Search NASA⌕ Search

SEARCH · Search NASA

Results for “substation forecasts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Appendix

AWS Truepower - SWIFT Forecasting Details Appendix to Distributed Resource Energy Analysis & Management System (DREAMS) Development for Real-time Grid Operations

14 SOLAR ENERGY↗

DSO+T: Transactive Energy Coordination Framework (DSO+T Study: Volume 3)

This report describes a transactive energy coordination scheme designed to integrate into existing day-ahead and real-time wholesale energy markets. This scheme was evaluated in the Distribution System Operator with Transactive (DSO+T) study to assess the engineering and economic performance of the transactive energy coordination of a large-scale deployment of distributed energy resources (DER). Transactive agents were developed for a range of DERs (heating, ventilation, and air conditioning units, water heaters, batteries, and electric vehicles) that optimize flexibility over a 48-hour horizon and adjust their strategy in response to changes in real-time prices. A transactive energy coordination scheme, executed by a DSO retail market operator, aggregates these DER bids from participating customers and clears them against a DSO supply curve using a double auction market mechanism. The process of constructing the price-quantity DSO supply curve includes distribution-level transportation constraints (for example, substation congestion limits) and forecast locational marginal price of the DSO’s connected transmission node. The resulting day-ahead and real-time quantities are then bid into a competitive wholesale market operated by an independent system operator. This report also details additional capabilities for proper marketplace simulation such as wholesale price, weather, and load forecasting. The report concludes with a discussion of lessons learned and key design features required to ensure successful operation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A cross-dimensional analysis of data-driven short-term load forecasting methods with large-scale smart meter data

Electricity load forecasting is essential to utility operation and power grid stability. A wide spectrum of data-driven methods, ranging from linear regression models to more recent deep learning models have been adopted to forecast electric load over the years. However, there still lacks a holistic evaluation of the applicability of conventional statistical and machine learning based algorithms with respect to different temporal and spatial scopes, computational requirements, and sensitivity of model-tuning. Enabled by a large-scale electricity load profile dataset of over 40,000 residential customers in a utility region, we conducted a cross-dimensional analysis of data-driven load forecasting methods. Three regression-based and seven deep learning algorithms with different model configurations were evaluated in terms of their overall and peak load prediction accuracy, and training burdens, across spatial aggregation levels ranging from the transformer, feeder, substation, to neighborhood. We found, first, the load forecasting accuracy is constrained by a predictability boundary, influenced by the forecasting horizon and spatial aggregation level. Specifically, RandomForest, XGBoost, TFT, TSMixer, and TiDE models achieved less than 10 % prediction error for up to 96-h ahead forecasting for district, substation, and feeder levels, while other models struggle at long-horizon predictions; Second, for winter and summer peak load dates, most models were able to predict the peak demand timing within ± 1 h, but the prediction percentage error varied by models, with TFT and TiDE models being the top performers; Third, models with similar prediction accuracy can differ in training burden by an order of magnitude. Therefore, choosing model configurations that balance prediction performance and computational resource is an important practical consideration for large-scale deployment of the machine learning based load forecasting. The outcome of this study can guide researchers and practitioners to choose the proper load forecasting algorithms based on their problem scope, required accuracy, and available resources. The predictability boundary can serve as a benchmark for electricity load forecasting problems with new algorithms and datasets.

Li, Han↗

Visualization and Analytics of Distribution Systems with Deep Penetration of Distributed Energy Resources (VADER)

In its current state, the distribution system is incapable of handling small to moderate amounts of photovoltaic (PV) penetration. This is because it was initially designed for handling passive loads which, at the level of a substation, have low variability and are forecastable with high accuracy. It has been an open loop system with little monitoring and control. With the addition of PV energy sources, the overall scenario will change dramatically due to (1) two way power flow on network; and (2) high aggregate variability. Additionally, changes on the consumption side lead to a number of smart loads, Electric Vehicles (EVs), and Demand Response. These fundamental changes in the characteristics of the generation and consumption of power will lead to a number of practical engineering problems which must be overcome to allow increased penetration of Distributed PV. Solving the unique engineering challenges which arise at moderate levels of PV penetration requires closed loop integration of data from (1) PV sources; (2) customer load data from smart meters; (3) EV charging data; and (4) local and line mounted precision instruments. These data are not traditionally used by utilities in operations since they are ”non-SCADA” and the current grid does not require such levels of control. To integrate this data and provide real time intelligence from these non-SCADA data, we created the Visualization and Analytics of Distribution Systems with Deep Penetration of Distributed Energy Resources (VADER) platform. VADER is a collection of analytics enabled by integration of massive and heterogeneous data streams for granular real-time monitoring, visualization and control of Distributed Energy Resources (DER) in distribution networks. VADER analytics enable utilities to have greater visibility into distributed energy resources. We built several batch- and stream-analytics in VADER which help operators better understand the impact of distributed energy resources on the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity Anomaly Detection in SCADA-Assisted OT Networks Using Ensemble-Based State Prediction Model

