Search NASA⌕ Search

SEARCH · Search NASA

Results for “supplier research and analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Supplier Research & Analysis Approach

"The implementation of NASA GSFC's portfolio of mission projects relies upon inter-connected, multi-tiered supply chains of organizations operating under direct and indirect contracts and other agreements throughout the U.S. and around the world. These supply chains are subject to an inter-related array of technical/production, business, market and security risks that are amplified by the ongoing globalization of industry and technology and which can disrupt or threaten the production and delivery of products and services when needed and in conformance with requirements. In recognition of such risks and associated challenges, GSFC's SMA directorate launched an innovative Supplier Research and Analysis (SRA) capability three years ago to gain greater insight into the operating environment, performance, capabilities and viability of current and prospective suppliers for GSFC projects and proposals. The capability uses business intelligence techniques and primarily open source information resources as part of a cost-effective, non-intrusive methodology to produce several types of research and analysis reports. The reports are based on a holistic analytical framework encompassing key technical/production, business enterprise management, market and security factors, and feature in-depth information, summary information profiles, SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis, and candidate risk concerns in order to pro-actively support SMA and project management needs. The SRA capability, which is designed to complement and support ongoing SMA/project management activities and practices, has produced over 95 reports since its start-up in early 2015. This presentation addresses the approach, methodology and performance of the Supplier Research and Analysis (SRA) capability and its value in assuring the success of NASA mission projects. In doing so, the presentation provides lessons-learned, best practices, case examples and address how it fits into the development of an enterprise-level Supply Chain Risk Management capability."

supplier research and analysis↗

An Integrated Platform for Mission Performance: Goddard Space Flight Center's Meta Information System

Successful management of NASA Goddard Space Flight Centers portfolio of mission projects (i.e. spacecraft, spacecraft instruments / subsystems, and ground systems) depends upon numerous processes, data and information resources coming together throughout the life-cycle of the projects to enable sound decision-making, risk reduction, conformance with requirements and continual improvement. In the summer of 2012, GSFC SMA management recognized that the set of legacy data systems used to support the SMA mission and responsibilities at GSFC were not effective, integrated nor on par with best practices. Accordingly, GSFC SMA management launched a project to transform the GSFC electronic management system to create and deploy an integrated, state-of-the-market information system for process performance, data management and analytics that is currently operating in support of GSFC overall mission performance. The information system, known as Meta, provides controlled, process-based applications, integrated data management, and analytics for a robust set of integrated applications. Since the inception of the project, a lean, award-winning SMA project team has thus far designed, configured and managed the system to serve as an integrated platform for 18 applications that support key processes for GSFC and the Science Mission Directorate at NASA headquarters, such as internal Management System assessments, Supplier Assessments, Supplier Research & Analysis, Problem Reporting for in-house mission projects, On-orbit Anomaly Reporting for GSFC-operated spacecraft, GSFC Project Life-Cycle Reviews, Risk Management and Reporting, and SMA Project Team Reporting. The system has experienced steady growth in utilization with 1,917 users (NASA employees and support contractor personnel) and 44 gigabytes of data and related files managed by the system as of the end of April 2018. Overall, Meta has achieved increasing levels of process management and real-time data / information integration to enable improved process performance, richer analytics and informed decision-making. This paper will present and examine the need, goals, approach and design driving the management and operation of the Meta information system and its ongoing growth as an integrated platform for advancing NASA mission performance.

