Search NASA⌕ Search

SEARCH · Search NASA

Results for “system tools”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

High power laser hydraulic fracturing, stimulation, tools systems and methods

There are provided high power laser perforation, hydraulic fracturing systems, tools and methods for the stimulation and recovery of energy sources, such as hydrocarbons, from a formation. These systems, tools and methods provide predetermined laser beam energy patterns, to provide for the down hole volumetric removal of custom geometries of materials, sealing of perforations, reperforations, refractures and other downhole actives.

42 ENGINEERING↗

CLIPS: An expert system tool for delivery and training

The C Language Integrated Production System (CLIPS) is a forward chaining rule-based language. The requirements necessary for an expert system tool which is used for development, delivery, and training are examined. Because of its high portability, low cost, and ease of integration with external systems, CLIPS has great potential as an expert system tool for delivery and training. In addition, its representation flexibility, debugging aids, and performance, along with its other strengths, make it a viable alternative for expert system development.

Riley, Gary↗

ART-Ada: An Ada-based expert system tool

The Department of Defense mandate to standardize on Ada as the language for software systems development has resulted in increased interest in making expert systems technology readily available in Ada environments. NASA's Space Station Freedom is an example of the large Ada software development projects that will require expert systems in the 1990's. Another large scale application that can benefit from Ada based expert system tool technology is the Pilot's Associate (PA) expert system project for military combat aircraft. Automated Reasoning Tool (ART) Ada, an Ada Expert system tool is described. ART-Ada allow applications of a C-based expert system tool called ART-IM to be deployed in various Ada environments. ART-Ada is being used to implement several prototype expert systems for NASA's Space Station Freedom Program and the U.S. Air Force.

Lee, S. Daniel↗

ART-Ada: An Ada-based expert system tool

The Department of Defense mandate to standardize on Ada as the language for software systems development has resulted in an increased interest in making expert systems technology readily available in Ada environments. NASA's Space Station Freedom is an example of the large Ada software development projects that will require expert systems in the 1990's. Another large scale application that can benefit from Ada based expert system tool technology is the Pilot's Associate (PA) expert system project for military combat aircraft. The Automated Reasoning Tool-Ada (ART-Ada), an Ada expert system tool, is explained. ART-Ada allows applications of a C-based expert system tool called ART-IM to be deployed in various Ada environments. ART-Ada is being used to implement several prototype expert systems for NASA's Space Station Freedom program and the U.S. Air Force.

Lee, S. Daniel↗

HiRel: Hybrid Automated Reliability Predictor (HARP) integrated reliability tool system, (version 7.0). Volume 1: HARP introduction and user's guide

The Hybrid Automated Reliability Predictor (HARP) integrated Reliability (HiRel) tool system for reliability/availability prediction offers a toolbox of integrated reliability/availability programs that can be used to customize the user's application in a workstation or nonworkstation environment. HiRel consists of interactive graphical input/output programs and four reliability/availability modeling engines that provide analytical and simulative solutions to a wide host of reliable fault-tolerant system architectures and is also applicable to electronic systems in general. The tool system was designed to be compatible with most computing platforms and operating systems, and some programs have been beta tested, within the aerospace community for over 8 years. Volume 1 provides an introduction to the HARP program. Comprehensive information on HARP mathematical models can be found in the references.

Bavuso, Salvatore J.↗

HiRel: Hybrid Automated Reliability Predictor (HARP) integrated reliability tool system, (version 7.0). Volume 3: HARP Graphics Oriented (GO) input user's guide

The Hybrid Automated Reliability Predictor (HARP) integrated Reliability (HiRel) tool system for reliability/availability prediction offers a toolbox of integrated reliability/availability programs that can be used to customize the user's application in a workstation or nonworkstation environment. HiRel consists of interactive graphical input/output programs and four reliability/availability modeling engines that provide analytical and simulative solutions to a wide host of highly reliable fault-tolerant system architectures and is also applicable to electronic systems in general. The tool system was designed at the outset to be compatible with most computing platforms and operating systems, and some programs have been beta tested within the aerospace community for over 8 years. This document is a user's guide for the HiRel graphical preprocessor Graphics Oriented (GO) program. GO is a graphical user interface for the HARP engine that enables the drawing of reliability/availability models on a monitor. A mouse is used to select fault tree gates or Markov graphical symbols from a menu for drawing.

