Initial utility experience with cluster of three Mod-2 wind turbine systems
This paper describes the initial utility experiences of operating three MOD-2s during the Engineering Acceptance Testing. Electrical quantities of bus voltage, phase currents and power are initially being recorded to evaluate impacts to customers on the 69-kV subtransmission line during synchronization and operation of one or more WTSs. To date, effects on the system have been essentially undetectable. Measurements of television signal strengths were taken at an existing television remote pickup and relay station at the WTS site. Potential TV signal interference problems from the WTSs have been avoided by replacing the remote pickups with microwave repeater links for the four TV channels received from Portland, Oregon. Preliminary measurements of audible and sub-audible noise levels indicate that the upwind rotor, tubular tower design of the MOD-2 does not have the pulsing high intensity infrasound problems experienced by the MOD-1 machine at Boone, North Carolina.