Search NASA⌕ Search

SEARCH · Search NASA

Results for “stud”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Common Cause Case Study: An Estimated Probability of Four Solid Rocket Booster Hold-down Post Stud Hang-ups

Until Solid Rocket Motor ignition, the Space Shuttle is mated to the Mobil Launch Platform in part via eight (8) Solid Rocket Booster (SRB) hold-down bolts. The bolts are fractured using redundant pyrotechnics, and are designed to drop through a hold-down post on the Mobile Launch Platform before the Space Shuttle begins movement. The Space Shuttle program has experienced numerous failures where a bolt has "hung-up." That is, it did not clear the hold-down post before liftoff and was caught by the SRBs. This places an additional structural load on the vehicle that was not included in the original certification requirements. The Space Shuttle is currently being certified to withstand the loads induced by up to three (3) of eight (8) SRB hold-down post studs experiencing a "hang-up." The results af loads analyses performed for four (4) stud-hang ups indicate that the internal vehicle loads exceed current structural certification limits at several locations. To determine the risk to the vehicle from four (4) stud hang-ups, the likelihood of the scenario occurring must first be evaluated. Prior to the analysis discussed in this paper, the likelihood of occurrence had been estimated assuming that the stud hang-ups were completely independent events. That is, it was assumed that no common causes or factors existed between the individual stud hang-up events. A review of the data associated with the hang-up events, showed that a common factor (timing skew) was present. This paper summarizes a revised likelihood evaluation performed for the four (4) stud hang-ups case considering that there are common factors associated with the stud hang-ups. The results show that explicitly (i.e. not using standard common cause methodologies such as beta factor or Multiple Greek Letter modeling) taking into account the common factor of timing skew results in an increase in the estimated likelihood of four (4) stud hang-ups of an order of magnitude over the independent failure case.

Cross, Robert↗

Common Cause Case Study: An Estimated Probability of Four Solid Rocket Booster Hold-Down Post Stud Hang-ups

Until Solid Rocket Motor ignition, the Space Shuttle is mated to the Mobil Launch Platform in part via eight (8) Solid Rocket Booster (SRB) hold-down bolts. The bolts are fractured using redundant pyrotechnics, and are designed to drop through a hold-down post on the Mobile Launch Platform before the Space Shuttle begins movement. The Space Shuttle program has experienced numerous failures where a bolt has hung up. That is, it did not clear the hold-down post before liftoff and was caught by the SRBs. This places an additional structural load on the vehicle that was not included in the original certification requirements. The Space Shuttle is currently being certified to withstand the loads induced by up to three (3) of eight (8) SRB hold-down experiencing a "hang-up". The results of loads analyses performed for (4) stud hang-ups indicate that the internal vehicle loads exceed current structural certification limits at several locations. To determine the risk to the vehicle from four (4) stud hang-ups, the likelihood of the scenario occurring must first be evaluated. Prior to the analysis discussed in this paper, the likelihood of occurrence had been estimated assuming that the stud hang-ups were completely independent events. That is, it was assumed that no common causes or factors existed between the individual stud hang-up events. A review of the data associated with the hang-up events, showed that a common factor (timing skew) was present. This paper summarizes a revised likelihood evaluation performed for the four (4) stud hang-ups case considering that there are common factors associated with the stud hang-ups. The results show that explicitly (i.e. not using standard common cause methodologies such as beta factor or Multiple Greek Letter modeling) taking into account the common factor of timing skew results in an increase in the estimated likelihood of four (4) stud hang-ups of an order of magnitude over the independent failure case.

Cross, Robert↗

Failure Analysis of Main Flame Deflector Nelson Studs

NASA Structures engineers submitted two Nelson refractory studs from the main flame deflector at Launch Complex (LC) 39 A for analysis when they were observed to be missing a significant amount of material after launch. The damaged stud and an unused comparative stud were analyzed by macroscopic and microscopic examination along with metallographic evaluation of the microstructure. The stud lost material due to a combination of erosion and corrosion. Plain carbon steel readily forms an oxide layer in the coastal launch environment at Kennedy Space Center. The blast during a launch removes this brittle oxide layer, which then forms again post-launch, thereby further removing material. No indications of melting were observed.

Long, Victoria↗

Gun facilitates adhesive bonding of studs to surfaces

Gun facilitates adhesive bonding of thermoplastic-backed studs to smooth, hard surfaces. Such studs can be used for mounting loads where defacement with drilled holes cannot be tolerated. These studs can be easily removed by softening the plastic bonding with heat from the gun.

