Search NASA⌕ Search

SEARCH · Search NASA

Results for “stakeholder training”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Web-based Decision Support System Tools: the Soil and Water Assessment Tool Online Visualization and Analyses (SWATOnline) and NASA Earth Observation Data Downloading and Reformatting Tool (NASAaccess)

The current influx of climate related information required scientists to communicate their findings to decision makers in governments, disaster preparedness organizations, and the general public. The Soil and Water Assessment Tool (SWAT) is a powerful modelling tool that allows scientists to simulate many of the physical processes involved in the water cycle. This article presents the design, methods and development efforts to overcome some of the limitations of the previously developed SWAT visualization software programs by creating a set of modular web applications that can be duplicated, customized, and run. Moreover, this article features a web application development tool for climate data retrieval. The NASAaccess fetches, extracts and reformats climate data from the National Aeronautics and Space Administration servers and outputs data compatible with hydrological models. This work has the potential to increase the SWAT's model impact on non-technically trained stakeholders and decision makers charged with water and climate management.

Tethys↗

Achieving Maximum Integration Utilizing Requirements Flow Down

A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.

Archiable, Wes↗

Overview of the Exploration Exercise Device Validation Study Plans

The NASA has determined that a multi-functional exercise device will be developed for use as an exercise device during exploration missions. The device will allow for full body resistance and metabolic exercise necessary to minimize physiological losses during space flight and to maintain fitness necessary to perform critical mission tasks. Prior to implementation as an exercise device on an Exploration vehicle, there will be verification and validation testing completed to determine device efficacy at providing the necessary training stimuli to achieve desired goals. Because the exploration device will be new device that has yet be specified, specific Verification and Validation (V&V) protocols have yet to be developed. Upon delivery of an exploration exercise device training unit, stakeholders throughout NASA will develop V&V plans that include ground-based testing and testing on the International Space Station (ISS). Stakeholders will develop test protocols that include success criterion for the device. Ground tests will occur at NASA Johnson Space Station prior to flight testing. The intents of the ground tests are to allow crew, spaceflight medicine, science, engineering, Astronaut Strength, Conditioning, and Reconditioning staff, and others to gain experience in the best utilization of the device. The goal is to obtain an evidence base for recommending use of the device on the ISS. The developed protocol will be created to achieve multiple objectives, including determining if the device provides an adequate training stimulus for 5th - 95th percentile males and females, allows for exercise modalities that protect functional capability, and is robust and can withstand extensive human use. Although protocols are yet to be determined, current expectations include use of the device by test subjects and current crew in order to obtain quantitative and qualitative feedback. Information obtained during the ground tests may be used to influence device modifications during design iterations. Assuming successful ground tests, the device will be installed on the ISS for testing during space flight. Spaceflight testing is envisioned to include an activation and checkout (ACO) phase and a V&V phase. During the ACO phase, 1-2 crewmembers will exercise with the device to ensure proper function. ACO is expected to last multiple months because of the many modes and methods of exercise that need to be assessed. However, the goal is to complete the ACO as quickly as possible. Once successful ACO occurs, the crew will be free to use the device for normal exercise pending concurrence from stakeholders. V&V tests on the ISS will ideally consist of crew using the device for all of their exercise for an entire mission. Exercise prescriptions will be supplied that replicate expected prescriptions during exploration missions. Crew that are not enrolled in the V&V studies would be also free to use the device as their schedule permits. As experience is gained by users, exercise protocols could change. The intent of all V&V testing is to ensure that all have thorough understanding of experience at optimizing device capability

DeWitt, J. K.↗

Earth Independent Medical Operations (EIMO) Training Technical Interchange Meeting, 26th October 2023: Background and Summary of Discussion

On 26th October 2023, ExMC convened a panel of Subject Matter Experts (SMEs) from NASA, broadly representing Headquarters, the Human Research Program, Medical Operations, the Human Health and Performance Directorate at JSC, the Health and Medical Technical Authority, the Flight Operations Directorate, and representation from other Centers including: Ames Research Center (ARC), and Glenn Research Center (GRC). Representatives from the Canadian Space Agency also participated in this TIM. In addition, SMEs from industry included representation from the following entities: Axiom Space, Space Exploration Technologies Corporation, Level Ex, Shiny Box Interactive. Additional SMEs from academia included: University of Houston, Touro University, Weill Cornell Medical College and the Translational Research Institute for Space Health at Baylor College of Medicine. This group of stakeholders discussed the training issues related to facilitating EIMO. Sub-topics for this discussion included the following: - Pre-launch medical curriculum development - Ground-based training on medical hardware - Dental health - Behavioral health - Telemedicine - Just-in-time training - Simulation-based training (extended reality)