Bavuso, Salvatore J.↗

HiRel: Hybrid Automated Reliability Predictor (HARP) integrated reliability tool system, (version 7.0). Volume 4: HARP Output (HARPO) graphics display user's guide

The Hybrid Automated Reliability Predictor (HARP) integrated Reliability (HiRel) tool system for reliability/availability prediction offers a toolbox of integrated reliability/availability programs that can be used to customize the user's application in a workstation or nonworkstation environment. HiRel consists of interactive graphical input/output programs and four reliability/availability modeling engines that provide analytical and simulative solutions to a wide host of highly reliable fault-tolerant system architectures and is also applicable to electronic systems in general. The tool system was designed at the outset to be compatible with most computing platforms and operating systems and some programs have been beta tested within the aerospace community for over 8 years. This document is a user's guide for the HiRel graphical postprocessor program HARPO (HARP Output). HARPO reads ASCII files generated by HARP. It provides an interactive plotting capability that can be used to display alternate model data for trade-off analyses. File data can also be imported to other commercial software programs.

Sproles, Darrell W.↗

User interface design of software tool system as a technology transfer vehicle

Design considerations of an on going research project for developing an effective and easy to use tool system that supports entire maintenance phases are introduced. The primary focus is the design of an intelligent user interface mechanism. By analyzing why existing tools and tool systems are not used very effectively, we can define user requirements for the user interface mechanisms, specify design criteria of user interface functions, and introduce some features of the implementation. Because this project is still in process, intermediate evaluation and expected effectiveness are discussed.

Miyamoto, I.↗

Expert systems tools for Hubble Space Telescope observation scheduling

The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

Miller, Glenn↗

pcircle - A Suite of Scalable Parallel File System Tools

Most of the software related to file system are written for conventional local file system, they are serialized and can't take advantage of the benefit of a large scale parallel file system. "pcircle" software builds on top of ubiquitous MPI in cluster computing environment and "work-stealing" pattern to provide a scalable, high-performance suite of file system tools. In particular - it implemented parallel data copy and parallel data checksumming, with advanced features such as async progress report, checkpoint and restart, as well as integrity checking.

WANG, FEIYI↗

pcircle - A Suite of Scalable Parallel File System Tools

Most of the software related to file system are written for conventional local file system, they are serialized and can't take advantage of the benefit of a large scale parallel file system. "pcircle" software builds on top of ubiquitous MPI in cluster computing environment and "work-stealing" pattern to provide a scalable, high-performance suite of file system tools. In particular - it implemented parallel data copy and parallel data checksumming, with advanced features such as async progress report, checkpoint and restart, as well as integrity checking.

WANG, FEIYI↗

Integrating Ground System Tools From Multiple Technologies Into a Single System Environment

With rapid technology changes and new and improved development techniques, it becomes extremely difficult to try to add capabilities to existing ground systems without wanting to replace the entire system. Replacing entire systems is not usually cost effective so there is a need to be able to slowly improve systems without long development times that introduce risk due to large amounts of change. The Marshall Space Flight Center s (MSFC) Payload Operations Integration Center (POIC) ground system provides command, telemetry, and payload planning systems in support of the International Space Station. Our systems have continuously evolved with technology changes due to hardware end of life issues, and also due to user requirement changes. As changes have been implemented, we have tried to take advantage of some of the latest technologies while at the same time maintaining certain legacy capabilities that are not cost affective to replace. One of our biggest challenges is to integrate all of these implementations into a single system that is usable, maintainable, and scalable. Another challenge is to provide access to our tools in such a way that users are not aware of all the various implementation methods and tools being used. This approach not only makes our system much more usable, it allows us to continue to migrate capabilities and to add capabilities without impacting system usability. This paper will give an overview of the tools used for MSFC ISS payload operations and show an approach for integrating various technologies into a single environment that is maintainable, flexible, usable, cost effective, and that meets user needs.

Ritter, George H.↗

Expert systems tools for Hubble Space Telescope observation scheduling

This paper discusses the utility of expert systems techniques for Hubble Space Telescope (HST) planning and scheduling and describes a plan for development of expert system tools which will augment the existing ground system. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.

Miller, Glenn↗

Standards for evaluating expert system tools

A brief survey of the literature and proposal for a standard methodology for evaluating expert system building tools are discribed. Criteria for expert systems environmental factors and expert systems tool features are also discussed.

Beach, Sharon S.↗

HiRel: Hybrid Automated Reliability Predictor (HARP) integrated reliability tool system, (version 7.0). Volume 2: HARP tutorial

The Hybrid Automated Reliability Predictor (HARP) integrated Reliability (HiRel) tool system for reliability/availability prediction offers a toolbox of integrated reliability/availability programs that can be used to customize the user's application in a workstation or nonworkstation environment. The Hybrid Automated Reliability Predictor (HARP) tutorial provides insight into HARP modeling techniques and the interactive textual prompting input language via a step-by-step explanation and demonstration of HARP's fault occurrence/repair model and the fault/error handling models. Example applications are worked in their entirety and the HARP tabular output data are presented for each. Simple models are presented at first with each succeeding example demonstrating greater modeling power and complexity. This document is not intended to present the theoretical and mathematical basis for HARP.

Rothmann, Elizabeth↗

Benchmarking expert system tools

As part of its evaluation of new technologies, the Artificial Intelligence Section of the Mission Planning and Analysis Div. at NASA-Johnson has made timing tests of several expert system building tools. Among the production systems tested were Automated Reasoning Tool, several versions of OPS5, and CLIPS (C Language Integrated Production System), an expert system builder developed by the AI section. Also included in the test were a Zetalisp version of the benchmark along with four versions of the benchmark written in Knowledge Engineering Environment, an object oriented, frame based expert system tool. The benchmarks used for testing are studied.

Riley, Gary↗

Nanocoatings for High-Efficiency Industrial and Tooling Systems

This industry-driven project was the result of a successful response by Eaton Corporation to a DOE/ITP Program industry call. It consisted of three phases in which ORNL participated. In addition to Eaton Corporation and ORNL (CRADA), the project team included Ames Laboratory, who developed the underlying concept for aluminum-magnesium-boron based nanocomposite coatings [1], and Greenleaf, a small tooling manufacturer in western Pennsylvania. This report focuses on the portion of this work that was conducted by ORNL in a CRADA with Eaton Corporation. A comprehensive final report for the entire effort, which ended in September 2010, has been prepared by Eaton Corporation. Phase I, “Proof of Concept” ran for one year (September 1, 2006 to September 30, 2007) during which the applicability of AlMgB14 single-phase and nanocomposite coatings on hydraulic material coupons and components as well as on tool inserts was demonstrated.. The coating processes used either plasma laser deposition (PLD) or physical vapor deposition (PVD). During Phase I, ORNL conducted laboratory-scale pin-on-disk and reciprocating pin-on-flat tests of coatings produced by PLD and PVD. Non-coated M2 tool steel was used as a baseline for comparison, and the material for the sliding counterface was Type 52100 bearing steel since it simulated the pump materials. Initial tests were run mainly in a commercial hydraulic fluid named Mobil DTE-24, but some tests were later run in a water-glycol mixture as well. A tribosystem analysis was conducted to define the operating conditions of pump components and to help develop simulative tests in Phase II. Phase II, “Coating Process Scale-up” was intended to use scaled-up process to generate prototype parts. This involved both PLD practices at Ames Lab, and a PVD scale-up study at Eaton using its production capable equipment. There was also a limited scale-up study at Greenleaf for the tooling application. ORNL continued to conduct friction and wear tests on process variants and developed tests to better simulate the applications of interest. ORNL also employed existing lubrication models to better understand hydraulic pump frictional behavior and test results. Phase III, “Functional Testing” focused on finalizing the strategy for commercialization of AlMgB14 coatings for both hydraulic and tooling systems. ORNL continued to provide tribology testing and analysis support for hydraulic pump applications. It included both laboratory-scale coupon testing and the analysis of friction and wear data from full component-level tests performed at Eaton Corp. Laboratory-scale tribology test methods are used to characterize the behavior of nanocomposite coatings prior to running them in full-sized hydraulic pumps. This task also includes developing tribosystems analyses, both to provide a better understanding of the performance of coated surfaces in alternate hydraulic fluids, and to help design useful laboratory protocols. Analysis also includes modeling the lubrication conditions and identifying the physical processes by which wear and friction of the contact interface changes over time. This final report summarizes ORNL’s portion of the nanocomposite coatings development effort and presents both generated data and the analyses that were used in the course of this effort.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Continued Development of Expert System Tools for NPSS Engine Diagnostics

The objectives of this grant were to work with previously developed NPSS (Numerical Propulsion System Simulation) tools and enhance their functionality; explore similar AI systems; and work with the High Performance Computing Communication (HPCC) K-12 program. Activities for this reporting period are briefly summarized and a paper addressing the implementation, monitoring and zooming in a distributed jet engine simulation is included as an attachment.

Lewandowski, Henry↗