Search NASA⌕ Search

SEARCH · Search NASA

Results for “tank vaults”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Plutonium Finishing Plant (PFP) 241-Z Liquid Waste Treatment Facility Deactivation and Demolition

Fluor Hanford, Inc. (FH) is proud to submit the Plutonium Finishing Plant (PFP) 241-Z liquid Waste Treatment Facility Deactivation and Demolition (D&D) Project for consideration by the Project Management Institute as Project of the Year for 2008. The decommissioning of the 241-Z Facility presented numerous challenges, many of which were unique within the Department of Energy (DOE) Complex. The majority of the project budget and schedule was allocated for cleaning out five below-grade tank vaults. These highly contaminated, confined spaces also presented significant industrial safety hazards that presented some of the most hazardous work environments on the Hanford Site. The 241-Z D&D Project encompassed diverse tasks: cleaning out and stabilizing five below-grade tank vaults (also called cells), manually size-reducing and removing over three tons of process piping from the vaults, permanently isolating service utilities, removing a large contaminated chemical supply tank, stabilizing and removing plutonium-contaminated ventilation ducts, demolishing three structures to grade, and installing an environmental barrier on the demolition site. All of this work was performed safely, on schedule, and under budget. During the deactivation phase of the project between November 2005 and February 2007, workers entered the highly contaminated confined-space tank vaults 428 times. Each entry (or 'dive') involved an average of three workers, thus equaling approximately 1,300 individuals confined -space entries. Over the course of the entire deactivation and demolition period, there were no recordable injuries and only one minor reportable skin contamination. The 241-Z D&D Project was decommissioned under the provisions of the 'Hanford Federal Facility Agreement and Consent Order' (the Tri-Party Agreement or TPA), the 'Resource Conservation and Recovery Act of 1976' (RCRA), and the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980' (CERCLA). The project completed TPA Milestone M-083-032 to 'Complete those activities required by the 241-Z Treatment and Storage Unit's RCRA Closure Plan' four years and seven months ahead of this legally enforceable milestone. In addition, the project completed TPA Milestone M-083-042 to 'Complete transition and dismantlement of the 241-2 Waste Treatment Facility' four years and four months ahead of schedule. The project used an innovative approach in developing the project-specific RCRA closure plan to assure clear integration between the 241-Z RCRA closure activities and ongoing and future CERCLA actions at PFP. This approach provided a regulatory mechanism within the RCRA closure plan to place segments of the closure that were not practical to address at this time into future actions under CERCLA. Lessons learned from th is approach can be applied to other closure projects within the DOE Complex to control scope creep and mitigate risk. A paper on this topic, entitled 'Integration of the 241-Z Building D and D Under CERCLA with RCRA Closure at the PFP', was presented at the 2007 Waste Management Conference in Tucson, Arizona. In addition, techniques developed by the 241-Z D&D Project to control airborne contamination, clean the interior of the waste tanks, don and doff protective equipment, size-reduce plutonium-contaminated process piping, and mitigate thermal stress for the workers can be applied to other cleanup activities. The project-management team developed a strategy utilizing early characterization, targeted cleanup, and close coordination with PFP Criticality Engineering to significantly streamline the waste- handling costs associated with the project . The project schedule was structured to support an early transition to a criticality 'incredible' status for the 241-Z Facility. The cleanup work was sequenced and coordinated with project-specific criticality analysis to allow the fissile material waste being generated to be managed in a bulk fashion, instead of individual waste packages. This approach negated the need for real-time assay of individual waste packages, greatly improving the efficiency of the cleanup operation. The cleanup and stabilization of the 241-2 Liquid Effluent Treatment Facility reduced radiological risks to the environment and Hanford site workers. It was recognized as a success by regulatory agencies, the media, the DOE-client, and stakeholders. The 241-Z D&D Project demonstrated management excellence in adapting to significant changes in project direction, fostered a safety culture that amassed impressive results on this high-hazard job, maintained excellent communications with the client and stakeholders, and developed and implemented unique cleanup techniques.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Closure Progress at the Department of Energy's Idaho National Engineering Laboratory Tank Farm Facility