CMO Training↗

CROSS: A GDSS for the Evaluation and Prioritization of Engineering Support Requests and Advanced Technology Projects at NASA

Objective evaluation and prioritization of engineering support requests (ESRs) is a difficult task at the Kennedy Space Center (KSC) Shuttle Project Engineering Office. The difficulty arises from the complexities inherent in the evaluation process and the lack of structured information. The purpose of this project is to implement the consensus ranking organizational support system (CROSS), a multiple criteria decision support system (DSS) developed at KSC that captures the decision maker's beliefs through a series of sequential, rational, and analytical processes. CROSS utilizes the analytic hierarchy process (AHP), subjective probabilities, entropy concept, and maximize agreement heuristic (MAH) to enhance the decision maker's intuition in evaluation ESRs. Some of the preliminary goals of the project are to: (1) revisit the structure of the ground systems working team (GWST) steering committee, (2) develop a template for ESR originators to provide more comple and consistent information to the GSWT steering committee members to eliminate the need for a facilitator, (3) develop an objective and structured process for the initial screening of ESRs, (4) extensive training of the stakeholders and the GWST steering committee to eliminate the need for a facilitator, (5) automate the process as much as possible, (6) create an environment to compile project success factor data on ESRs and move towards a disciplined system that could be used to address supportability threshold issues at the KSC, and (7) investigate the possibility of an organization-wide implementation of CROSS.

Tavana, Madjid↗

Transitioning TEMPO Data for Air Quality Management Applications at the NASA SPoRT Center

The TEMPO mission has been observing air pollutants every hour during the daytime across its Field of Regard (FoR) covering greater North America since First Light on August 2, 2023. The highly anticipated public release of TEMPO data occurred on May 20, 2024, consisting of level 2 and level 3 trace gas data products of nitrogen dioxide, formaldehyde, and ozone. The NASA SPoRT Center is developing value-added products and tools to support the TEMPO mission and Early Adopters program with special attention on stakeholder from air agencies. One component of our work is focused on evaluating the TEMPO products over stakeholder target areas using Pandora and surface monitor observations to characterize the uncertainties and develop best practices for processing and analyzing TEMPO data. Methods for oversampling TEMPO data to 1 km resolution are being applied over the target areas to resolve fine-scale emission sources and pollutant gradients. Machine learning techniques using TEMPO, surface monitor, and model data to estimate surface-level nitrogen dioxide concentrations are being developed over the target areas. A SPoRT viewer for TEMPO has been launched for providing visualizations of the TEMPO products and an ArcGIS dashboard is being designed for enabling air agency stakeholders to efficiently analyze TEMPO data. Training materials including user guides are being developed to ensure the effective and sustained use of TEMPO data at our stakeholder agencies. One major goal of our TEMPO initiatives at SPoRT is to better enable the inclusion of TEMPO data in air quality management applications such as exceptional event demonstrations through our close engagement with stakeholders. This talk will provide an update on our SPoRT activities and showcase use cases of TEMPO data for monitoring different emission sources including wildland fire smoke.

