Welding of Haynes 282 to Steels to Enable Modular Rotors for Advanced Ultra Super-Critical Steam Turbines

Steam turbines for an Advanced Ultra Super Critical (AUSC) fossil fired power plant will operate at temperatures well above those of current commercial steam cycles with inlet temperatures more than 760 C , which is beyond the capabilities of alloy steels presently used for steam turbine applications and requires advanced materials. Large components such as steam turbine rotors may be made of nickel based super alloys such as Haynes 282 (H282). However, monolithic forgings of superalloys in the sizes required for large steam turbines rotors can be prohibitively expensive besides many technical challenges. To minimize cost and alleviate the related technical challenges, superalloy use needs to be limited to locations on the steam turbine rotor where strength and temperature requirements cannot be met by conventional steels. This is possible if nickel-based superalloys can be successfully welded to steels and the related technical challenges - machining parts made of dissimilar welded materials, non-destructive examination of such welds for flaw detection; and, material properties of such hybrid components – are sufficiently addressed. In this technology development project, we successfully welded H282 to plates up to ~ 75 mm (~ 3 inches) to a 3.5NiCrMoV steel of similar thickness. Advanced ultrasonic inspection technique called Phased Array Ultrasonic Testing (PAUT) was employed to examine the dissimilar H282-Steel welds, into which flat bottomed side drilled holes (SDH) of various diameters were introduced, to determine the minimum detectable feature sizes; it was shown that with PAUT SDH of dia. down to 0.5 mm could be detected in the base alloys and SDH with dia. down to 2.4 mm could be detected in the weld metal under multiple orientations successfully. An autonomous machining process monitoring system was developed and demonstrated whereby the forces acting on the cutting tool could be actively monitored as the cutting tool transitioned from H282 to Steel across the weld using which the machining parameters can be potentially altered without interruption to extend tool life. This project successfully achieved its objectives of - i. Developing a welding methodology and viable welding geometries, to successfully join H282 to steel 3.5CrMoNiV steel to enable manufacture of modular steam turbine rotors for AUSC applications (conditions of at least 760 °Celsius and 3,100 psia (pounds per square inch absolute pressure) and evaluate the material properties of the welded specimen. ii. Employ the advanced ultrasonic inspection technique to the dissimilar weld metal joint and determine the minimum detectable feature sizes. iii. Develop effective machining techniques to machine such hybrid structures with online tool force monitoring and effect machine state metrics for optimal results.

20 FOSSIL-FUELED POWER PLANTS↗

Steam Turbines

Turbonetics Energy, Inc.'s steam turbines are used as power generating systems in the oil and gas, chemical, pharmaceuticals, metals and mining, and pulp and paper industries. The Turbonetics line benefited from use of NASA research data on radial inflow steam turbines and from company contact with personnel of Lewis Research Center, also use of Lewis-developed computer programs to determine performance characteristics of turbines.

Source record↗

Ensemble Manufacturing Techniques for Steam Turbine Components Across Length Scales

Faster design to manufacturing requirements were sought for steam turbine components to meet the changing demands of today’s power grid of improved efficiency through operating temperature increases and enhanced operational flexibility from baseload to cyclic operations. Advances in multiple advanced manufacturing (AM) process enabled redesign of turbine components for extreme environments with the potential to reduce cost. AM is of particular interest to improve component functionality, higher temperature capability, and superior durability in large scale steam turbine applications. AM methods have an immense potential to open-up the design space by working directly with the 3D model to produce near-net shapes, enable fast design-manufacturing iterations, thereby significantly reducing product cost and lead-time up to 25 % from current baseline. However, these benefits cannot be fully realized due to the potential for unknown AM processing defects and their resultant effect upon component performance in service. Siemens is partnering with Oak Ridge National Laboratory (ORNL), Electric Power Research Institute (EPRI), and Connecticut Center for Advanced Technology (CCAT) to advance the knowledge of complex process-material interactions for desired microstructures and properties that are closely interlinked to component geometries across different length scales. The proposed program utilized an ensemble of multidisciplinary technologies to accelerate the development of materials, high-throughput experiments for their qualification, and design flexibility/topology optimization for repair/redesign of components to address critical failure mechanisms for improved performance and increased reliability of existing power plant components. The proposed activities, if successfully demonstrated for identified components, will enable paradigm shift in customized manufacturing and accelerated qualification/certification towards increased steam turbine component durability, increased turbine efficiency, and reduced CO 2 emissions in load-following environments compared to today’s technology. Technology maturation is built into the project as successful research will include customized process-component down-selection enabling AM methodologies to be incorporated directly into the existing supply chain. The specific activities of the proposed effort are: 1. Topology optimization of down-selected steam turbine parts that are amenable to additive and hybrid manufacturing for cost/performance improvement. 2. Process-structure-property relationships for five AM processes for steam turbine materials of interest to compare with conventional materials. 3. Perform part/assembly build process using advanced additive/hybrid machine tools followed by quality inspection of the built components for insight into qualification for production scale-up. Steam turbine rig testing of printed components under targeted, well monitored and characterized environmental conditions of for performance comparison of baseline and redesigned components.