Significant progress has been made at the U.S. Department of Energy (DOE) Idaho National Laboratory (INL) to empty, clean and close radioactive liquid waste storage tanks at the Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility (TFF). The TFF includes eleven 1,135.6-kL (300,000-gal) underground stainless steel storage tanks and four smaller, 113.5-kL (30,000-gal) stainless steel tanks, along with tank vaults, interconnecting piping, and ancillary equipment. The TFF tanks have historically been used to store a variety of radioactive liquid waste, including wastes associated with past spent nuclear fuel reprocessing. Although four of the large storage tanks remain in use for waste storage, the other seven 1,135.6-kL (300,000-gal) tanks and the four 113.5-kL (30,000-gal) tanks have been emptied of waste, cleaned and filled with grout. A water spray cleaning system was developed and deployed to clean internal tank surfaces and remove remaining tank wastes. The cleaning system was effective in removing all but a very small volume of solid residual waste particles. Recent issuance of an Amended Record of Decision (ROD) in accordance with the National Environmental Policy Act, and a Waste Determination complying with Section 3116 of the Ronald W. Reagan National Defense Authorization Act (NDAA) for Fiscal Year 2005, has allowed commencement of grouting activities on the cleaned tanks. The first three 113.5-kL (30,000-gal) tanks were grouted in the Fall of 2006 and the fourth tank and the seven 1,135.6-kL (300,000-gal) tanks were filled with grout in 2007 to provide long-term stability. It is currently planned that associated tank valve boxes and interconnecting piping, will be stabilized with grout as early as 2008. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural Integrity Program for the 300,000-Gallon Radioactive Liquid Waste Storage Tanks at the Idaho Nuclear Technology and Engineering Center

This report provides a record of the Structural Integrity Program for the 300,000-gal liquid waste storage tanks and associated equipment at the Idaho Nuclear Technology and Engineering Center, as required by U.S. Department of Energy M 435.1-1, “Radioactive Waste Management Manual.” This equipment is known collectively as the Tank Farm Facility. This report is an update, and replaces the previous report by the same title issued April 2003. The conclusion of this report is that the Tank Farm Facility tanks, vaults, and transfer systems that remain in service for storage are structurally adequate, and are expected to remain structurally adequate over the remainder of their planned service life through 2012. Recommendations are provided for continued monitoring of the Tank Farm Facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research Technology Laboratory (RTL) Disposition Program Final Status Survey Report

As part of the Battelle Facility Restoration Program (Smoter and Biebesheimer 2017), the Research Technology Laboratory (RTL) Complex was remediated through demolition and surveyed to show it meets the radiological release criteria for unrestricted use under the clearance process (DOE 2011). The restoration program has directed the implementation of the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) methodology (NRC 2011) to verify the suitability of the site to be released for unrestricted use under the clearance process in U.S. Department of Energy (DOE) Order 458.1 (Biebesheimer 2018a; DOE 2011). The use of MARSSIM is accepted by federal and state agencies, including DOE. This report documents how the MARSSIM process was used to assure any residual radioactivity is within acceptable levels and as low as reasonably achievable. Past land use for the RTL Complex property included agricultural, residential, and industrial activity. The historical site assessment (HSA) (Lindenmeier et al. 2015; Biebesheimer 2018b) identified use of radionuclides in past RTL Complex research and development activities from commissioning in 1966 until it was vacated in 2017. Based on the information provided in the HSA, the RTL Complex was delineated into six survey units. The 520 building footprint, tank vault and 530 building footprint, other building footprints, and pipeline survey units included excavated areas. The paved areas and open areas survey units were unexcavated areas. Survey units were all determined to be Class 3, with low probability of containing residual radioactivity, after demolition of the structures within the RTL Complex. The Research Technology Laboratory (RTL) Disposition Program: Final Status Survey Plan (Bunn et al. 2018) was designed and conducted to provide quantitative data regarding the residual radioactivity present in each survey unit. Authorized radiological release limits were developed and approved by the DOE Office of Science in December 2016 (DOE 2017). Fourteen random sample locations were identified within each survey unit. Forty-four specific judgmental sample locations were selected across the site based on information in the HSA. The number of sample locations within a survey unit ranged from 15 to 28, for a total of 127 random and judgmental sample locations identified across the RTL Complex. Sampling for the final status survey occurred over 12 days between November 11 and December 7, 2018. Laboratory results were independently validated by Analytical Quality Associates prior to evaluation. All of the over 880 residual radioactivity measurements were less than the release limits and action levels established through the RTL Disposition Program. A sum of fractions calculation for each survey unit resulted in values that were less than unity. Based on the results presented in this report, the restoration program recommends that the RTL Complex be released for unrestricted use.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiochemical Processing Laboratory High-Level Vault Characterization Report

In July and August 2007, RPL Transition Project staff safely performed field work to remotely characterize the A, B, and C HLVs in the RPL. This report documents the methods and equipment used to collect radiological and chemical characterization samples and summarizes the analytical results.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Application of Direct Assessment Approaches and Methodologies to Cathodically Protected Nuclear Waste Transfer Lines

The U.S. Department of Energy's (DOE) Hanford Site is responsible for the safe storage, retrieval, treatment, and disposal of approximately 54 million gallons (204 million liters) of radioactive waste generated since the site's inception in 1943. Today, the major structures involved in waste management at Hanford include 149 carbon steel single-shell tanks, 28 carbon-steel double-shell tanks, plus a network of buried metallic transfer lines and ancillary systems (pits, vaults, catch tanks, etc.) required to store, retrieve, and transfer waste within the tank farm system. Many of the waste management systems at Hanford are still in use today. In response to uncertainties regarding the structural integrity of these systems,' an independent, comprehensive integrity assessment of the Hanford Site piping system was performed. It was found that regulators do not require the cathodically protected pipelines located within the Hanford Site to be assessed by External Corrosion Direct Assessment (ECDA) or any other method used to ensure integrity. However, a case study is presented discussing the application of the direct assessment process on pipelines in such a nuclear environment. Assessment methodology and assessment results are contained herein. An approach is described for the monitoring, integration of outside data, and analysis of this information in order to identify whether coating deterioration accompanied by external corrosion is a threat for these waste transfer lines.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