Air Quality↗

Making Better Use of Satellite Data: The Satellite Needs Working Group

The U.S. Group on Earth Observations (USGEO) initiated in 2016 the Satellite Needs Working Group (SNWG) to identify and communicate the Earth observation needs of U.S. federal agencies. The SNWG identifies such needs through a biennial survey followed by interviews and follow-up discussions by the satellite Earth data providers of the U.S. Government: the National Aeronautics and Space Administration (NASA), the National Oceanic and Atmospheric Administration (NOAA), and the U.S. Geological Survey (USGS). Solutions and services are identified that leverage current or upcoming satellite missions to meet the identified needs; implementation of services that are estimated to significantly increase the level of satisfaction of multiple U.S. agencies are funded by NASA. The SNWG process has resulted in the implementation of numerous services that have impacted operations of not only U.S. agencies but of academic and international institutions as well. Notable examples include the Harmonized Landsat Sentinel-2 project that leverages European Space Agency (ESA) and NASA satellite assets to generate a global, analysis-ready, surface reflectance product with a temporal resolution of two days; the Airborne Data Management Group that curates and provides access to relevant resources, information and data from existing and past NASA field campaigns; and the Dynamic Surface Water Extent product which consists of harmonized but independent water extents derived from both from optical and radar data. These and other products are hosted at the NASA Distributed Active Archive Centers (DAACs) for free and open access. The SNWG Management Office at NASA’s Interagency Implementation and Advanced Concepts Team (IMPACT) manages the implementation of selected solutions and, importantly, NASA’s response to the needs of federal agencies through a Stakeholder Engagement Program. The impact of implemented services and solutions is hampered without efforts to build capacity around the use of the services. The Stakeholder Engagement Program ensures relevant training and outreach to SNWG agencies in collaboration with each solution implementation team.

remote sensing↗

Development of TEMPO Products and Tools to Support Air Quality Management Decisions

The TEMPO mission has been observing air pollutants every hour during the daytime across its Field of Regard (FoR) covering greater North America since First Light on August 2, 2023. The highly anticipated public release of TEMPO data occurred on May 20, 2024, consisting of level 2 and level 3 trace gas data products of nitrogen dioxide, formaldehyde, and ozone. Our project at the NASA SPoRT Center is developing value-added products and tools to support the TEMPO mission and Early Adopters program with special attention on the air quality management community. The initial focus of this project is evaluating the TEMPO products over stakeholder target areas using Pandora and surface monitor observations. Methods for oversampling TEMPO data to 1 km resolution are being applied over the target areas to resolve fine-scale emission sources and pollutant gradients. Machine learning techniques using TEMPO, surface monitor, and model data to estimate surface-level nitrogen dioxide concentrations are being developed over the target areas. Our SPoRT viewer has been updated to include visualizations of the TEMPO products and an ArcGIS dashboard is being designed for enabling air quality management stakeholders to efficiently analyze TEMPO data. Training materials including user guides are being developed to ensure the effective and sustained use of TEMPO data in air quality management applications. The major outcome of this project is to support the inclusion of TEMPO data in exceptional event demonstrations by active engagement with stakeholders and ultimately enable more informed air quality management decisions in the future. This talk will provide an update on our project activities and showcase use cases of TEMPO data for monitoring different emission sources including wildland fire smoke.

air quality↗

Addressing User Needs through the Stakeholder Engagement Program

Every two years, the Satellite Needs Working Group (SNWG), an initiative of the U.S. Group on Earth Observations (USGEO), surveys federal agencies to pinpoint their satellite Earth observation needs. For each expressed need, NASA-led assessment teams coordinate with the agencies to devise solutions. Solutions can include existing or modified data products as well as the construction of new data products and technologies, such as the Harmonized Landsat Sentinel-2 (HLS) product and the Catalog of Archived Sub-Orbital Earth Science Investigations (CASEI). To facilitate adoption of new data products and technologies, the SNWG Management Office’s Stakeholder Engagement Program (SEP) was established. The program’s primary goals are to respond to training and capacity building needs expressed by agencies and to encourage engagement from stakeholders as SNWG solutions are developed. To serve these needs, SEP has developed the following: an SNWG Solutions Earthdata webpage, an SEP Earthdata webpage, and an Earthdata Search Portal for SNWG products. These avenues provide assistance to users from all backgrounds and levels of expertise as well as publicize the ongoing efforts of SNWG solutions. In addition, the SEP is also collaborating with NASA’s Short-term Prediction Research and Transition (SPoRT) Center to develop user-driven applications for SNWG products leveraging stakeholder input. This presentation will provide an overview of the SEP, highlight the resources currently available to users, and describe ongoing efforts to address the needs of users, so SNWG products can be better implemented into scientific workflows.

