Search NASA⌕ Search

SEARCH · Search NASA

Results for “superheat steam”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Development of a health monitoring framework: Application to a supercritical pulverized coal-fired boiler

In this study, this work details the development of a physics-based equipment health monitoring framework for a supercritical boiler, using first-principles models to estimate the remaining useful life (RUL) of its components. The framework accounts for fatigue and creep life consumption, generating spatio-temporal variations in mechanical and thermal stress. Analysis of the stress profile throughout the boiler highlights the finishing superheater inlet steam header as a vulnerable location susceptible to damage from cycling operation. The framework also yields quantified uncertainty in the RUL projection for specific locations, accounting for uncertainties in material properties and boiler operation. Results indicate that operational uncertainties (e.g., seasonal variation and operational strategy) and material properties (e.g., rupture time coefficients, Young’s modulus, yield strength, and coefficient of thermal expansion) significantly impact the RUL of the finishing superheater inlet steam header. Additionally, case studies demonstrate the use of the health monitoring framework as a predictive tool for operational planning under uncertainty, including scenarios with and without updates on the operation of the boiler.

20 FOSSIL-FUELED POWER PLANTS↗

Pyrolysis of Oils from Unconventional Resources

In this study, oils from various sources were subjected to pyrolysis conditions; that is, without oxidizer, as the samples were heated to 500 °C, and held at that temperature. The oils studied included: (1) heavy oil from Grassy Creek, Missouri; (2) oil from tar sands of Asphalt Ridge in Utah; (3) mid-continent oil shales of three formations (two of Chattanooga formation, Pennsylvanian (age) formation, and Woodford formation); and (4) a Colorado Piceance Basin shale. Differential scanning calorimetry (DSC) and thermogravimetric analysis (TGA) with either gas chromatography (GC) or mass spectrometry (MS) were used to quantify the produced gases evolved in the tests. Purge gases of helium, argon, and humid carbon dioxide were utilized. Larger scale pyrolysis tests were conducted in a tube furnace coupled to a MS and a GC. The results consistently showed that pyrolysis occurred between 300 °C and 500 °C, with the majority of gases being mainly hydrogen and light alkanes. This behavior was essentially consistent, regardless of the oil source.

42 ENGINEERING↗

Computer modeling of a regenerative solar-assisted Rankine power cycle

A detailed interpretation of the computer program that describes the performance of one of these cycles; namely, a regenerative Rankine power cycle is presented. Water is used as the working medium throughout the cycle. The solar energy collected at relatively low temperature level presents 75 to 80% of the total heat demand and provides mainly the latent heat of vaporization. Another energy source at high temperature level superheats the steam and supplements the solar energy share. A program summary and a numerical example showing the sequency of computations are included. The outcome from the model comprises line temperatures, component heat rates, specific steam consumption, percentage of solar energy contribution, and the overall thermal efficiency.

Lansing, F. L.↗

Technical Qualification of New Materials for High Efficiency Coal-Fired Boilers and Other Advanced FE Concepts: Haynes® 282® ASME Boiler and Pressure Vessel Code Case

This DOE Fossil Energy project, FEAA117, addressed materials issues relevant to qualifying and deploying a Ni-base alloy for a new application in an advanced ultra-supercritical coal-fired boiler. The goal was the deployment of Haynes International alloy Haynes® 282® for applications in superheaters, reheaters, and steam delivery pipes, by completing base metal, cross-weld and all-weld metal mechanical testing needed for an ASME Boiler and Pressure Vessel Code Case and the associated microstructural analyses needed for assurance of boiler-relevant lifetimes. The alloy also is of interest for other applications including supercritical CO₂ power generation cycles. Tensile testing was completed from 20°-927°C on the three base metal alloy 282 heats, two sets of cross-weld specimens and all weld metal specimens. A total of 148 creep tests with over 565,000 h of cumulative testing was completed on base metal, cross-weld and all weld metal specimens. This project was performed with cost share from Haynes International.

01 COAL, LIGNITE, AND PEAT↗

Characterizing and improving the performance of molten-salt-steam heat exchangers in concentrating solar power plants

Shell-and-tube heat exchangers (HXs) for steam generation from molten salts in concentrating solar power (CSP) plants experience thermal fatigue due to significant temperature gradients and inherent transient operation. Molten salt-steam HX design lifespans exceed actual lifespans, and, as a consequence, designers overpredict plant profitability and operators neglect appropriate prescriptions to optimize these lifetimes. Here, this study refines HX lifespan estimates with data benchmarked against thermal-fluid mechanical modeling of stress and accumulated fatigue. Reduced-order thermal models of the molten salt-steam, shell-and-tube evaporator and superheater predict transient temperature profiles along the two HXs salt-steam flow paths. The modeled evaporator and superheater temperature profiles enable assessment of cyclic stresses within the HX tubesheets, where molten-salt HX failures are most common. Evaporator and superheater performance data from a current 110 MW elec commercial CSP plant provide a basis for validating the reduced-order HX models. HX life predictions derived from stochastic failure distributions serve as inputs for simulating and optimizing existing plant operations. The impact of the updated lifespans on overall plant revenue depends on operating scenarios. This study suggests that typical ramping rates for a CSP plant with a high-temperature Rankine cycle result in an evaporator and superheater life of approximately 10 and 25 years, respectively, compared to the design target of 30 years. Reduced HX lifespans decrease operational plant revenue on average by 4.6-5.1%. Furthermore, there may be as many as four HX replacements over the 30-year lifetime of the plant; and, purchase agreement loss due to failure to meet contractual production requirements can have ramifications that include the risk of bankruptcy.

14 SOLAR ENERGY↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

The Effect of Shot Peening on Steam Oxidation of 304H Stainless Steel

Shot peening is currently utilized in coal-fired power plant components to mitigate scale exfoliation issues from steamside oxidation of austenitic stainless steel superheater and reheater tubing. To focus on commercially available material, this study exposed quarter-ring specimens cut from two different commercially shot peened type 304H tubes and exposed to 1 bar steam for up to 15,000 h at 550°, 600°, 625°, and 650 °C. Specimens were removed at increments to characterize the oxide thickness and microstructure. The shot peened inner surface generally retained a thin, protective Cr-rich scale with occasional Fe-rich oxide nodules at 550–625 °C. The increased oxidation resistance from shot peening began to degrade at 650 °C after as little as 5,000 h. Cut and polished faces of these specimens formed thick, Fe-rich oxides similar to polished 304H coupons. Surprisingly, the mechanically machined outer surface of the tube specimens performed similarly to the shot peened inner diameter, suggesting it had sufficient cold work to achieve a similar benefit. As a result, electron backscatter diffraction and Vickers-hardness measurements were used to characterize post-exposure changes in underlying microstructure and mechanical properties, respectively, imparted by shot peening.

36 MATERIALS SCIENCE↗

ADVANCED THERMAL-HYDRAULIC MODEL OF HEAT RECOVERY STEAM GENERATORS

Steam-side oxidation at elevated temperatures in heat recovery steam generators (HRSGs) can lead to overheating of local tubes, potential oxide scale exfoliation, and damage to critical equipment. Predicting the oxide growth distribution requires detailed knowledge of the distribution of tube metal temperatures. To address these challenges, a computational fluid dynamics (CFD) model of a high-pressure superheater (HPSH) was developed within the Siemens’ STAR-CCM+ CFD commercial software. The HPSH section of the steam generator was selected for modeling because of its high oxidation rates.The model development included several steps. In the first step, an oxidation model based on a parabolic oxidation relationship was implemented. The oxidation growth predicted by the model was then verified for a full-load boiler operation case. In the second step, a three-dimensional CFD model was developed to account for the thermal and flow physics involved in HRSGs. The CFD model was then verified and validated on a simplified geometry that contained six row-tubes which mimicked the tube arrangements of an HPSH section. Numerical results compared well with published experimental results. In the third step, the oxidation model was coupled to the HRSG’s CFD model, and a comparison study was performed for two cases: (a) regular finless tubes and (b) finned tubes. Preliminary results showed that the oxide thickness predicted by the case with tube fins was higher compared to that of the finless tube case, thus demonstrating the need to model the effects of the tube fins on oxide thickness.

Panicker, Nithin↗

Advanced Coating Compositions and Microstructures to Improve Uptime and Operational Flexibility in Cyclic, Low-Load Thermal Utility Plants