Davis, B. K.↗

Modified faceplate assembly for stud-welding gun

Ventilated barrel assembly aids installation of studs on narrow uneven weld lands. The modified faceplate permits proper aligning of the percussion stud-welding gun in any position and on a smaller surface, and it maintains gap setting without any other adjustment.

Johnson, R. E.↗

Improved stud configurations for attaching laminated wood wind turbine blades

A series of bonded stud design configurations was screened on the basis of tension-tension cyclic tests to determine the structural capability of each configuration for joining a laminated wood structure (wind turbine blade) to a steel flange (wind turbine hub). Design parameters which affected the joint strength (ultimate and fatigue) were systematically varied and evaluated through appropriate testing. Two designs showing the most promise were used to fabricate addiate testing. Two designs showing the most promise were used to fabricate additional test specimens to determine ultimate strength and fatigue curves. Test results for the bonded stud designs demonstrated that joint strengths approaching the 10,000 to 12,000 psi ultimate strength and 5000 psi high cycle fatigue strength of the wood epoxy composite could be achieved.

Fadoul, J. R.↗

Improved Stud Designs for Wood/Metal Joints

Load-transfer capacities and resistances to fatigue increased. Series of high-strength bonded-stud designs developed for joining laminated wood to metal. Test results for bonded-stud designs demonstrated joint strengths approaching 10,000 to 12,000 psi (69 to 83 MPa) in ultimate strength and 5,000 psi (34 MPa) in high cycle fatigue strength of wood/epoxy composite achieved.

Faddoul, J. R.↗

Demonstration of Control of Laser-Plasma Instabilities in the Laboratory Using STUD Pulses (Spike Trains of Uneven Duration and Delay)

The success of laser Driven Inertial Fusion Technology (LaDrIFT) hinges on controlling laser-plasma instabilities (LPI) for effective and non-deleterious energy coupling, together with the control of implosion hydrodynamic instabilities (IHI) for target integrity. Conventional approaches ignore LPI and focus on IHI. LPI control suggests the use of low intensities, short wavelengths, and thus the slow implosions of thinner shells, while IHI control calls for thicker shells, fast implosions and thus at higher laser intensities and ablation pressures. These contradicting requirements severely restrict LaDrIFT design space, flexibility and scalability. This program demonstrates, with theoretical designs and their preliminary experimental realizations, that STUD pulses (Spike Trains of Uneven Duration and Delay) can control LPI in high-energy-density (HED) laser-created plasmas and explore this physics for the first time with high repetition (rep) rate lasers.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Repair of honeycomb panels with welded breakaway studs

Damaged metallic honeycomb panels can be repaired by drilling holes and welding breakaway studs to both facing sheets. Minimal heat required for welding reduces distortion of highly stressed panels. Repairs can be made without the use of doublers and with greater strength when doublers are used.

Bruce, D. F.↗

Wetting agent for stud welding

Easily-formulated detergent solution (aromatic polyglycolether) lowers cost and increases quality of aluminum stud welds made by capacitor-discharge welding.

Green, C. L.↗

Precise Restraightening of Bent Studs

Special tool quickly bends studs back into shape accurately and safely by force applied by hydraulic ram, with deflection being measured by dial indicator. Ram and indicator can be interchanged for straightening in reverse direction.

Boardman, R. E.↗

Tools For Installing Keys On A Stud

Two tools designed to be used together to drive long locking keys axially to install them on stud. Tools are: supporter holding keys in correct relative alignment and driver having multiple prongs, each of which fits into one of holes in supporter. Tools prevent bending and breaking of keys during installation, and make possible to install all keys simultaneously, in one motion.

Goodoak, Robert D.↗

Corrigendum to ‘Under-capacitated and over-powered? Rural austerity and asymmetrical negotiating relationships in US wind energy development’ [J. Rural Stud., 119 (2025) 1–14]