Jenny Wood↗

Dissertation Defense: Three Papers on Organizational Decision-Making and Change at NASA Goddard Space Flight Center

This is a three-paper dissertation that responds to a call for empirical research on stakeholder influence in the implementation of evaluation recommendations. The literature is consistent but mostly theoretical: stakeholder participation should positively influence and increase the probability of implementation (see e.g., Christie, 2011; Cousins & Earl, 1992; Fetterman, 2004). In response, I use two Goddard Space Flight Center engineering technical training and development programs to build a causal argument supporting my proposition that stakeholder influence in the logic modeling process impacts organizational decision-making and change. I first introduce the logic modeling process as a tool to involve stakeholders in program and evaluation design (paper 1); then use the data collection process to implement the collaboratively constructed logic model outcomes (paper 2); and, finally, I triangulate the data using the Toal (2009) Evaluation Involvement Scale (paper 3). I do this to “increase the validity of the findings” (Noble & Heale, 2019, p. 67) and to garner potential mechanisms. I found that stakeholder participation in the logic modeling process positively influenced the use of data to inform recommendations which in turn positively influenced implementation of evaluation recommendations. I identified the process itself as the mechanism and the key decision points as links or influencers. Potential factors included power and interest (measured by role) and time-on-job.

organizational decision-making↗

The Impact (Influence) of Stakeholder Participation in the Logic Modeling Process: A Case Study from NASA Goddard Space Flight Center

This is a three-paper dissertation that responds to a call for empirical research on stakeholder influence in the implementation of evaluation recommendations. The literature is consistent but mostly theoretical: stakeholder participation should positively influence and increase the probability of implementation (see e.g., Christie, 2011; Cousins and Earl, 1992); Fetterman, 2004). In response, I use two Goddard Space Flight Center engineering technical training and development programs to build a causal pathway argument supporting my proposition that stakeholder influence in the logic modeling process impacts organizational decision-making and change. I first introduce the logic modeling process as a tool to involve stakeholders in program and evaluation design (paper 1), then use the data collection process to implement the collaboratively constructed logic model outcomes (paper 2), and finally, I triangulate the data using the Toal (2009) Evaluation Involvement Scale (paper 3). I do this to “increase the validity of the findings” (Noble & Heale, 2019, p. 67) and to garner potential mechanisms. I found that stakeholder participation in the logic modeling process positively influenced the use of data to inform recommendations which in turn positively influenced implementation of evaluation recommendations. I identified the process itself as the mechanism and the key decision points as links or influencers. Potential factors included power and interest (measured by role) and time-on-job.

Organizational Decision-Making↗

Lessons Learned from NASA Goddard Space Flight Center’s Product Development Lead Training Schedule and Cost Development Workshop: Continuous Improvement

This presentation provides a status of the Goddard Space Flight Center (GSFC) effort to increase foundational knowledge of Product Development Leads (PDLs) in schedule and cost management including earned value management (EVM). In 2012, GSFC’s Engineering and Technology Directorate (ETD) implemented an in-house training program to prepare PDLs for managing the technical, cost, schedule, and risk aspects of spaceflight systems to meet their subsystem commitments. Developed in-house, the PDL training program provides an integrated approach to requirements development, risk, schedule and cost management, EVM, performance tracking, and other areas. The program has been held twice yearly since its inception with 531 participating and 451 completing the curriculum. In 2017, the program won the Robert H. Goddard award for Quality and Process Improvement. Program development and evolution were presented in the 2018 NASA Schedule and Cost Symposium. The presentation was so well received that this year we focus on one workshop within the program: Schedule and Cost Development, including EVM. We examine the on-going logic modeling process and how participant and stakeholder data influence workshop content and design, and how the disciplines of schedule and cost contribute to mission success. In this presentation we refresh you on how the approach integrates lecture, small group discussion, estimating, case study exercises, and problem solving. We update you on the data collected from participants and stakeholders, and we discuss how we use these data to measure training effectiveness. Specific topics include: • How the logic model is used as the backbone for continuous program improvement, • How feedback influences implementation and curriculum updates, • How data collection and analysis inform workshop content and development, including participant discoveries of EVM data, • How including the resource analyst and planner in the product development team supports project success.