The cybersecurity threats of power system gradually grow due to the increased sophisticated interactions between Information Technology (IT) and Operational Technology (OT) networks. False data injection attack (FDIA) that aims to compromise the Supervisory Control and Data Acquisition (SCADA) measurement and disturb the system operation is one of such cyber threats. Such attacks can potentially lead to significant operational issues at the control centers and substations, and hence, result in severe physical consequences. To avoid catastrophic failure across the power grid resulting from these attacks, it is essential to arm the OT network with real-time vulnerability assessment tools. To this end, this paper outlines various drawbacks of the Purdue architecture model to defend against cyberattacks in the OT network. Furthermore, a novel ensemble-based state prediction model is proposed to detect cybersecurity anomalies in SCADA assisted OT networks. The proposed model uses control center level generation and load forecasts, scheduled, and forced outages, power flow solutions, and the substation level historical data. The hypothesis of the proposed scheme relies on the fact that additional control center and substation data can hardly be accessed and compromised by attackers. One of the vital features of the proposed scheme is an hour-ahead prediction of the operational feasibility of the SCADA measurement range at the control center and substation in real time helps in detecting anomalies in measurements across both substation and the control center.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution Substation Planning Toolkit (dsp-toolkit) v1.0

The Distribution Substation Planning Toolkit (DSP Toolkit) is a software suite designed to streamline the planning and optimization of distribution substations. This toolkit offers a comprehensive set of tools and APIs for data curation, short-term electric load forecasting, and weather-sensitive load adjustment, making it an essential resource for utility companies, engineers, and researchers. Features • Data Preprocessing and Curation: Efficiently manage and preprocess large datasets to ensure high-quality input for analysis. • Short-Term Load Forecasting: Utilize data-driven models to predict short-term electric loads accurately. • Weather-Sensitive Modeling: Automatically adjust load forecasts based on weather data to predict future peak demands more precisely. Uses The DSP Toolkit is ideal for planning and optimizing distribution substations, providing a user-friendly interface and comprehensive documentation. It is suitable for both novice and experienced users, facilitating efficient and accurate planning processes. Advantages • Efficiency: Automates complex planning tasks, reducing manual effort and minimizing errors. • Scalability: Handles large datasets and complex models, making it suitable for large-scale projects. • Community and Support: Open-source with active community contributions, ensuring continuous improvement and support. • Extensibility: Easily extendable with custom modules and plugins, allowing users to tailor the toolkit to their specific needs. The DSP Toolkit stands out by offering a robust, flexible, and user-friendly solution for distribution substation planning. Public Abstract

Li, Han [Lawrence Berkeley National Laboratory (LB↗

Multi-Factor-Coupled, Ahead-of-Time Aggregation of Power Flexibility Under Forecast Uncertainty

The increasing penetration of distributed energy resources (DERs) is significantly reshaping the role of distribution systems under active energy management. To aggregate the active-reactive power flexibility of DERs dispersed at the feeder and provide capacity support to the transmission system, it is essential to efficiently identify feasible substation power injection trajectories. This paper introduces a novel ahead-of-time flexibility characterization method to address it. First, a polyhedral non-feeder-level power flexibility region (PFR) is constructed, accounting for various time-dependent, power-coupled, and forecast error uncertainties. Then, a polyhedral feeder-level PFR is analytically derived through a coordinate transformation, which can reveal the uncertainty propagation path, i.e., how uncertainty applies to the feeder-level PFR. To facilitate the high-level application, a tractable chance-constrained Chebyshev centering optimization model is further developed to find a ball-shaped inner approximation of the feeder-level PFR. Finally, the proposed method is validated on a modified IEEE 123-bus test system. Here, both theoretical and experimental results show that, with appropriate robustness parameter settings, the proposed method can make the approximated PFR less conservative with abundant robustness against forecast error uncertainty.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Appropriateness in using LANDSAT in development energy related data bases

The use of automated classification systems in the field of resource management and resource inventory is discussed. Applications of LANDSAT classification are outlined and include: energy load forecasting based upon land use inventories and change analysis, impact analysis of activities related to energy extraction, capability/suitability mapping in support of generation and substation location and transmission line routing, and assessment of solar energy potential in a highly urbanized setting where land values are high. It is found that the use of LANDSAT data is adequate for general inventories where few data categories are required, where resolution of data to around 150 acres minimum is required, and where no other complete imagery set can be obtained.