GE, the University of Tennessee, and Oak Ridge National Laboratory collaborated from 2020 to 2023 developing two key technologies for improving the viability of fuel switching and load following in thermal utility plants: a) cost-effective weld overlay compositions for boiler tubing b) cathodic arc coatings that deliver improvements in both erosion resistance and oxidation resistance in high temperature steam for HP turbine blades The team worked through a robust, logical project map to de-risk these two technologies and advance them from TRL 3 to TRL 6. For the cost-effective weld overlay, the team developed a ferritic filler material which was fabricated at a vendor for 18% the average market cost of Inconel 625 wire, had a corrosion rate 3x lower in conditions simulating a biomass-fired superheater and 10x lower in conditions simulating a coal-fired superheater, and was fabricated into prototype overlaid tubing that passed ASME requirements including transverse bending, dye penetrant inspection, and ASTM G-76 evaluation. For the cathodic arc coatings applied to steam turbine blades, the team developed a novel composition that was successfully transferred to a qualified vendor. The vendor was able to produce coated prototypes with 4x the as-deposited erosion resistance and 10.4x the post-steam-exposure erosion resistance of the TiN coating the vendor currently applies on GE steam turbine components, without significantly increasing process cost. These coated prototypes also passed a GE inspection and showed favorable performance in high temperature erosion, nanoindentation, sliding wear, scratch adhesion, and high cycle fatigue testing. If successfully deployed by GE, it is anticipated that the technologies will enable the following: • 25%-50% increase in time between outages for both boilers and HP turbines. • 50% decrease in cost for weld overlay on a per foot basis relative to todays NiCr alloys. • Adequate oxidation resistance and erosion for HP turbine inlet steam at >620°C and >220 bar. • No need for changes in component supply chain or any notable Capital Expenditures. 5 Decreasing component cost, increasing performance, and extending time between outages represent direct value propositions to GE and their customers. For the American consumer, these objectives translate into increased grid reliability (fewer unexpected outages), decreased Levelized Cost of Electricity, and improved environmental health (low-loading/load following to accelerate penetration of renewables). The results also have implications for wear resistant tooling, wire arc additive manufacturing, more durable components for syngas cleanup, and deployment of more efficient thermochemical pathways for carbon negative fuel production

09 BIOMASS FUELS↗

Dynamic Simulation of a Sub-Critical Coal Fired Power Plant

In order to address the demanding operating conditions for remaining coal-fired power plants, a dynamic model and a suite of tools have been developed for studying load cycling and to find optimization opportunities. A sub-critical steam cycle power plant was modeled in a flow-sheet modeling tool, APROS™. The model represented the firing system, economizer, evaporator, superheat, and reheat systems. Four loads from 100% TMCR to 25% TMCR were calibrated and tested such that low-to-high cycling could be studied. The model was run through various load cycles; one of which is presented here. This modeling is a prototype for general use in developing cutting edge controls products and for maximizing economic, low-emissions, and efficient operation of the existing coal power fleet.

Braun, Timothy↗

Data Analytics Applied to Coal Fired Boilers for Detecting Leaks

Data analytics were used to detect boiler leaks from five different coal-fired boilers including both subcritical and supercritical systems. Discriminant functions were developed that detected leaks up to two weeks prior to forced plant shutdowns for repairs. The leaks were identified to occur at different sections of the boiler for each plant, including waterwalls, economizer and superheater using conventional process measurement data. Leaking conditions were detected with a high degree of confidence (≪ 1% misclassified observations) and were able to distinguish normal operations from those time periods with steam leaks even while operating the power plants in power cycling mode.Multivariable statistical analyses, including Principal Component (PCA), cluster, and Fischer Discriminant Analysis (FDA) were used to characterize the leak occurrence. Normal and operational states with steam leaks were provided in the original process datasets. These datasets were split into two different groups for training and validation purposes. The data were sorted chronologically, and every third observation was assigned to training the Discriminant Function Model (DFM) while the rest were reserved for validation. PCA was used to reduce dimensionality of the original datasets. Canonical and FDA analyses were used to investigate the relationship between process variables. The outcome of the analyses revealed that nearly 35,000 observations were classified correctly; less than 0.05% of total observations were misclassified to be leaking, i.e. both false positives and false negatives.

Indrawan, Natarianto↗

A data-driven model for thermodynamic properties of a steam generator under cycling operation

The varying electricity demand from coal power plants due to the intermittent nature of renewable sources leads to load-follow and on/off operations referred to as cycling. Cycling causes transients of properties such as pressure and temperature within various components of the steam generation system.These transients cause increased damage because of fatigue and creep-fatigue interactions shortening the life of components. An algorithm is developed to identify cycling operations from the gross power data. The data-driven model based on artificial neural networks (ANN) is developed using 10 years data from Coal Creek Station power plant located in North Dakota, USA to estimate properties of the steam generator components during cycling operations. Furthermore, the uniqueness of this model is the ability to predict component properties for the cycling as well as base-load operations and is reported for the first time. The ANN model estimates the component properties, for a given gross power profile and initial conditions, as they vary during cycling operations. As a representative example, the ANN estimates are presented for the superheater outlet pressure, reheater inlet temperature, and flue gas temperature at the air heater inlet. The changes in these variables as a function of the gross power over the time duration are compared with measurements to assess the predictive capability of the model. Mean square errors of 4.49E-04 for superheater outlet pressure, 1.62E-03 for reheater inlet temperature, and 4.14E-04 for flue gas temperature at the air heater inlet were observed.