Lessons Learned↗

Developing Compelling and Science-Focused Mission Concepts for NASA Competed Mission Proposals

Since the mid 1990s, NASA has used a competitive selection process to initiate new mission concepts. These competed missions are motivated by high-value science with low implementation and cost risks. Selectable mission concepts require highly focused science approaches—delivering high quality science “on a budget.” Prospective Principal Investigators (PIs) need to convince NASA that the science they are proposing is both compelling and has high programmatic value. Unfortunately, many of these PIs are not trained in the communication skills needed for “selling” a mission concept to stakeholders. This requires a proposal that presents an investigation in an accessible, relatable, authentic, and believable way. It is the onus of the proposing PI to convince NASA of the value of their particular science concept in a competitive environment, addressing any pre-conceived notions reviewers might have about the concept’s value, complexities, urgency, and other impediments to understanding.The importance of this can be seen in the NASA-sponsored PI Launchpad (Nov 2019 & Jun 2021)1 which was designed to help early career scientists understand the skills, methods, processes, and resources needed to develop compelling science mission concepts; as well as in JPL’s update to their concept maturity model (Jan 2020) which included the addition of Story and Strategy dimensions. This paper provides guidance to assist prospective PIs in developing compelling, science-focused mission concepts. It will provide direction for communicating concepts more clearly to make science objectives more relatable to both reviewers and a broader audience, improving the probability of selection.

Ziemer, John↗

Using Board Games as Subject Matter for Developing Expertise in Model-Based Systems Engineering

As more organizations transition from traditional document-centric systems engineering to a model-based approach, many are challenged to train their staff in new languages, tools, and methodologies, while managing the expectations of stakeholders and their expected model outcomes. In particular, challenges associated with learning a new modeling language and developing skills in the 'art' of modeling present organizations with formidable obstacles to realizing this transition. This paper hypothesizes that systems engineers may more readily learn how to correctly model with SysML, and develop intuition about the art of modeling and using patterns, if their learning references a commonly and thoroughly-understood subject, such as a board game. This paper presents a case for the use of board games as subject matter for new modelers. It demonstrates the concept with a sample model of Hasbro's popular board game, Monopoly, and discusses the limitations of this approach and potential adaptations that may broaden the applicability of the learned skills to projects. Finally, results from a small feasibility assessment and concepts for more formal study to evaluate the hypothesis are presented.

Model-Based Systems Engineering↗

Using Board Games as Subject Matter for Developing Expertise in Model-Based Systems Engineering

As more organizations transition from traditional document-centric systems engineering to a model-based approach, many are challenged to train their staff in new languages, tools, and methodologies, and manage the expectations of stakeholders and their expected model outcomes. In particular, challenges associated with learning a new modeling language and developing skills in the 'art' of modeling present organizations with formidable obstacles to realizing this transition. This paper hypothesizes that systems engineers may more readily learn how to correctly model with SysML, and develop intuition about the art of modeling and using patterns, if their learning references a commonly and thoroughly-understood subject matter, such as a board game. This paper presents a case for the use of board games as subject matter for new modelers, demonstrates the concept with a sample model of Hasbro's popular board game, Monopoly, and discusses the limitations of this approach and potential adaptations that may broaden the applicability of the learned skills to projects.

Systems Engineering↗

Initial Testing the Exploration Extravehicular Mobility Unit (xEMU) in Lunar Environment Simulation at the Neutral Buoyancy Lab (NBL) in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Tasked by the new Extravehicular Activity and Human Surface Mobility Program(EHP), a team of stakeholders from engineering and flight operations worked together to test the Exploration Extravehicular Mobility (xEMU) in the Neutral Buoyancy Lab(NBL) simulating the lunar environment. The NBL is a pool in which astronauts are typically trained to complete simulated International Space Station (ISS) EVA tasks in a neutral weigh-out. The overall focus for this test series was evaluating how well the NBL could be used as an effective simulated environment for Artemis lunar EVAs. New NBL support hardware was manufactured to support this test series and update the interfaces to be more representative of xEMU hardware such as a new NBL Portable Life Support System(PLSS)mock-up and umbilical, lights and cameras, and display and control unit (DCU).To simulate the 1/6th-gravity (1/6-g) environment, extra weights were added around the suit to create an accurate center of gravity representation. The Partial Gravity Weigh-out Stand (PGWS) predicted where and how much weight would be required for the 1/6th-G simulation and predicted the center of gravity placement. After the weigh-out attempt was completed, the suited participant would complete a set of directed tasks such as kneeling, object pick-up, and walking to evaluate the weigh-out. To create the lunar environment, sand, boulders, and ramps were added to the pool floor. If time allowed after weigh-out was determined acceptable, the flight operations team would direct the suited participants to complete simulated Artemis EVA tasks using flight-like tools and tool cart. The team also evaluated turning out the overhead lights in the NBL for a portion of some of the test runs and using a solar simulator to create amore realistic lunar south pole lighting environment. The test series completed one unmanned test and nine manned tests. With four of the tests, dual xEMU suited operations were completed with subjects in both the small and large xEMU sizes. Overall, the NBL was able to create an acceptable lunar landscape and ability to have two subjects work side by side in pressurized xEMUs which currently cannot be achieved in other test environments. Achieving a stable 1/6th-G lunar weigh-out and clear, consistent dual suit communications was a challenge for this series. Future work is planned to continue to improve this simulation environment.

