variation in LSS permitting and development outcomes across jurisdictions, except where jurisdictions implement rules designed to impede LSS. The evidence suggests LSS permitting challenges largely accrue during the implementation of permitting processes. Recent research suggests that community opposition to project development is a key driver of LSS permitting challenges, given that project opponents often use permitting processes to translate opposition into legal action. We call on future researchers to more concretely describe the LSS permitting challenge and to identify the specific actors responsible for implementing solutions.

Community opposition↗

Residential and Small Commercial Solar Photovoltaic and Storage Permitting, Inspection, and Interconnection Timelines: A Retrospective Review (2017-2023)

This report is part of the ongoing Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE) project, led by the National Renewable Energy Laboratory (NREL). The SolarTRACE project utilizes time-stamped project-level data provided by installer-partners to assess nationwide and AHJ- and utility-level PI&I and other solar PV adoption timelines since 2017. Our dataset now covers 22% of residential solar and 33% of residential storage installs in the U.S. since 2017. This report provides an update to our previous 2022 report (Cruce et al., 2022b) and includes: updated 2017 2023 project timelines for residential rooftop solar PV up to 20kW; updated tracking of permitting process changes at nearly 4,000 AHJs nationwide; and first-ever reporting of timelines for residential PV+storage projects up to 20kW.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review: Final Technical Report

The National Renewable Energy Laboratory (NREL) and its project partners have developed the novel Solar Automated Permit Processing plus (SolarAPP+) software platform that provides a flexible, web-based PV-permitting tool for residential systems that can be integrated with existing and complementary software platforms. The main objective of this research is to analyze the implementation of SolarAPP+. Analysis was conducted by identifying the benefits, tradeoffs, and overall performance of SolarAPP+, including achieving its goals of delivering automated, code compliant systems, influencing permitting cycle times, and improving application submittals and/or inspection performance. The NREL team published the results of this analysis in annual SolarAPP+ Performance Review technical reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

5 Easy Steps to SolarAPP+ Adoption

The Solar Automated Permit Processing Plus (SolarAPP+) software is an online platform that provides plan review and instantly issues permits for code-compliant residential photovoltaic (PV) systems. Here's how your jurisdiction can get started.

automated permitting↗

Application of solar max ACRIM data to analyze solar-driven climatic variability on Earth

Terrestrial climatic effects associated with solar variability have been proposed for at least a century, but could not be assessed quantitatively owing to observational uncertainities in solar flux variations. Measurements from 1980 to 1984 by the Active Cavity Radiometer Irradiance Monitor (ACRIM), capable of resolving fluctuations above the sensible atmosphere less than 0.1% of the solar constant, permit direct albeit preliminary assessments of solar forcing effects on global temperatures during this period. The global temperature response to ACRIM-measured fluctuations was computed from 1980 to 1985 using the NYU transient climate model including thermal inertia effects of the world ocean; and compared the results with observations of recent temperature trends. Monthly mean ACRIM-driven global surface temperature fluctuations computed with the climate model are an order of magnitude smaller, of order 0.01 C. In constrast, global mean surface temperature observations indicate an approx. 0.1 C increase during this period. Solar variability is therefore likely to have been a minor factor in global climate change during this period compared with variations in atmospheric albedo, greenhouse gases and internal self-inducedoscillations. It was not possible to extend the applicability of the measured flux variations to longer periods since a possible correlation of luminosity with solar annual activity is not supported by statistical analysis. The continuous monitoring of solar flux by satellite-based instruments over timescales of 20 years or more comparable to timescales for thermal relaxation of the oceans and of the solar cycle itself is needed to resolve the question of long-term solar variation effects on climate.

Hoffert, M. I.↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Adaptation of solar sounding rocket payloads for Shuttle

The advent of the Shuttle will permit small solar sounding rocket class payloads to be used for orbital applications as a sub satellite. Solutions to such problems as thermal protection, deployment and retrieval and Shuttle bay storage will be presented. Adapting sounding rocket hardware such as solar telescopes, solar attitude control systems and data acquisition modules along with extending power and control gas requirements is discussed. This resulting hardware may be used either in a sounding rocket or Shuttle payload. This paper will combine the solar sounding rocket quick reaction, low cost techniques with the Shuttle Transportation System.

Windsor, R. M.↗

County Land-Use Regulations for Solar Energy Development in Colorado

We present a survey of county-level policies on ground-mounted solar development across Colorado, including both solar-specific ordinances as well as general land-use code that might be applicable in counties without solar-specific policies. This report provides an accessible reference for stakeholders interested in identifying counties with particular regulations or in analyzing the diversity of regulations across Colorado. We defined a set of search criteria to find information on solar definitions and classifications, permitting processes, and use-specific requirements in each of Colorado's 64 counties. With those criteria, we reviewed relevant ordinances, land-use code, and comprehensive and master plans. If any uncertainties were identified, we contacted county officials for clarification. The findings are categorized and mapped to illustrate the distribution of key policies adopted across Colorado's counties on the following topics: solar definitions, solar siting policy documentation, categorization of PV systems for permitting, 1041 permitting, solar on agricultural land, panel height restrictions, fencing requirements, vegetation management, visual impacts, decommissioning plans, and financial assurance for decommissioning. Additionally, we identify and discuss policies that might impact the deployment of agrivoltaics, a dual land use combining both agriculture and solar on the same land, which might not fit neatly in existing zoning definitions and solar-specific regulations.

14 SOLAR ENERGY↗

The Mercury Dual Orbiter mission

The Mercury Orbiter (MeO) will carry out a full range of particles, fields, and planetary imaging science at Mercury. Present mission plans call for a launch in 1999 with a flight time of about 4.5 years. By means of multiple Venus and Mercury gravitational assists, the mission can be accomplished with present U.S. launch vehicles and a very large payload can be placed in orbit around Mercury. The dual-spacecraft concept will permit outstanding scientific study of solar cosmic rays and the solar wind throughout the inner heliosphere from 0.3 AU to 1.0 AU. Modest enhancements to the planned magnetospheric instruments and utilization of onboard solar instruments will permit unique investigation of solar particle acceleration and transport with the MeO spacecraft.

Baker, D. N.↗

Hydrogen, helium, and other solar-wind components in lunar soil - Abundances and predictions

The lack of a shielding atmosphere on the moon permits solar-wind particles to impinge upon the lunar soil and become implanted into the various phases which comprise the soil. Relatively large quantities of solar-wind implanted hydrogen (50-100 ppm) and helium (10-50 ppm) are present. The measured parameter of I(s)FeO, a direct indicator of maturity and exposure age, can be used as a first approximation to predict the abundances of many solar-wind components in the soils. However, because ilmenite acts as a 'sponge' for the retention of certain elements, the TiO2 content of the soil is a better indicator for hydrogen and helium contents.

Taylor, Lawrence A.↗

Measuring solar wind velocity with spacecraft phase scintillations

The measurement of spacecraft phase scintillations with a coherent dual-frequency radio system permits solar-wind velocity measurements based on multiple-station phase scintillations. Advantages of measuring solar-wind velocity on the basis of multiple-station phase scintillations are discussed with respect to amplitude scintillations. These advantages include the ability to carry out observations closer to the sun, a much wider range of possible baselines, a lower S/N ratio for long-baseline phase measurements, and a wider range of antenna sizes and receiver noise temperatures. NASA antennas particularly suitable for these measurements are identified, and observations with the coherent S/X radio system aboard various NASA spacecraft intended for deep-space missions are proposed.

Woo, R.↗