01 COAL, LIGNITE, AND PEAT↗

Dynamic energy system modeling using hybrid physics-based and machine learning encoder–decoder models

Three model configurations are presented for multi-step time series predictions of the heat absorbed by the water and steam in a thermal power plant. The models predict over horizons of 2, 4, and 6 steps into the future, where each step is a 5-minute increment. The evaluated models are a pure machine learning model, a novel hybrid machine learning and physics-based model, and the hybrid model with an incomplete dataset. The hybrid model deconstructs the machine learning into individual boiler heat absorption units: economizer, water wall, superheater, and reheater. Each configuration uses a gated recurrent unit (GRU) or a GRU-based encoder–decoder as the deep learning architecture. Mean squared error is used to evaluate the models compared to target values. The encoder–decoder architecture is over 11% more accurate than the GRU only models. The hybrid model with the incomplete dataset highlights the importance of the manipulated variables to the system. The hybrid model, compared to the pure machine learning model, is over 10% more accurate on average over 20 iterations of each model. Automatic differentiation is applied to the hybrid model to perform a local sensitivity analysis to identify the most impactful of the 72 manipulated variables on the heat absorbed in the boiler. The models and sensitivity analyses are used in a discussion about optimizing the thermal power plant.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Test and Validate Distributed Coaxial Cable Sensors for in situ Condition Monitoring of Coal-Fired Boiler Tubes

This project aims to test, validate, and advance the technology readiness level (from TRL5 to TRL7) of a novel low-cost distributed stainless-steel/ceramic coaxial cable sensing (SSC-CCS) technology for in situ monitoring of the boiler tube temperature in existing coal-fired power plants. The novel SSC-CCS sensing technology and associated condition-based monitoring (CBM) software to be demonstrated in this project will lead to an improved understanding of the boiler tube failure mechanisms and a prognostic system to improve the overall performance, reliability, and flexibility of the nation’s coal-fired power plant fleet. A boiler tube monitoring system with distributed coaxial cable temperature sensors and a sensor acquisition system was constructed. The high-temperature coaxial cable sensor with a length of 1.3m was made by using a quartz tube (1mm inner diameter (ID) and 6mm outer diameter (OD)) to concentrically separate a 304 stainless-steel (SS) rod (1mm OD) and SS tube (7.94mm OD and 6.16mm ID). The sensor acquisition system includes a vector network analyzer (VNA), a radio frequency (RF) power amplifier, multiple switches and a USB hub. The distributed stainless-steel quartz coaxial cable sensor (SSQ-CCS) had a linear response to temperature with a resolution uncertainty of σ = 0.77℃. To withstand the harsh conditions of 3,300 steam pressures and 800℃ high temperatures, the sensor was shielded by a protective tube made of the same material as the boiler tube. The protection tube had an OD of 1.5 inches and a thickness of 0.25 inches. In the laboratory tests, the sensor showed good sensitivity and fast response. The drift was bounded between +0.33% and -0.67% during a test at 600℃ for 350 hours, indicating good stability of the sensor. A field test was conducted where four sensors were welded on four superheat tubes (SH-Ts) at a coal-fired power station over 400 days. Conventional thermocouples were welded to the superheater tubes alongside the coaxial cable sensors for the purpose of comparison. Two sensors were capable of distributed sensing, with three multiplexed sensing sections. The other two sensors were single section. During the 400-day test period, the power plant experienced startups and shutdowns. At the steady state operations, the temperature of the boiler tube is about 600℃ (1112°F). The sensors recorded the entire coal-firing processes (start-up, steady state, and shut-down) and the glitch event. A GSM modem and a Watchdog were added to the system to ensure reliable data recording. The GSM modem sent daily messages to plant managers and Clemson team to inform the status of the sensor system. If the system was not normally working, the Watchdog would reboot the system automatically. The new coaxial cable based distributed sensing technology has been proven to be successful in both laboratory and field tests. A comprehensive four-stage multi-physics computational framework has been developed to assist the design, optimization, installation, and operation of SSQ-CCS. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. A conditional-based monitoring system is implemented as well. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

01 COAL, LIGNITE, AND PEAT↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