Smart Contracts for Power Grid Applications Using the Advanced DLT Cyber Grid Guard Testbed

In this study is presented two power system applications with distributed ledger technology (DLT) and smart contracts (SC) that were assessed in a Cyber-Grid-Guard System (CGGS) advanced testbed, with protective relays, power meters, communication devices, DLT devices, synchronized time source, clock displays and real time simulator. This CGGS testbed was set in the Advanced Protection Lab, 252 lab space of the Grid Research Integration and Deployment Center (GRID- C), at Oak Ridge National Laboratory. In power grids, customer-owned distributed energy resources (DERs) are more frequent than in the past, and the numbers of points of interconnection (POI) with customer-owned DERs have increased. Disruptive operation from DERs presents a risk to grid operations, and protective relays located at the POI are used to isolate out-of-tolerance or poorly behaving of DERs. Ensuring the integrity of data from the relays at the POI, and DLT could enhance the security of the power grids. The first application is a SC to define and control the allowable total power factor (TPF) of the DER (wind farm) output, and the terms of the SC are implemented using DLT with a CGGS for a customer-owned DER. The TPF SC was implemented by the CGGS using DLT. The experimental model was performed with a real-time simulator using a CGGS and relay in-the-loop. The data collected from the CGGS were used to execute the TPF SC. The TPF limits were between +0.9 and +1.0, and the breakers’ operation in the POI was controlled by the relay using the SC. The events were collected from the real-time simulator, CGGS, and SEL 700GT relay to validate a successful application of the TPF SC using DLT. The second application is a SC to measure and control the allowable voltage service limits (VSL) by the CGGS using DLT. The tests were performed by using a real-time simulator, CGGS and relay in-the-loop. The data was collected from the CGGS that executed the SC. The main constraints were defined based on ANSI C84.1 service voltage limits, and the operation of the breakers in the POI. The events were collected from the CGGS, and SEL 700GT relay to assess a successful operation of the VSL SC using DLT.

24 POWER TRANSMISSION AND DISTRIBUTION

Technical Learning and Integration of Interns in Advanced Protection Lab Space: Enhancements to Testbed and Experiments to Improve Workflows for Producing Datasets

This report presents a successful technical learning integration of student interns in the Advanced Protection Laboratory space, located in the Grid Research Integration and Deployment Center (GRID-C) at the Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL). The Advanced Protection Laboratory was created for the primary goal of supporting DOE’s research projects and technical staff at ORNL. As a secondary goal, the space was used for collaborating with ORNL’s intern programs, providing support to the lab’s mentors and student interns. In 2024, three student interns spent a summer in the Advanced Protection lab space and were involved in the DarkNet Distributed Ledger Technology (DLT) project. The students had a great opportunity to gain hands-on experience with communication and protective relay equipment focused on information technology, data analytics, and cybersecurity. Experiences in the lab space with real equipment and software integration offer education and professional development for students, which is especially important because of a need in the energy industry to recruit highly skilled power and communication engineers.

42 ENGINEERING

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI