Synchronized Phasor Measurement Unit-based Central Controller for Normal and Contingent Operation of a High-Capacity HVDC Macrogrid for the Continental US

This paper presents a Synchronized Phasor Measurement Unit (PMU) based controller to support the coordination and operation of a high-capacity high-voltage direct current (HVDC) macrogrid transmission for the continental US. The proposed controller allows for optimal scheduling of each segment of the multi-terminal HVDC network under normal and contingent conditions, while considering minimum levels of frequency response requirements. The performance of the proposed controller is tested on a 100,222-bus representation of the US Eastern and Western interconnections. Results show that a centralized PMU-based controller improves the frequency nadir of the HVDC macrogrid under contingency conditions by 25.9%. Furthermore, the primary frequency response (PFR) of the HVDC macrogrid is increased by 33.4%. The performance of each interconnection under the largest credible contingency conditions is also discussed.

Mohan, Nihal↗

Extended real-time voltage instability identification method based on synchronized phasor measurements

This paper presents an extended adaptive approach designed to accurately estimate the Thévenin equivalent parameters using phasor measurements at a given bus for measurements lying in any of four quadrants of the PQ-plane. The improvement is achieved by using a new condition to properly update the estimated parameters after an initial guess. Based on an adaptive philosophy, the proposed approach can correctly account for the intrinsic nonlinearities of a power system, can provide a real-time estimation of Thévenin parameters, and does not require network topology knowledge. The method is validated using the Kundur 2-area system, showing estimation improvements compared to the current adaptive approach and the classical recursive least-squares method. The proposed approach is able to estimate both sides of the system with respect to the measurement bus. In addition, a data-driven voltage stability index is developed. To illustrate the performance of the proposed approach in a larger power system, a voltage stability assessment is carried out on the IEEE 39-bus system, considering the action of overexcitation limiters of generators and nonlinear loads. The proposed approach is suitable for applications that require an accurate Thévenin equivalent estimation in real-time, such as for voltage stability assessment. The new approach provides a reliable tool for the system operators to make proper and timely decisions.

42 ENGINEERING↗

Voltage Stability Assessment Using Synchronized Phasor Measurements Applied to the Argentine Power System

This paper presents tests of different methods for long term voltage stability analysis based on PMU measurements. In particular, Thevenin Impedance Matching and sensitivity calculation are studied. Simulation are performed in a modified Argentine power system model, to include the main components for studying long term voltage stability. Disconnection of a large Thermal Generating Station causing long-term voltage instability at Gran Buenos Aires Area is studied. It is shown that computing the apparent impedance of Thevenin equivalent at load bus from measurements taken at a single time but at various locations of the transmission corridor produce a significant reduction of the estimation error produce when only local measurements are used. Voltage Stability analysis is performed using a reduced power system model where changing parameters are fully computed through PMU data at each time. Over this reduced power system model, voltage stability index and sensibility calculations are performed.

Gill-Estebez, Pablo↗

Developing High PV Penetration Cases for Frequency Response Study of U.S. Western Interconnection

Recent large penetrations of solar photovoltaic (PV) generation and the inertial characteristics of inverter-based generation technologies have caught the attention of those in the electric power industry in the United States. This paper presents a systematic approach to developing test cases of high penetrations of PV for the Western Interconnection. First, to examine the accuracy of the base case model, the Western Electricity Coordinating Council (WECC) model is validated by using measurement data from synchronized phasor measurement units. Based on the 2022 Light Spring case, we developed four high PV penetration cases for the WECC system that are of interest to the industry: 5% PV+15 % wind, 25% PV+15% wind, 45% PV+15% wind, 65% PV+15% wind). Additionally, a method to project PV is proposed that is based on collected, realistic PV distribution information, including the current and future PV power plant locations and penetrations in the WECC system. Both the utility-scale PV plant and residential rooftop PV are included in this study.

14 SOLAR ENERGY↗

Precise synchronization of phasor measurements in electric power systems

Phasors representing positive sequence voltages and currents in a power network are in the most important parameters in several monitoring, control, and protection functions in interconnected electric power networks. Recent advances in computer relaying have led to very efficient and accurate phasor measurement systems. When the phasors to be measured are separated by hundreds of miles, it becomes necessary to synchronize the measurement processes, so that a consistent description of the state of the power system can be established. Global Positioning System (GPS) transmissions offer an ideal source for synchronization of phasor measurements. The concept and implementation of this technique are described. Several uses of synchronized phasor measurements are also described. Among these are improved state estimation algorithms, state estimator enhancements, dynamic state estimates, improved control techniques, and improved protection concepts.

Phadke, Arun G.↗

A Novel Method for Phasor Measurement Unit Sampling Time Error Compensation

This paper focuses on a novel method for successive approximation register analog to digital converter control in synchronized phasor measurement units (PMUs). To compensate for the sampling time error caused by the division remainder between the desirable sampling rate and the oscillator frequency, a variable sampling interval control method is presented by interlacing two integers under a proposed criterion. The frequency of the onboard oscillator is monitored in real-time using the pulse per second (PPS) timing reference from global positioning system. The sampling control is adaptively adjusted each second according to the latest estimated oscillator frequency. The “saw tooth” in phasor angle error and DC offset and spikes in frequency error can be effectively eliminated by applying the proposed method. The simulation and experiment results validate the effectiveness and accuracy of the proposed method, which is believed to be able to greatly improve the performance of PPS-disciplined synchronous sampling methods in PMUs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

REAL TIME SYSTEM OPERATIONS 2006-2007

The Real Time System Operations (RTSO) 2006-2007 project focused on two parallel technical tasks: (1) Real-Time Applications of Phasors for Monitoring, Alarming and Control; and (2) Real-Time Voltage Security Assessment (RTVSA) Prototype Tool. The overall goal of the phasor applications project was to accelerate adoption and foster greater use of new, more accurate, time-synchronized phasor measurements by conducting research and prototyping applications on California ISO's phasor platform - Real-Time Dynamics Monitoring System (RTDMS) -- that provide previously unavailable information on the dynamic stability of the grid. Feasibility assessment studies were conducted on potential application of this technology for small-signal stability monitoring, validating/improving existing stability nomograms, conducting frequency response analysis, and obtaining real-time sensitivity information on key metrics to assess grid stress. Based on study findings, prototype applications for real-time visualization and alarming, small-signal stability monitoring, measurement based sensitivity analysis and frequency response assessment were developed, factory- and field-tested at the California ISO and at BPA. The goal of the RTVSA project was to provide California ISO with a prototype voltage security assessment tool that runs in real time within California ISO?s new reliability and congestion management system. CERTS conducted a technical assessment of appropriate algorithms, developed a prototype incorporating state-of-art algorithms (such as the continuation power flow, direct method, boundary orbiting method, and hyperplanes) into a framework most suitable for an operations environment. Based on study findings, a functional specification was prepared, which the California ISO has since used to procure a production-quality tool that is now a part of a suite of advanced computational tools that is used by California ISO for reliability and congestion management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2020 IEEE PES Innovative Smart Grid Technologies Europe (ISGT-Europe)

Recent proliferation of distributed energy sources in distribution or sub-transmission systems necessitates close monitoring of these three-phase power grids which typically operate under unbalanced loading conditions. Unlike the transmission systems where the network equations are commonly based on the positive sequence component models, a detailed three phase model will have to be used in implementing network applications for these systems. In the specific case of the state estimator, where measurement and parameter errors may bias the solution, bad data and parameter error detection algorithms should also be incorporated. Implementing the state estimator and error detection algorithms for three-phase systems impose additional computational burden and modifications to the state estimation code. This paper proposes a practical solution to avoid these issues by using synchronized phasor measurements and modal decoupling. The previously developed parameter error detection algorithm based on the normalized Lagrange multipliers (NLM) test is applied to the measurements independently in each mode in parallel, not only saving CPU time but also avoiding new code development for a three-phase estimator. Different parameter error scenarios are created and tested to verify the effectiveness of the proposed error detection approach.

Khalili, Ramtin↗

A Distribution Level Wide Area Monitoring System for the Electric Power Grid–FNET/GridEye

The wide area monitoring system (WAMS) is considered a pivotal component of future electric power grids. As a pilot WAMS that has been operated for more than a decade, the frequency monitoring network FNET/GridEye makes use of hundreds of global positioning system-synchronized phasor measurement sensors to capture the increasingly complicated grid behaviors across the interconnected power systems. In this paper, the FNET/GridEye system is overviewed and its operation experiences in electric power grid wide area monitoring are presented. Particularly, the implementation of a number of data analytics applications will be discussed in details. FNET/GridEye lays a firm foundation for the later WAMS operation in the electric power industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SynchroPhasor Measurements: System Architecture and Performance Evaluation in Supporting Wide-Area Applications

The infrastructure of phasor measurements have evolved over the last two decades from isolated measurement units to networked measurement systems with footprints beyond individual utility companies. This is, to a great extent, a bottom-up self-evolving process except some local systems built by design. Given the number of phasor measurement units (PMUs) in the system is small (currently 70 each in western and eastern interconnections), current phasor network architecture works just fine. However, the architecture will become a bottleneck when large number of PMUs are installed (e.g. >1000~10000). The need for phasor architecture design has yet to be addressed. This paper reviews the current phasor networks and investigates future architectures, as related to the efforts undertaken by the North America SynchroPhasor Initiative (NASPI). Then it continues to present staged system tests to evaluate the performance of phasor networks, which is a common practice in the Western Electricity Coordinating Council (WECC) system. This is followed by field measurement evaluation and the implication of phasor quality issues on phasor applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Channel Matching Approach for Estimating Electromechanical Mode Shape and Coherence

A method of estimating a power system’s electromechanical mode shape and coherence from time synchronized phasor measurements is presented. The approach uses a parametric estimate of the transfer function (TF) between signals at different buses throughout the power system. The relationship between the TF and mode shape and coherence is reviewed. A non-causal autoregressive exogenous (ARX) model is used in a least squares (LS) minimization to estimate the TF parameters and to estimate the magnitude squared coherence function. The method is applied to both a simulated system and measured data from the western North American power system and is compared to the traditional Welch periodogram averaging approach.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electromechanical Mode On-line Estimation using Regularized Robust RLS Methods

This paper proposes a regularized robust recursive least squares (R3LS) method for on-line estimation of power-system electromechanical modes based on synchronized phasor measurement unit (PMU) data. The proposed method utilizes an autoregressive moving average exogenous (ARMAX) model to account for typical measurement data, which includes low-level pseudo-random probing, ambient, and ringdown data. A robust objective function is utilized to reduce the negative influence from non-typical data, which include outliers and missing data. A dy-namic regularization method is introduced to help include a priori knowledge about the system and reduce the influence of under-determined problems. Based on a 17-machine simulation model, it is shown through the Monte-Carlo method that the proposed R3LS method can estimate and track electromechanical modes by effectively using combined typical and non-typical measurement data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electromechanical Mode Online Estimation using Regularized Robust RLS Methods

This paper proposes a regularized robust recursive least square (R3LS) method for on-line estimation of power-system electromechanical modes based on synchronized phasor measurement unit (PMU) data. The proposed method utilizes an autoregressive moving average exogenous (ARMAX) model to account for typical measurement data, which includes low-level pseudo-random probing, ambient, and ringdown data. A robust objective function is utilized to reduce the negative influence from non-typical data, which include outliers and missing data. A dynamic regularization method is introduced to help include a priori knowledge about the system and reduce the influence of under-determined problems. Based on a 17-machine simulation model, it is shown through the Monte-Carlo method that the proposed R3LS method can estimate and track electromechani-cal modes by effectively using combined typical and non-typical measurement data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Characteristic Ellipsoid Methodology and Its Application in Power Systems

The characteristic ellipsoid (CELL) method to monitor dynamic behaviors of a power system is proposed. Multidimensional minimum-volume-enclosing characteristic ellipsoids are built using synchronized phasor measurements. System dynamic behaviors are identified by tracking the change rate of the CELL’s characteristic indices. Decision tree techniques are used to link the CELL’s characteristic indices and the system’s dynamic behaviors and to determine types, locations and related information about the dynamic behaviors. The knowledge base of representative transient events is created by offline simulations based on the full Western Electric Coordinating Council (WECC) model. Two case studies demonstrate that the CELL method combined with the decision trees can detect transient events and their features with good accuracy.

Characteristic ellipsoid, decision tree, event det↗

Developing Generic Dynamic Models for the 2030 Eastern Interconnection Grid

The Eastern Interconnection Planning Collaborative (EIPC) has built three major power flow cases for the 2030 Eastern Interconnection (EI) based on various levels of energy/environmental policy conditions, technology advances, and load growth. Using the power flow cases, this report documents the process of developing the generic 2030 dynamic models using typical dynamic parameters. The constructed model was validated indirectly using the synchronized phasor measurements by removing the wind generation temporarily.

54 ENVIRONMENTAL SCIENCES↗

Synchrophasor Based Tracking Three-Phase State Estimator and It's Applications

Electric power infrastructure is one of the critical resources of the nation. Its reliability in the face of natural or man-made catastrophes is of paramount importance for the economic and public health wellbeing of a modern society. Maintaining high levels of security for the high voltage transmission back bone of the electric supply network is a task requiring access to modern monitoring tools. These tools have been made particularly effective with the advent of synchronized phasor measurement units (PMUs) which became available in late 1990s, and have now become an indispensable for optimal monitoring, protection and control of the power grid. The present project was launched with an objective of demonstrating the value of the Wide Area Measurement System (WAMS) using PMUs and its applications on the Dominion Virginia Power High Voltage transmission grid. Virginia Tech is the birth place of PMUs, and was chosen to be the Principal Investigator of this project. In addition to Dominion Virginia Power, Quanta Technology of Raleigh, NC was selected to be co-Principal Investigators of this project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synchronous Phasor-like Measurements

Phasor measurement units struggle to make acceptable estimates of frequency and rate of change of frequency. The most important cause of the problem is that the quantity being measured is not actually a phasor. The paper substitutes a different equation for the phasor equatin, and obtains its solution by curve-fitting.

Kirkham, Harold↗