Hydrothermal corrosion of PVD and cold spray Cr-coatings on Zircaloy-4 in hydrogenated and oxygenated LWR coolant environments
Not provided.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not provided.
Cold spray deposition of Inconel nickel alloys has emerged as a promising strategy for mitigating cavitation erosion in hydropower facilities. Most prior developments employ helium (He) as the carrier gas because it enables high particle velocities and the formation of dense coatings. However, He is nearly two orders of magnitude more expensive than nitrogen (N2), which limits its widespread adoption in the hydropower sector. Although He-based cold spray can be justified for high value repairs, the lower cost and broad availability of N2 make it an attractive alternative. This study assesses the feasibility of N2-based cold spray of Inconel 625 powders for hydropower applications. Cavitation erosion testing shows that He-based coating exhibits cavitation resistance of ~398% relative to the 304L stainless steel (SS304L) substrate. In contrast, N2-based coating shows substantially lower cavitation resistance, reaching only ~69% of the SS304L substrate, even when higher carrier gas temperature and pressure are applied. When the Inconel 625 powder size is reduced from 44 to 22 µm under N2-based cold spray conditions, cavitation resistance increases significantly to ~148% of the SS304L substrate. Additional improvement can be obtained by incorporating fine chromium carbide powders into the feedstock, resulting in cavitation resistance of ~172% of the SS304L substrate. Overall, with optimized feedstock design, N2-based cold spray offers a practical and cost-effective approach for producing cavitation resistant coatings on hydropower components, although He-based cold spray continues to deliver higher cavitation resistance.
The work performed under this agreement before the No/Go decision amounted to the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5.Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability); 7. Go / No-Go, Purchase Orders, Equipment build & commissioning next All other future task were not completed because during the Go /No-Go decision it was confirmed this project was a "No-Go" and did not proceed past BP1; these included the following: 1. Preliminary manufacturing requirements defined by business sensitivity, baseline processes & risk assessment; 2. Process & materials development, in-line gauge exploration, and preliminary automation work used to reduce risk & further refine equipment specifications; 3. “Request for Quote” issued to multiple suppliers for major equipment; 4. Application specific equipment, hardware, and fixturing will be more beneficial to fabricate inhouse; 5. Current proposals & estimates meet cycle time, capital spend, & direct labor; space is on target but requires awareness; 6. Team will continue to explore opportunities to reduce risk (dry time, traceability) In final preparation of the termination of the Automation of Solid Oxyde Electrolyzer Cell (SOEC) & Stack Assembly, Cummins has purchased no equipment with government funds, and there is no government-owned property in Cummins possession related to this project. Minimal labor and travel were completed and paid. This acts as the Final technical report and concludes our business with DOE on this grant.