Search NASA⌕ Search

SEARCH · Search NASA

Results for “statu”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Study of Bronze Statues “John the Baptist” and “Dancing Cupid” from the Collections of the Pushkin State Museum

Bronze statues “John the Baptist” and “Dancing Cupid” from the collections of the Pushkin State Museum of Fine Arts have been investigated at the National Research Centre “Kurchatov Institute.” These statues were previously damaged in fire. Before carrying out restoration, it was necessary to perform their complex study, including identification of statue materials; elemental and phase analysis of contaminations; estimation of the state of surfaces and internal parts; and detection of technological elements, as well as hidden defects, corroded parts, and cracks. To this end, scanning electron microscopy with X-ray microanalysis, synchrotron radiation diffraction, and neutron radiography and tomography have been used.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Porous Titanium Parts Fabricated by Sintering of TiH{sub 2} and Ti Powder Mixtures

A new simple powder metallurgy process by sintering TiH{sub 2} powders was used to manufacture porous Ti components. The effects of the processing parameters (pressure of cold isostatic pressing and sintering temperature) and the TiH{sub 2}/Ti ratio in the powder mixtures on the impurities, the linear shrinkage and the pore properties (including overall and open porosities) were comprehensively determined. The addition of TiH{sub 2} as a reactant has been found beneficial for the synthesis of porous Ti components. The formation mechanisms of pores were demonstrated based on the dehydrogenation process of TiH{sub 2} during sintering, resulting in highest reactivity due to the “in statu nascendi” generation of the metal. In addition, the hardness and corrosion resistance of all the sintered samples were evaluated, related to the overall and open porosities. As a result, an optimal composition of Ti-40 wt.% TiH{sub 2} was defined, as its maximum open porosity was about 23%.

36 MATERIALS SCIENCE↗

Closure Report for the Project Shoal Area: Subsurface Corrective Action Unit 447 Shoal,Nevada, Site

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has prepared this Closure Report for subsurface Corrective Action Unit (CAU) 447 at the Shoal, Nevada, Site, which was formerly called the Project Shoal Area. The Shoal site was the location of an underground nuclear test in 1963 that resulted in residual radionuclide contamination at the detonation depth of 1211 feet (ft) (DOE 2015a). The environmental restoration process and Corrective Action strategy are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) statues and regulations. Responsibility for the environmental site restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The Shoal site is south of U.S. Highway 50, approximately 30 miles southeast of Fallon, in Churchill County, Nevada (Figure 1). The site was selected for underground nuclear testing in 1961, as part of the Vela Uniform Program. Vela was a research and development program directed toward locating, detecting, and identifying underground and high-altitude nuclear detonations. The Vela Uniform program was specific to underground detonations (AEC 1964). The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States’ ability to detect, identify, and locate underground nuclear detonations. The underground nuclear test at Shoal was a joint effort between the U.S. Department of Defense (DOD) and the U.S. Atomic Energy Commission (AEC), which was the predecessor agency to DOE. Figure 1 is a map showing the site location.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hidden in Plain Sight How Interior Furnishings Management Can Help Los Alamos National Laboratory Meet the United States Department of Energy's Sustainability Goals [Slides]

Annually close to 50,000 lbs. of furniture avoids landfills through this program. Over a ten year (2020-2030) over 224 tons of furniture will avoid landfills through the program, that is the weight of the Statue of Liberty. The ReUse program saves LANL $\$172,875$ annually based on the salvage value of the furniture. If the product reused were to be purchased new, LANL would spen close to $1,200,000.

99 GENERAL AND MISCELLANEOUS↗

What Should Health Departments Do with HIV Sequence Data?

Many countries and US states have mandatory statues that require reporting of HIV clinical data including genetic sequencing results to the public health departments. Because genetic sequencing is a part of routine care for HIV infected persons, health departments have extensive sequence collections spanning years and even decades of the HIV epidemic. How should these data be used (or not) in public health practice? This is a complex, multi-faceted question that weighs personal risks against public health benefit. The answer is neither straightforward nor universal. However, to make that judgement—of how genetic sequence data should be used in describing and combating the HIV epidemic—we need a clear image of what a phylogenetically enhanced HIV surveillance system can do and what benefit it might provide. In this paper, we present a positive case for how up-to-date analysis of HIV sequence databases managed by health departments can provide unique and actionable information of how HIV is spreading in local communities. We discuss this question broadly, with examples from the US, as it is globally relevant for all health authorities that collect HIV genetic data.

60 APPLIED LIFE SCIENCES↗

Regulatory Framework for Permanent Shut-down and Decommissioning of Nuclear Power Plant in Korea - 18101

Kori Unit 1, the first commercial NPP in Korea which was commissioned in 1978, was put on permanent shutdown for decommissioning on June 2017, after 40 years of operation. For permanent shutdown of the Kori Unit 1, an operation change permit was submitted in 2016 prior to the expiration since the NSA (Nuclear Safety Act) recognizes permanent shutdown as one of the operation stage. In preparation for the decommissioning of Kori Unit 1, the NSA related to decommissioning was revised and promulgated in 2015. The lower statues including Enforcement Decree and Regulation of the NSA, etc. were promptly revised to reflect decommissioning related requirements and procedures accordingly. For new NPPs, preliminary decommissioning plan is submitted and is being reviewed in the course of license review. Operating NPPs are also planning to submit the decommissioning plan by 2018 and receive approvals from Nuclear Safety and Security Commission. In case that an operator intends to decommission a nuclear installation, the operator shall apply for decommissioning and receive an approval from the NSSC. As discussed, framework for permanent shutdown and decommissioning of nuclear facilities have been well formatted by successful revision of NSA in Korea. Further detailed technical standards and regulatory guides on decommissioning will be developed to facilitate the relevant activities and ensure the nuclear safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