36 MATERIALS SCIENCE↗

Brush Seals for Improved Steam Turbine Performance

GE Energy has retrofitted brush seals into more than 19 operating steam turbines. Brush seals offer superior leakage control compared to labyrinth seals, owing to their compliant nature and ability to maintain very tight clearances to the rotating shaft. Seal designs have been established for steam turbines ranging in size from 12 MW to over 1200 MW, including fossil, nuclear, combined-cycle and industrial applications. Steam turbines present unique design challenges that must be addressed to ensure that the potential performance benefits of brush seals are realized. Brush seals can have important effects on the overall turbine system that must be taken into account to assure reliable operation. Subscale rig tests are instrumental to understanding seal behavior under simulated steam-turbine operating conditions, prior to installing brush seals in the field. This presentation discusses the technical challenges of designing brush seals for steam turbines; subscale testing; performance benefits of brush seals; overall system effects; and field applications.

Turnquist, Norman↗

Energy Conversion Alternatives Study (ECAS), Westinghouse phase 1. Volume 5: Combined gas-steam turbine cycles

The energy conversion efficiency of gas-steam turbine cycles was investigated for selected combined cycle power plants. Results indicate that it is possible for combined cycle gas-steam turbine power plants to have efficiencies several point higher than conventional steam plants. Induction of low pressure steam into the steam turbine is shown to improve the plant efficiency. Post firing of the boiler of a high temperature combined cycle plant is found to increase net power but to worsen efficiency. A gas turbine pressure ratio of 12 to 1 was found to be close to optimum at all gas turbine inlet temperatures that were studied. The coal using combined cycle plant with an integrated low-Btu gasifier was calculated to have a plant efficiency of 43.6%, a capitalization of $497/kW, and a cost of electricity of 6.75 mills/MJ (24.3 mills/kwh). This combined cycle plant should be considered for base load power generation.

Amos, D. J.↗

Regenerative superheated steam turbine cycles

PRESTO computer program was developed to analyze performance of wide range of steam turbine cycles with special attention given to regenerative superheated steam turbine cycles. It can be used to model standard turbine cycles, including such features as process steam extraction, induction and feedwater heating by external sources, peaking, and high back pressure. Expansion line efficiencies, exhaust loss, leakages, mechanical losses, and generator losses are used to calculate cycle heat rate and generator output. Program provides power engineer with flexible aid for design and analysis of steam turbine systems.

Fuller, L. C.↗

Improve Performance and Cost for Steam Turbine Maintenance, Repair, and Overhaul Using Additive Manufacturing

The overall objective was to develop additive-manufacturing-enabled repair solutions for last stage bucket (LSB) and additive-manufacturing-enabled packing rings (PRs) for coal-fired steam turbines with the goal of reducing routine maintenance, repair, and overhaul (MRO) cost and improving the operating efficiency of steam turbines. GE Steam Power (GESP) and GE Gas Power (GEGP) provided technical and commercial consulting to GER with insights on steam turbine MRO design requirements, MRO duration and costs, and an overall commercialization strategy for the additive manufacturing technologies developed in the proposed effort.