Harnden, E.↗

Integration of a DER Management System in Riverside. Final report

The tasks in this project covered various aspects, including algorithm development, algorithm integration into a commercial Active Network Management (ANM) platform, hardware-in-the-loop (HIL) testing in an industry-standard testing platform, pilot demonstration in Riverside, California, and also cost and benefit analysis. The DERMS platform in this project can host different algorithms developed on different platforms (e.g., MATLAB and Python) and it can interact with different hardware devices (e.g., different PV inverters, battery inverters, and different sensors). The DER control solution are based on an advanced model-free, layered, and clustered DER control paradigm. At the core of the DER control algorithms was the concept of Extremum Seeking (ES), which is a model-free probing-based control technique. The ES-based control algorithms were tested on major real-world inverters; both individually and in a cluster. It was shown that even legacy equipment (or when paired with a few additional advanced equipment) can support such advanced control. The monitoring algorithms utilize a heterogeneous set of legacy and advanced sensor measurements, such as behind-the-meter DER sensors, distribution-level Phase Measurement Units, distribution-substation Supervisory Control and Data Acquisition (SCADA), and line current sensors, with their limited availability; in order to infer practical network conditions. Sensor data are utilized to achieve resource forecasting, phase identification, and distribution system state estimation. The technology that was developed and demonstrated in this project could be transformational to utilities, including the smaller municipal utilities such as in Riverside, which may not have the resources to deploy advanced distribution system and DERMS solutions in order to support high penetration of solar power integration. This project created a real-world prototype to provide utilities with an assessment of smart grid monitoring and control technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chance-Constrained Day-Ahead Hourly Scheduling in Distribution System Operation

This paper aims to propose a two-step approach for day-ahead hourly scheduling in a distribution system operation, which contains two operation costs, the operation cost at substation level and feeder level. In the first step, the objective is to minimize the electric power purchase from the day-ahead market with the stochastic optimization. The historical data of day-ahead hourly electric power consumption is used to provide the forecast results with the forecasting error, which is presented by a chance constraint and formulated into a deterministic form by Gaussian mixture model (GMM). In the second step, the objective is to minimize the system loss. Considering the nonconvexity of the three-phase balanced AC optimal power flow problem in distribution systems, the second-order cone program (SOCP) is used to relax the problem. Then, a distributed optimization approach is built based on the alternating direction method of multiplier (ADMM). The results shows that the validity and effectiveness method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic correlation analysis to rank the impact of intermittent wind generation on unreliability margins of power systems

Power systems are vulnerable to extreme contingencies (like an outage of a major generating substation or transmission line) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Power systems operators take time-ahead actions (real time to day ahead) actions based on forecasted data as well as telemetry. However, there is a probability of extreme swings in wind generation that can push the power system that is already close to system boundaries into unreliable states. Increasing penetration on wind generation and uncertainties in short term forecast can move the system into operational states that can violate N-1 reliability criteria. While the power system planning accounts for worst case analyses to mitigate such emergencies, it is necessary to understand the spatial and temporal correlation of load buses with intermittent wind generation. The ranking of wind generators based on stochastic correlation to unreliability margins of load buses provides an insight of system vulnerabilities that can be corrected by appropriate emergency controls. A Monte-Carlo simulation of wind uncertainty forecast is performed to identify the probability distributions of unreliability margins. Ranking of wind generators is performed based on stochastic correlation analysis of the wind power generated and the load losses at the buses. This helps in not only identifying weak buses in the power system but also in identifying the vulnerable wind locations to plan for system reinforcements. Power system modeling and hybrid simulation to calculate unreliability margins are performed using DCAT and demonstrated on the 32-bus Nordic test system.

generators, wind forecasting, wind power generatio↗

MPC4CLR (Model-Predictive-Control-for-Critical-Load-Restoration-in-Power-Distribution-Systems) [SWR-22-24]

Model predictive control (MPC) is a system or process control technique for making decisions under uncertainty via rolling look-ahead optimizations at each control step where only the current step decisions are applied, and the rest are discarded. In this work, we developed an MPC for a critical load restoration (CLR) in power distribution systems to recover system service (electricity delivery) following an extreme event-triggered substation outage. The method considers the problem of controlling distributed energy resources (DERs) of the distribution system with the objective of achieving maximum load pick up while satisfying distribution network flow and voltage constraints. A linearized optimal power flow (OPF) model is employed to represent the physics of the network. The problem formulation is augmented with a ramping (up) reserve product for the DERs to ensure improved and upward monotonic load restoration as time evolves. Simulation analysis and performance tests are performed using a modified IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage battery. The software is developed using various software packages in Julia and Python. The MPC model is implemented using the JuMP optimization language in Julia while the data analytics including renewable generation and load demand forecasts, running the MPC simulation and visualizations is performed in Python.

Eseye, Abinet Tesfaye↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