Integration↗

Building Supply Chain Visibility for Risk Management: Illuminating the COVID-19 Pandemic Impact Upon NASA Suppliers

NASA mission projects rely upon global supply chains subject to an array of risks that threaten to disrupt or deny the timely, affordable provision of products and services as required for mission success. Visibility into these supply chains is key to the management of risks, such as those stemming from the coronavirus pandemic and its associated effects upon suppliers. Accordingly, the Supplier Research and Analysis (SRA) Program within Goddard Space Flight Center’s Safety and Mission Assurance (SMA) Directorate produced the COVID-19 pandemic/NASA suppliers dashboard as part of the NASA Meta Information System. The dashboard provides visibility and situational awareness to aid risk assessment, planning and decision-making over the course of the pandemic recovery phase. The approach of integrating data and information into visual dashboard displays has also been employed by the SRA Program to focus on specific risks pertaining to foreign-based suppliers. This webinar is presented by the NASA Office of SMA and its Supply Chain Risk Management Program, in collaboration with the NASA Safety Center and Goddard’s SMA Directorate.

supplier research and analysis, supply chain risk ↗

Supply Chain Research and Analysis: Illuminating Risks in Complex Systems

Framing the strategic challenge posed by the interconnected, multitiered supply chains of mission projects managed by the NASA Goddard Space Flight Center. Discussing conditions and risks which can disrupt or threaten the availability, production and delivery of products and services for complex space systems. Utilizing a holistic analytical framework, business intelligence techniques, an integrated information system platform and analytics to produce insight into suppliers / supply chains and associated risks. Advancing supply chain risk management capabilities to support the successful performance of space missions.

supply chain risk management↗

Supply Chain Research and Analysis for Space Systems

The implementation of NASA GSFC's portfolio of mission projects relies upon inter-connected, multi-tiered supply chains of organizations operating under direct and indirect contracts and other agreements throughout the U.S. and around the world. These supply chains are subject to an inter-related array of technical/production, business, market and security risks that are amplified by the ongoing globalization of industry and technology and which can disrupt or threaten the production and delivery of products and services when needed and in conformance with requirements. In recognition of such risks and associated challenges, GSFC's SMA directorate launched an innovative Supply Chain Research and Analysis capability three years ago to gain greater insight into the operating environment, performance, capabilities and viability of current and prospective suppliers for GSFC projects and proposals. The capability uses business intelligence techniques and primarily open source information resources as part of a cost-effective, non-intrusive methodology to produce several types of research and analysis reports. The reports are based on a holistic analytical framework encompassing key technical/production, business enterprise management, market and security factors, and feature in-depth information, summary information profiles, SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis, and candidate risk concerns in order to pro-actively support SMA and project management needs. The SRA capability, which is designed to complement and support ongoing SMA/project management activities and practices, has produced over 105 reports since its start-up in early 2015.This presentation addresses the approach, methodology and performance of the Supply Chain Research and Analysiscapability and its value in assuring the success of NASA mission projects. In doing so, the presentation provides lessons-learned, best practices, case examples and address how it fits into the development of an enterprise-level Supply Chain Risk Management capability.

supply chain risk management↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite's White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with and turnaround maintenance performed. The fight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development. NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This recent partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of the X-37 effort, the team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff research and development and provides valuable experience to implement the exploration vision.

Turner, Susan↗

Learning Lessons from the X-37 Project

The X-37 was planned as an automated vehicle capable of flight-testing new aerospace technologies in combined environments that are beyond the capability of existing ground or flight platforms. Flight demonstration with the X-37 architecture and configuration in relevant environments was planned to reduce the risk of developing launch vehicle technologies for sustainable, affordable exploration and other aerospace applications. Current plans are for the X-37 Approach and Landing Test Vehicle (ALTV) to be atmospheric tested in 2005 from Scaled Composite s White Knight carrier aircraft at up to 40,000 feet over California's Mojave Spaceport, with landing and turnaround maintenance performed. The Flight Operations Control Center will conduct the mission, using a streamlined operations concept. Taxi-tow and captive-carry tests will be conducted prior to the atmospheric-test series. Sponsored by the Defense Advanced Research Projects Agency (DARPA) with NASA participation, technical objectives are to: (1) mature Computed Air Data System/Remote Pressure Sensor technology, (2) manage energy during Terminal Area Energy Management/Heading Alignment Cone maneuvers, and (3) validate the aerodatabase. The X-37 Project began in 1999 under a cooperative agreement as an element of NASA's Future X Program and transitioned to a NASA Research Announcement under the Space Launch Initiative. In mid-2004, NASA transferred ownership to DARPA, with its heritage of performing high-risk, high-payoff research and development (R&D). NASA contributes technical expertise, including risk analysis and system integration. The Boeing Company is the prime contractor, with nationwide suppliers. This partnership exemplifies the synergy attainable when NASA Centers, other Government agencies, and industry work together toward a common goal - contributing to the knowledge base for U.S. exploration and other aerospace endeavors. The X-37 team represents a range of space transportation disciplines - from engineering to management. Some members have been with the project since its inception. All have gained priceless experience during the design, manufacturing, and testing of the ALTV, as well as through developing advanced orbital flight technologies, such as state-of-the-art Thermal Protection Systems and hot structures. Throughout this process, the X-37 Project team captures lessons that are directly applicable to other such efforts. The upcoming ALTV flights offer another dimension of data and first-hand experience that will prove invaluable to those designing new generations of reusable spacecraft. And ongoing technology developments will expand the aerospace knowledge base. Delivering prototype hardware is always a risky proposition. During the course of this effort, the X-37 team has experienced many challenging opportunities, delivering significant accomplishments and learning numerous lessons in the process. The ability to manage the risk landscape is key to overcoming obstacles, especially technical hurdles that are encountered in progressing hardware from design to flight. The approach to managing risk under this partnership is evolving but, in general, the team allocates resources to reduce the likelihood of severe-consequence risks, thus maximizing mission success and ensuring that the X-37 Project delivers value to its stakeholders. As the team sharpens its focus on operations, it continues to contribute knowledge to those who would undertake high-risk, high-payoff R&D and provides valuable experience to implement the Vision for Space Exploration.

Turner, Susan↗

Thermal Management System Sizing and Mission Analysis for the SUSAN Electrofan Aircraft

This paper will detail the design, sizing, and mission analysis for the thermal management system (TMS) for the Subsonic Single Aft eNgine (SUSAN) aircraft. Previous work has defined key performance parameters (KPPs) for the electrical power system on SUSAN. These KPPs, efficiency and specific power, were assigned values for each power system component at minimum, nominal, and maximum levels of technology development. The values were based on NASA’s research in Electrified Aircraft Propulsion (EAP) technology. A similar approach was taken in this work, defining and assigning values for KPPs for each component of the TMS. These KPPs are used as inputs to the TMS analysis and sizing and establish targets for future technology development. The minimum level is based on the current state of the art, using available data on commercial off-the-shelf products from suppliers, datasheets, or testing. The nominal level is based on recent published research and on-going NASA-funded work. The maximum level represents a projection of technology performance into the future.

Electrified Aircraft↗

Agricultural Aircraft Aid

Farmers are increasingly turning to aerial applications of pesticides, fertilizers and other materials. Sometimes uneven distribution of the chemicals is caused by worn nozzles, improper alignment of spray nozzles or system leaks. If this happens, job must be redone with added expense to both the pilot and customer. Traditional pattern analysis techniques take days or weeks. Utilizing NASA's wind tunnel and computer validation technology, Dr. Roth, Oklahoma State University (OSU), developed a system for providing answers within minutes. Called the Rapid Distribution Pattern Evaluation System, the OSU system consists of a 100-foot measurement frame tied in to computerized analysis and readout equipment. System is mobile, delivered by trailer to airfields in agricultural areas where OSU conducts educational "fly-ins." A fly-in typically draws 50 to 100 aerial applicators, researchers, chemical suppliers and regulatory officials. An applicator can have his spray pattern checked. A computerized readout, available in five to 12 minutes, provides information for correcting shortcomings in the distribution pattern.