spacesuit↗

Initial Testing of the Exploration Extravehicular Mobility Unit (xEMU) in Lunar Environment Simulation at the Neutral Buoyancy Lab (NBL) in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Tasked by the new Extravehicular Activity and Human Surface Mobility Program(EHP), a team of stakeholders from engineering and flight operations worked together to test the Exploration Extravehicular Mobility (xEMU) in the Neutral Buoyancy Lab(NBL) simulating the lunar environment. The NBL is a pool in which astronauts are typically trained to complete simulated International Space Station (ISS) EVA tasks in a neutral weigh-out. The overall focus for this test series was evaluating how well the NBL could be used as an effective simulated environment for Artemis lunar EVAs. New NBL support hardware was manufactured to support this test series and update the interfaces to be more representative of xEMU hardware such as a new NBL Portable Life Support System(PLSS)mock-up and umbilical, lights and cameras, and display and control unit (DCU).To simulate the 1/6th-gravity (1/6-g) environment, extra weights were added around the suit to create an accurate center of gravity representation. The Partial Gravity Weigh-out Stand (PGWS) predicted where and how much weight would be required for the 1/6th-G simulation and predicted the center of gravity placement. After the weigh-out attempt was completed, the suited participant would complete a set of directed tasks such as kneeling, object pick-up, and walking to evaluate the weigh-out. To create the lunar environment, sand, boulders, and ramps were added to the pool floor. If time allowed after weigh-out was determined acceptable, the flight operations team would direct the suited participants to complete simulated Artemis EVA tasks using flight-like tools and tool cart. The team also evaluated turning out the overhead lights in the NBL for a portion of some of the test runs and using a solar simulator to create amore realistic lunar south pole lighting environment. The test series completed one unmanned test and nine manned tests. With four of the tests, dual xEMU suited operations were completed with subjects in both the small and large xEMU sizes. Overall, the NBL was able to create an acceptable lunar landscape and ability to have two subjects work side by side in pressurized xEMUs which currently cannot be achieved in other test environments. Achieving a stable 1/6th-G lunar weigh-out and clear, consistent dual suit communications was a challenge for this series. Future work is planned to continue to improve this simulation environment.

spacesuit↗

A Strategic Approach to Medical Care for Exploration Missions

Exploration missions will present significant new challenges to crew health, including effects of variable gravity environments, limited communication with Earth-based personnel for diagnosis and consultation for medical events, limited resupply, and limited ability for crew return. Providing health care capabilities for exploration class missions will require system trades be performed to identify a minimum set of requirements and crosscutting capabilities which can be used in design of exploration medical systems. Current and future medical data, information, and knowledge must be cataloged and put in formats that facilitate querying and analysis. These data may then be used to inform the medical research and development program through analysis of risk trade studies between medical care capabilities and system constraints such as mass, power, volume, and training. These studies will be used to define a Medical Concept of Operations to facilitate stakeholder discussions on expected medical capability for exploration missions. Medical Capability as a quantifiable variable is proposed as a surrogate risk metric and explored for trade space analysis that can improve communication between the medical and engineering approaches to mission design. The resulting medical system approach selected will inform NASA mission architecture, vehicle, and subsystem design for the next generation of spacecraft.

Antonsen, E.↗