20 FOSSIL-FUELED POWER PLANTS↗

Microfabricated rankine cycle steam turbine for power generation and methods of making the same

In accordance with the present invention, an integrated micro steam turbine power plant on-a-chip has been provided. The integrated micro steam turbine power plant on-a-chip of the present invention comprises a miniature electric power generation system fabricated using silicon microfabrication technology and lithographic patterning. The present invention converts heat to electricity by implementing a thermodynamic power cycle on a chip. The steam turbine power plant on-a-chip generally comprises a turbine, a pump, an electric generator, an evaporator, and a condenser. The turbine is formed by a rotatable, disk-shaped rotor having a plurality of rotor blades disposed thereon and a plurality of stator blades. The plurality of stator blades are interdigitated with the plurality of rotor blades to form the turbine. The generator is driven by the turbine and converts mechanical energy into electrical energy.

Frechette, Luc↗

Two-phase operation of a Terry steam turbine using air and water mixtures as working fluids

Terry steam turbines are employed in the safety systems of many nuclear Boiling Water Reactors to drive pumps and provide cooling water to the nuclear reactor core. While the turbine efficiency is low, the more important feature is high reliability under off-normal conditions. An important aspect of reliability is the ability to function with two-phase steam-water injection into the turbine, as most likely occurred in the Fukushima Dai-ichi nuclear accidents. This study investigates the characteristics of a Terry turbine during air-water injection with gas mass fractions ranging from 1 (dry gas) to 0.05 (wet gas), to better understand the Terry turbine’s true operational capabilities and provide justification for extended Terry turbine use for reactor safety. Other parameters investigated are the inlet pressure, the exhaust backpressure and the turbine’s rotational speed. The turbine performance is presented in terms of dynamometer loading and pump performance change as functions of the gas mass fraction.

42 ENGINEERING↗

A high-speed photographic system for flow visualization in a steam turbine

A photographic system was designed to visualize the moisture flow in a steam turbine. Good performance of the system was verified using dry turbine mockups in which an aerosol spray simulated, in a rough way, the moisture flow in the turbine. Borescopes and fiber-optic light tubes were selected as the general instrumentation approach. High speed motion-picture photographs of the liquid flow over the stator blade surfaces were taken using stroboscopic lighting. Good visualization of the liquid flow was obtained. Still photographs of drops in flight were made using short duration flash sources. Drops with diameters as small as 30 micrometers (0.0012 in.) could be resolved. In addition, motion pictures of a spray of water simulating the spray off the rotor blades and shrouds were taken at normal framing rates. Specially constructed light tubes containing small tungsten-halogen lamps were used. Sixteen millimeter photography was used in all cases. Two potential problems resulting from the two-phase turbine flow (attenuation and scattering of light by the fog present and liquid accumulation on the borescope mirrors) were taken into account in the photographic system design but not evaluated experimentally.

Barna, G. J.↗

Embedded sensors integrated into critical components for in situ health monitoring of steam turbines

Operational flexibility is desired in today’s coal-fired power plants to balance power grids by compensating for the variable electricity supply from renewable energy sources and distributed gensets. This demanding requirement accelerates materials degradation and makes in-situ health monitoring essential. Life monitoring of components and subsystems is thus seen as essential in assessing material and mechanical behavior to estimate system reliability, move to a conditionbased maintenance strategy and determine time to failure of the units in their actual operating conditions. Vibration monitoring can be exploited for blade tip timing to measure blade vibration amplitude and tip clearance to detect any deterioration taking place in the condition of steam turbine blades. A failure of a rotating blade can lead to severe turbine damage followed by extensive repairs and loss of power production. A blade vibration monitoring system can help early detection of abnormal blade vibration behavior. In conjunction with a health monitoring system, the vibration characteristics can be analyzed to support a pro-active maintenance and inspection schedule. While the feasibility of this inspection technique has been amply demonstrated, there is a need to install induction probes to magnetize the blade for signal output. Siemens, in partnership with Raytheon Technologies Research Corporation (RTRC), proposes a holistic approach to develop embedded sensors to utilize radio frequency for not only coupling to sensors, but as the sensing modality. The goal of this project is to “embed” the novel sensing approach by using either additively manufactured or extruded waveguides on rotating blades for recording, evaluation and monitoring of blade vibrations in Low Pressure turbines, with applications extending to aero engines

01 COAL, LIGNITE, AND PEAT↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Comparison of Integrated Gasifier-Combined Cycle and AFB-steam turbine systems for industrial cogeneration

In the cogeneration technology alternatives study (CTAS) a number of advanced coal fired systems were examined and systems using a integrated coal gasifier IGCC or a fluid bed combustor AFB were found to yield attractive cogeneration results in industrial cogeneration applications. A range of site requirements and cogeneration sizing strategies using ground rules based on CTAS were used in comparing an IGCC and an AFB. The effect of time variations in site requirements and the sensitivity to fuel and electricity price assumptions are examined. The economic alternatives of industrial or utility ownership are also considered. The results indicate that the IGCC system has potentially higher fuel and emission savings and could be an attractive option for utility ownership. The AFB steam turbine system has a potentially higher return on investment and could be attractive assuming industrial ownership.