Source record↗

Impact of Balance Of System (BOS) costs on photovoltaic power systems

The Department of Energy has developed a program to effect a large reduction in the price of photovoltaic modules, with significant progress already achieved toward the 1986 goal of 50 cents/watt (1975 dollars). Remaining elements of a P/V power system (structure, battery storage, regulation, control, and wiring) are also significant cost items. The costs of these remaining elements are commonly referred to as Balance-of-System (BOS) costs. The BOS costs are less well defined and documented than module costs. The Lewis Research Center (LeRC) in 1976/77 and with two village power experiments that will be installed in 1978. The costs were divided into five categories and analyzed. A regression analysis was performed to determine correlations of BOS Costs per peak watt, with power size for these photovoltaic systems. The statistical relationship may be used for flat-plate, DC systems ranging from 100 to 4,000 peak watts. A survey of suppliers was conducted for comparison with the predicted BOS cost relationship.

Hein, G. F.↗

Wind Tunnel Test Technique and Instrumentation Development at LaRC

LaRC has an aggressive test technique development program underway. This program has been developed using 3rd Generation R&D management techniques and is a closely coordinated program between suppliers and wind tunnel operators- wind tunnel customers' informal input relative to their needs has been an essential ingredient in developing the research portfolio. An attempt has been made to balance this portfolio to meet near term and long term test technique needs. Major efforts are underway to develop techniques for determining model wing twist and location of boundary layer transition in the NTF (National Transonic Facility). The foundation of all new instrumentation developments, procurements, and upgrades will be based on uncertainty analysis.

Putnam, Lawrence E.↗

Study of effects of fuel properties in turbine-powered business aircraft

Increased interest in research and technology concerning aviation turbine fuels and their properties was prompted by recent changes in the supply and demand situation of these fuels. The most obvious change is the rapid increase in fuel price. For commercial airplanes, fuel costs now approach 50 percent of the direct operating costs. In addition, there were occasional local supply disruptions and gradual shifts in delivered values of certain fuel properties. Dwindling petroleum reserves and the politically sensitive nature of the major world suppliers make the continuation of these trends likely. A summary of the principal findings, and conclusions are presented. Much of the material, especially the tables and graphs, is considered in greater detail later. The economic analysis and examination of operational considerations are described. Because some of the assumptions on which the economic analysis is founded are not easily verified, the sensitivity of the analysis to alternates for these assumptions is examined. The data base on which the analyses are founded is defined in a set of appendices.

Powell, F. D.↗

Energetics of muscle contraction: the whole is less than the sum of its parts

Understanding muscle energetics is a problem in optimizing supply of ATP to the demands of ATPases. The complexity of reactions and their fluxes to achieve this balance is greatly reduced by recognizing constraints imposed by the integration of common metabolites at fixed stoichiometry among modular units. ATPase is driven externally. Oxidative phosphorylation and glycogenolysis are the suppliers. We focus on their regulation which involves different controls, but reduces to two principles that enable facile experimental analysis of the supply and demand fluxes. The ratio of concentration of phosphocreatine (PCr) to ATP, not their individual values, sets the range of achievable concentrations of ADP in resting and active muscle (at fixed pH) in different cell types. This principle defines the fraction of available flux of oxidative phosphorylation utilized (at fixed enzyme activities). Then the kinetics of PCr recovery defines the kinetics of oxygen supply and substrate utilization. The second principle is the constancy of PCr and H(+) (lactate) production by glycogenolysis due to the coupling of ATPase and glycolysis. This principle enables glycogenolytic flux to be measured from intracellular proton loads. Further simplification occurs because the magnitude of the interacting fluxes and metabolite concentrations are specified within narrow limits when both the resting and active fluxes are quantified. Thus there is a small set of rules for assessing and understanding the thermodynamics and kinetics of muscle energetics.