The authors regret that there is an incomplete sentence in the abstract of the article, and request that the portion “, and counties incre” be deleted from the abstract (found at the end of the sentence beginning with “However …”). The portion to be deleted is underlined and bolded below. The authors would like to apologise for any inconvenience caused. Current abstract: Though rural local governments are central actors in renewable energy development, local governments in the United States (US) remain systematically under-funded. This paper considers what the manifestations of austerity in local governments broadly and rural localities specifically mean for renewable energy development and for energy transitions. Drawing on a survey of 262 elected county officials with experience with wind energy in eight US states, this paper asks how local officials understand the impacts of wind development, how local governments are involved in wind energy negotiations, how the resources and expertise needed to navigate negotiations are distributed among counties, and analyze the relationship between local capacity, access to resources, and involvement in negotiations. We find that local officials express simultaneously affective and material concerns with the impacts of wind development and see negotiations with the developer as central to realizing local benefits. However, the expertise and staffing needed to negotiate with developers is less accessible to poorer or sparsely populated counties, and counties with lower overall revenues have narrower scopes of negotiation, and counties incre. Our results suggest that uneven rural capacity heightens an already asymmetrical relationship between localities and developers. In analyzing how infrastructure developments are shaped by relationships between localities and developers that are conditioned by austerity and (under)capacity, this paper contributes to and bridges scholarly discussions on rural austerity, rescaling, and renewable energy transitions. These results challenge conventional wisdoms around centralizing energy siting processes, contextualize popular and academic debates about opposition to renewable energy development, and highlight the need for rural reinvestment to realize meaningfully participatory energy developments.

Elmallah, Salma↗

Development of Lead Free Energy Absorber for Space Shuttle Blast Container

The Space Shuttle vehicle (SSV) is connected to the mobile launch platform (MLP) by four aft skirt hold down studs on each solid rocket booster (SRB). Prior to lift-off, the frangible nuts inside the aft skirt blast containers (BC) are severed into two nut halves by two pyrotechnic booster cartridges. This action releases the SSV and allows the hold down studs to eject through the aft skirt bore and then down into the MLP. USBI has been tasked to upgrade the BC for two specific reasons; 1. to eliminate lead for environmental concerns, and 2. to reduce the chance of nut recontact with the holddown stud. Nut recontact with the stud has been identified as a likely contributor to stud hangups. This upgrade will replace the lead liner with an aluminum foam material. The aluminum foam used as a energy absorber is a proven design in many other aerospace/defense applications. Additional benefits of using the open cell, energy absorbent aluminum foam in place of the solid lead liner are: A. Lead handling/ exposure, and possible contamination, along with hazardous waste disposal will be eliminated; B. Approximately 200 lbs. weight savings will be contributed to each Space Shuttle flight by using aluminum foam over lead; C. The new aluminum liner is designed to catch all shrapnel from frangible nuts thus virtually eliminating chance of foreign object debris (FOD) exiting the HDP, and causing potential damage to the vehicle; D. Potential of using the lighter aluminum liner over lead, allows for easier assembly and disassembly of blast container elements, also allowing for improvements in safety, operator handling, and efficiency of operations. Six BC firing tests will be required to determine if the new liner material will perform in a way to decrease the chance of stud hangups and enhance the ability of the BC to retain blast debris. Testing will be performed at the Kennedy Space Center (KSC) facility known as the Launch Equipment Test Facility (LETF), and will simulate the SRB hold- down post, with actual BC hardware and pyrotechnics assembled, and then test fired. Initial testing was performed in 1997 using a frangible nut in a static drop test over lead and aluminum foam sheet materials. The aluminum foam showed a dramatic improvement of energy absorption over the lead liner material. Proof-of-Principle testing at the KSC-LETF commenced in May, 1998, and is expected to be completed by June, 1998.

Ingram, T.↗

Device for measuring hole elongation in a bolted joint

A device to determine the operable failure mode of mechanically fastened lightweight composite joints by measuring the hole elongation of a bolted joint is disclosed. The double-lap joint test apparatus comprises a stud, a test specimen having a hole, two load transfer plates, and linear displacement measuring instruments. The test specimen is sandwiched between the two load transfer plates and clamped together with the stud. Spacer washers are placed between the test specimen and each load transfer plate to provide a known, controllable area for the determination of clamping forces around the hole of the specimen attributable to bolt torque. The spacer washers also provide a gap for the mounting of reference angles on each side of the test specimen. Under tensile loading, elongation of the hole of the test specimen causes the stud to move away from the reference angles. This displacement is measured by the voltage output of two linear displacement measuring instruments that are attached to the stud and remain in contact with the reference angles throughout the tensile loading. The present invention obviates previous problems in obtaining specimen deformation measurements by monitoring the reference angles to the test specimen and the linear displacement measuring instruments to the stud.

Wichorek, Gregory R.↗

Transducer-Mounting Fixture

Transducer-mounting fixture holds transducer securely against stud. Projects only slightly beyond stud after installation. Flanged transducer fits into fixture when hinged halves open. When halves reclosed, fixture tightened onto threaded stud until stud makes contact with transducer. Knurled area on fixture aids in tightening fixture on stud.

Spiegel, Kirk W.↗