Search NASA⌕ Search

SEARCH · Search NASA

Results for “substation reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Electrical Substation Configuration Effect on Substation Reliability

The nation’s electrical grid must be reliable because of its critical role in the economy, defense, and security of the nation. Many common tasks and industrial operations rely on proper electrical power distribution. In the design of new bus systems or evaluation of existing bus systems, the type of bus configuration affects the risk, reliability, maintenance, and cost of the system. This work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA) based sensitivity study on the reliability of substations with differing bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses of varying number of lines. The case variances, methods, and rankings presented can provide a guide for bus configuration for future electrical grid design and analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Substation Configuration Effect on Substation Reliability

It is crucial that the U.S. electrical grid be reliable, due to its critical role in the economy and our national defense/security. Many common tasks and industrial operations rely on proper electrical power distribution. In designing new bus systems or evaluating existing ones, the type of configuration employed affects the level of risk, reliability, maintenance, and cost involved. The present work utilizes Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) to perform a probabilistic risk assessment (PRA)-based sensitivity study on substation reliability in regard to different bus configurations. This study examines single bus, main and transfer, breaker and a half, double bus/double breaker, and ring bus configurations applied to busses with different numbers of lines. The case variances, methods, and rankings presented herein can help guide bus configurations for electrical grid design/analysis in the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling & Analysis of a Small Hydropower Plant and Battery Energy Storage System Connected as a Microgrid

Puget Sound Energy (PSE) is a utility with headquarters in Bellevue, WA that provides electric and gas service to customers in many regions of western Washington State. PSE is undertaking the implementation of a battery energy storage system pilot project in Glacier, WA, a small town located in the North Cascade Mountains near Mt. Baker Ski Area. Glacier experiences power outages that are both somewhat frequent and lengthy (roughly 2.8 outages per year with a duration of 7.5 hours average). The primary cause of the outages is faults on a long 55 kV transmission line that serves the town of Glacier from the Kendall substation. This approximately 10-mile long line is shown in the upper left of Figure 1 below. The Kendall-Glacier transmission line extends through an area of heavy forest with few reasonable options for increasing the line’s reliability. The substation in Glacier (also shown on figure below) serves over 1000 customers that are mostly residential but includes over 50 small businesses. The town has approximately 250 year-round residents, and a peak in visitors during the winter ski season when storms are also more likely to cause power outages. Figure 1: Proposed Microgrid in Glacier, WA Given the reliability challenges in Glacier, PSE is assessing the feasibility of a 2MW/4.4MWh battery energy storage system (BESS) that would allow for improved reliability. The BESS would also allow for the ability to investigate other applications for utility-scale energy 5 storage. This energy storage system is being considered for operation in “planned islanding” and “microgrid” mode. “Planned islanding” indicates use of the BESS to provide power to part or potentially all of the load in the town of Glacier during an outage. “Microgrid” indicates utilization (during an outage) of the BESS in parallel with Nooksack Falls Hydroelectric Power Plant, a small (nameplate 1.5 MW/2000 HP) hydro power plant less than 10 miles from the town of Glacier. Nooksack is a run-of river small hydro generation plant with a gross head of 226 ft. The site has a 5-foot diameter penstock which enters the powerhouse and goes into a pelton turbine with six runners on one shaft. It was originally constructed by Stone & Webster in 1906, which makes it the second oldest operating power generation facility in Western Washington. It was placed on the National Register of Historic places in December of 1988. The plant operated until 1997 when a fire destroyed the generator. The project continued operations in 2003 after the replacement of the generator and other updates.

13 HYDRO ENERGY↗

Change in Brooklyn and Queens: How New York?s Reforming the Energy Vision Program and Con Edison Are Reshaping Electric Distribution Planning

The New York City boroughs of Brooklyn and Queens are undergoing a period of gentrification, infrastructure rebuilding, new construction, and load growth not experienced in decades. Significant numbers of residents are moving in, and structures that had been abandoned or were in disrepair are being refurbished and modernized to accommodate the burgeoning population. Homes, businesses, and industries are reviving areas long in decline, and Brooklyn's growth has made it the nation's fourth most populous city, according to the U.S. Census Bureau.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IEC 61850: Technology Standards and Cyber-Security Threats

Substations constitute a fundamental part in providing reliable electricity to consumers. For a substation to maintain electricity reliability and its own real-time operability, communication between its components is inevitable. Before the emergence of IEC 61850, inter-substation communication was established via expensive copper wires with limited capabilities. IEC 61850 is the standard set by the International Electrotechnical Commission (IEC) Technical Committee Number 57 Working Group 10 and IEEE for Ethernet (IEEE 802.3)-based communication in electrical substations. Like many power grid systems standards, IEC 61850 was set without extensive consideration for critical security measures. This paper discusses IEC 61850 technology standards and applications thoroughly and points out major security vulnerabilities it introduces in the context of current cyber-physical smart grid systems.