Nainiger, J. J.↗

A 400-kWe high-efficiency steam turbine for industrial cogeneration

An advanced state-of-the-art steam turbine-generator developed to serve as the power conversion subsystem for the Department of Energy's Sandia National Laboratories' Solar Total-Energy Project (STEP) is described. The turbine-generator, which is designed to provide 400-kW of net electrical power, represents the largest turbine-generator built specifically for commercial solar-powered cogeneration. The controls for the turbine-generator incorporate a multiple, partial-arc entry to provide efficient off-design performance, as well as an extraction control scheme to permit extraction flow regulation while maintaining 110-spsig pressure. Normal turbine operation is achieved while synchronized to a local utility and in a stand-alone mode. In both cases, the turbine-generator features automatic load control as well as remote start-up and shutdown capability. Tests totaling 200 hours were conducted to confirm the integrity of the turbine's mechanical structure and control function. Performance tests resulted in a measured inlet throttle flow of 8,450 pounds per hour, which was near design conditions.

Leibowitz, H. M.↗

Flow studies in a wet steam turbine

The design and test results of a four stage wet vapor turbine operating with slightly superheated inlet steam and expanding to 10% exit moisture are presented. High speed movies at 3000 frames per second of liquid movement on the pressure side and along the trailing edge of the last stator blade are discussed along with back lighted photographs of moisture drops as they were torn from the stator blade trailing edge. Movies at lower framing rates were also taken of the exit of the last rotating blade and the casing moisture removal slot located in line with the rotor blade shroud. Also moisture removal data are presented of casing slot removal at the exit of the third and fourth rotor blades and for slots located in the trailing edge of the last stator blade. Finally, the degradation of turbine thermodynamic performance due to condensation formation and movement is discussed.

Evans, D. H.↗

User's manual for PRESTO: A computer code for the performance of regenerative steam turbine cycles

Standard turbine cycles for baseload power plants and cycles with such additional features as process steam extraction and induction and feedwater heating by external heat sources may be modeled. Peaking and high back pressure cycles are also included. The code's methodology is to use the expansion line efficiencies, exhaust loss, leakages, mechanical losses, and generator losses to calculate the heat rate and generator output. A general description of the code is given as well as the instructions for input data preparation. Appended are two complete example cases.

Fuller, L. C.↗

New features and applications of PRESTO, a computer code for the performance of regenerative, superheated steam turbine cycles

The code was designed to analyze performance at valves-wide-open design flow. The code can model conventional steam cycles as well as cycles that include such special features as process steam extraction and induction and feedwater heating by external heat sources. Convenience features and extensions to the special features were incorporated into the PRESTO code. The features are described, and detailed examples illustrating the use of both the original and the special features are given.

Choo, Y. K.↗

Component testing of a ground based gas turbine steam cooled rich-burn primary zone combustor for emissions control of nitrogeneous fuels

This effort summarizes the work performed on a steam cooled, rich-burn primary zone, variable geometry combustor designed for combustion of nitrogeneous fuels such as heavy oils or synthetic crude oils. The steam cooling was employed to determine its feasibility and assess its usefulness as part of a ground based gas turbine bottoming cycle. Variable combustor geometry was employed to demonstrate its ability to control primary and secondary zone equivalence ratios and overall pressure drop. Both concepts proved to be highly successful in achieving their desired objectives. The steam cooling reduced peak liner temperatures to less than 800 K. This low temperature offers the potential of both long life and reduced use of strategic materials for liner fabrication. These degrees of variable geometry were successfully employed to control air flow distribution within the combustor. A variable blade angle axial flow air swirler was used to control primary zone air flow, while the secondary and tertiary zone air flows were controlled by rotating bands which regulated air flow to the secondary zone quench holes and the dilutions holes respectively.