NASA Program Biomedical Research and Countermeasur↗

Methodolgy For Evaluation Of Technology Impacts In Space Electric Power Systems

The Analysis and Management branch of the Power and Propulsion Office at NASA Glenn Research Center is responsible for performing complex analyses of the space power and In-Space propulsion products developed by GRC. This work quantifies the benefits of the advanced technologies to support on-going advocacy efforts. The Power and Propulsion Office is committed to understanding how the advancement in space technologies could benefit future NASA missions. They support many diverse projects and missions throughout NASA as well as industry and academia. The area of work that we are concentrating on is space technology investment strategies. Our goal is to develop a Monte-Carlo based tool to investigate technology impacts in space electric power systems. The framework is being developed at this stage, which will be used to set up a computer simulation of a space electric power system (EPS). The outcome is expected to be a probabilistic assessment of critical technologies and potential development issues. We are developing methods for integrating existing spreadsheet-based tools into the simulation tool. Also, work is being done on defining interface protocols to enable rapid integration of future tools. Monte Carlo-based simulation programs for statistical modeling of the EPS Model. I decided to learn and evaluate Palisade's @Risk and Risk Optimizer software, and utilize it's capabilities for the Electric Power System (EPS) model. I also looked at similar software packages (JMP, SPSS, Crystal Ball, VenSim, Analytica) available from other suppliers and evaluated them. The second task was to develop the framework for the tool, in which we had to define technology characteristics using weighing factors and probability distributions. Also we had to define the simulation space and add hard and soft constraints to the model. The third task is to incorporate (preliminary) cost factors into the model. A final task is developing a cross-platform solution of this framework.

Holda, Julie↗

Mechanical Properties and Microstructure Investigation of Lead Free Solder

While the electronics industry appears to be focusing on Sn-Ag-Cu as the alloy of choice for lead free electronics assembly, ,the exact composition varies by geographic region, supplier and user. Add to that dissolved copper and silver from the printed circuit board traces and surface finish, and there can be significant variation in the final solder joint composition. A systematic study of the mechanical and microstructural properties of Sn-Ag-Cu alloys with Ag varying from 2wt% to 4wt% and Cu varying from 0.5wt% to lSwt%, was undertaken in this research study. Different sample preparation techniques (water quenched, oil quenched and water quenched followed by reflow) were explored and the resulting microstructure compared to that of a typical reflowed lead free chip scale package (CSP) solder joint. Tensile properties (modulus, 0.2% yield strength and the ultimate tensile strength) and creep behavior of selected alloy compositions (Sn-4Ag-1 X u , Sn-4Ag-OSCu, Sn- 2Ag-1 X u , Sn-2Ag-OSCu, Sn-3.5Ag-O.SCu) were determined for three conditions: as- cast; aged for 100 hours at 125OC; and aged for 250 hours at 125OC. There was no significant difference in Young's Modulus as a function of alloy composition. After an initial decrease in modulus after 100 hours at 125"C, there was an insignificant change with further aging. The distribution of 0.2% strain yield stress and ultimate tensile strength as a function of alloy composition was more significant and decreased with aging time and temperature. The microstructures of these alloys were examined using light and scanning electron microscopy (LM and SEM) respectively and SEM based energy dispersive x-ray spectroscopy (EDS). Fracture surface and cross-section analysis were performed on the specimens after creep testing. The creep testing results and the effect of high temperature aging on mechanical properties is presented for the oil quenched samples. In general the microstructure of oil quenched specimen exhibited a eutectic region of Sn with moderately dispersed Ag3Sn intermetallic, surrounded by a dendritic Sn-rich phase. The SEM images of the fracture surface indicated the presence of a tough shear surface at the initial cavity break area and a break line in the middle of specimen along the failure direction. A hyperbolic-sine creep model was adopted and used to fit the creep experiment data. The effect on the mechanical properties by adding the quaternary element bismuth to the Sn-3.5Ag-0.8Cu alloy was measured and compared with the mechanical properties of the ternary alloys. The results of this research study provide necessary data for the modeling of solder joint reliability for a range of Sn-Ag-Cu compositions and a baseline for evaluating the effects of subsequent quaternary additions.

Wang, Qing↗