97 MATHEMATICS AND COMPUTING↗

Cybersecurity Enhancement in Digital Substations: Hidden Markov Model-Based Smart Cyber Switching and Threat Response

The rising incidence of cyber-attacks on critical infrastructure and power grids poses significant threats to the stability and reliability of electrical substations, with potentially devastating consequences such as extended blackouts. This paper introduces an advanced cybersecurity framework aimed at safeguarding IEC 61850-based substations through the integration of software-defined networking (SDN) and digital twin (DT) technologies. The proposed DT-based framework employs smart cyber switching (SCS) for proactive threat mitigation and concurrent intelligent electronic device (CIED) for swift system restoration, thereby maintaining continuous operational integrity and robust cybersecurity defenses. Central to this framework is the adaptive port controller (APC), which enables dynamic port management to adapt to evolving threats, and an intrusion detection system (IDS) designed to detect and neutralize malicious attacks on IEC 61850-based sampled value (SV) and generic object-oriented substation event (GOOSE) messages within the substation’s communication network. Further, novel predictive intrusion detection and response (PIDR) algorithm is implemented on a digital substation (DS) to predict the best route to be taken by the attacker. The efficacy of these comprehensive cybersecurity frameworks is validated through rigorous simulations and a hardware-in-the-loop (HIL) testbed, showcasing the system’s ability to sustain substation operations amidst cyber-attacks.

Digital substation↗

Methods and systems for detection of man-in-the-middle attacks for SCADA communication networks and applications of same

A system for detecting MITM for SCADA communication networks includes secure substation-substation communication links for providing secure and reliable paths to exchange OT data between substations for OT data consistency check; a SIB in each substation for sampling CT and PT measurements to calculate voltage magnitude and phase angle thereof; a S&C server in each substation coupled to the SIB for receiving the voltage magnitude and phase angle from the SIB and obtaining a packet carrying active power flow in transmission lines between two substations and a time stamp; an IDS server placed in a SCADA center for collecting the packet of each substation sent by the S&C server; analyzing the received packet from every adjacent substation; inspecting the payload of the received packet; and triggering an intrusion alarm to a SCADA operator when the power flow is not the same as the payload of the packets.

McCann, Roy A.↗

Southwestern Power Administration Annual Report 2012

Dear Secretary Moniz: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2012. In FY 2012, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $195 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

2012, annual report, southwestern, Arkansas, Kansa↗

Southwestern Power Administration Annual Report 2011

Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2011. In FY 2011, Southwestern delivered over 4.1 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Oklahoma, and Texas, generating $167 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

Arkansas, Kansas, Louisiana, Missouri, Oklahoma, T↗

Southwestern Power Administration Annual Report 2010

Dear Secretary Chu: I am pleased to present the financial statements and operating data for Southwestern Power Administration (Southwestern) for Fiscal Year (FY) 2010. In FY 2010, Southwestern delivered nearly 7.6 billion kilowatt-hours of energy to its wholesale customers in Arkansas, Kansas, Louisiana, Missouri, Texas, and Oklahoma, generating $189 million in revenue. In fulfilling its mission to market and reliably deliver renewable Federal hydroelectric power, Southwestern maintains 1,380 miles of high-voltage transmission lines, substations, and communications sites, contributing to the reliability of the regional and National electric grid. Southwestern also actively partners with the Department of Energy, the U.S. Army Corps of Engineers, Southwestern’s customers, and other Federal power stakeholders to most effectively balance their diverse interests with Southwestern’s mission while continuing to maximize Federal assets to repay the Federal investment in the 24 hydropower facilities within Southwestern’s marketing region. Southwestern is proud of its past successes, and we look forward to continuing to serve the Nation’s energy needs in the future. Sincerely, Christopher M. Turner Administrator

Arkansas, Kansas, Louisiana, Missouri, Texas, Okla↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗

Evaluation of IEC 62443 Standard Gaps for Electric Grid Substation Model Use Case

This report presents an evaluation of the IEC 62443 standards in the context of electric grid substations, as part of a collaborative effort among Sandia National Laboratories (SNL), Idaho National Laboratory (INL), and the National Renewable Energy Laboratory (NREL). The primary objective is to assess the applicability of these standards to enhance cybersecurity measures for industrial automation and control systems (IACS) within the energy sector. The evaluation identifies strengths, such as the scalability of security levels and the structured lifecycle guidance provided by IEC 62443. However, it also highlights significant gaps, including limited integration of physical security, insufficient guidance for legacy systems, and challenges in addressing emerging threats like supply chain vulnerabilities. Recommendations for refining the standards are proposed, including the need for tailored guidance for securing legacy systems, integrating physical security with cybersecurity frameworks, and enhancing interoperability across multi-vendor environments. By addressing these gaps, the IEC 62443 standards can be strengthened to ensure comprehensive cybersecurity for electric grid substations, thereby supporting the resilience and reliability of critical energy infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An expansion plan for the 60 Hz power distribution system at KSC: LC-39 substations load allocation plan

The increasing load density in the LC-39 area of Kennedy Space Center (KSC) can be met by either modifying the existing substation and increasing its capacity or by planning an additional new substation. Evidence that the later approach is more economical, enhances the system reliability, and would produce more satisfactory performance indices is provided. Network theory is the basis for the optimal location determination of the proposed substation. A load reallocation plan which minimizes investment cost and power losses and meets other desirable system features is drafted. The report should be useful to the system designer and can be a useful guideline for future facility planners.

Kalu, Alex↗

Zero-day Attack Detection in Digital Substations Using In-Context Learning

In this paper, we address the critical challenge of detecting zero-day attacks in digital substations that employ the IEC-61850 communication protocol to ensure the security and reliability of modern power systems. While many heuristic and machine learning (ML)-based methods have been proposed for attack detection in IEC-61850 digital substations, generalization to unknown or zero-day attacks remains a challenge. We propose an approach that leverages the in-context learning ability of transformer architecture, which enables the model to learn from a few examples of a new task without explicit retraining. Our experiments on the IEC-61850 dataset demonstrate that the proposed method achieves more than 87% detection accuracy on zero-day attacks while the existing baselines fail. We believe this work has the potential to enhance the security of digital substations by enabling the effective detection of zero-day attacks.

LIu, Chen-Ching [Virginia Tech] (ORCID:00000002894↗

A new HVdc Substation Architecture with Higher Power Transfer Capability

The power transferred through high voltage direct current transmission (HVdc) systems is increasing with increased resilience and reliability needs as well as large scale deployment of renewable energy systems. In this paper, a new HVdc substation (SS) architecture with higher power transfer capability is proposed. The HVdc converters or valve groups (VG) are connected in series and parallel fashion such that the total power rating of the SS is increased. The control challenges associated with such SS architecture are identified and appropriate control modifications are proposed. The same is verified through PSCAD based simulations.

Jaldanki, Sreenivasa↗

National Maglev initiative: California line electric utility power system requirements

The electrical utility power system requirements were determined for a Maglev line from San Diego to San Francisco and Sacramento with a maximum capacity of 12,000 passengers an hour in each direction at a speed of 300 miles per hour, or one train every 30 seconds in each direction. Basically the Maglev line requires one 50-MVA substation every 12.5 miles. The need for new power lines to serve these substations and their voltage levels are based not only on equipment loading criteria but also on limitations due to voltage flicker and harmonics created by the Maglev system. The resulting power system requirements and their costs depend mostly on the geographical area, urban or suburban with 'strong' power systems, or mountains and rural areas with 'weak' power systems. A reliability evaluation indicated that emergency power sources, such as a 10-MW battery at each substation, were not justified if sufficient redundancy is provided in the design of the substations and the power lines serving them. With a cost of $5.6 M per mile, the power system requirements, including the 12-kV DC cables and the inverters along the Maglev line, were found to be the second largest cost component of the Maglev system, after the cost of the guideway system ($9.1 M per mile), out of a total cost of $23 M per mile.

Save, Phil↗