OVERVIEW OF THE U.S. DEPARTMENT OF ENERGY AND NUCLEAR REGULATORY COMMISSION PERFORMANCE ASSESSMENT APPROACHES: CEMENTITIOUS BARRIERS PARTNERSHIP

Engineered barriers including cementitious barriers are used at sites disposing or contaminated with low-level radioactive waste to enhance performance of the natural environment with respect to controlling the potential spread of contaminants. Drivers for using cementitious barriers include: high radionuclide inventory, radionuclide characteristics (e.g., long half-live, high mobility due to chemical form/speciation, waste matrix properties, shallow water table, and humid climate that provides water for leaching the waste). This document comprises the first in a series of reports being prepared for the Cementitious Barriers Partnership. The document is divided into two parts which provide a summary of: (1) existing experience in the assessment of performance of cementitious materials used for radioactive waste management and disposal and (2) sensitivity and uncertainty analysis approaches that have been applied for assessments. Each chapter is organized into five parts: Introduction, Regulatory Considerations, Specific Examples, Summary of Modeling Approaches and Conclusions and Needs. The objective of the report is to provide perspective on the state of the practice for conducting assessments for facilities involving cementitious barriers and to identify opportunities for improvements to the existing approaches. Examples are provided in two contexts: (1) performance assessments conducted for waste disposal facilities and (2) performance assessment-like analyses (e.g., risk assessments) conducted under other regulatory regimes. The introductory sections of each section provide a perspective on the purpose of performance assessments and different roles of cementitious materials for radioactive waste management. Significant experience with assessments of cementitious materials associated with radioactive waste disposal concepts exists in the US Department of Energy Complex and the commercial nuclear sector. Recently, the desire to close legacy facilities has created a need to assess the behavior of cementitious materials for applications in environmental remediation and decontamination and decommissioning (D&D) applications. The ability to assess the use and benefits of cementitious materials for these applications can significantly affect decisions related to cleanup activities. For example the need for costly remedial actions may not be necessary if existing or new cementitious barriers were adequately represented. The sections dealing with regulatory considerations include summaries of the different regulations that are relevant for various applications involving cementitious materials. A summary of regulatory guidance and/or policies pertaining to performance assessment of cementitious materials and sensitivity and uncertainty analyses is also provided in the following chapters. Numerous examples of specific applications are provided in each report. The examples are organized into traditional waste disposal applications (performance assessments), applications related to environmental remediation and D&D, and reactor and spent fuel related assessments. Sections that discuss specific facilities or sites contain: (1) descriptions of the role of the cementitious barriers or sensitivity/uncertainty analysis, (2) parameter assumptions and conceptual models, and (3) a relative discussion of the significance in the context of the assessment. Examples from both the U.S. Department of Energy Sites and the U.S. Nuclear Regulatory Commission are provided to illustrate the variety of applications and approaches that have been used. In many cases, minimal credit was taken for cementitious barriers. However, in some of those cases, benefits of being able to take credit for barriers were identified. The examples included: (1) disposal facilities (vaults, trenches, tank closures, cementitious waste forms and containers, etc.), (2) environmental remediation (old disposal facilities), (3) reactor and large structure decommissioning, and (4) spent fuel pools. These examples were selected to provide a perspective on the various needs, capabilities to model cementitious barriers, and use of sensitivity and uncertainty analysis and were not intended to include all cementitious barriers used in all low-level waste related PAs. The summary section in each report/chapter provides an overview of important considerations for the examples and compares and contrasts the different approaches that have been used. For example, specific time dependent physical processes (changes in hydraulic conductivity) and chemical processes (partitioning coefficients, and solubility coefficients) are identified and compared. The summary section also identifies key needs for future assessments. The Cementitious Barriers Partnership was established to address the key needs related to the use of cementitious barriers - waste forms, containment structures, physical stabilization fill materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SALTSTONE PROCESSING FACILITY TRANSFER SAMPLE

On May 19, 2010, the Saltstone Production Facility inadvertently transferred 1800 gallons of untreated waste from the salt feed tank to Vault 4. During shut down, approximately 70 gallons of the material was left in the Saltstone hopper. A sample of the slurry in the hopper was sent to Savannah River National Laboratory (SRNL) to analyze the density, pH and the eight Resource Conservation and Recovery Act (RCRA) metals. The sample was hazardous for chromium, mercury and pH. The sample received from the Saltstone hopper was analyzed visually while obtaining sample aliquots and while the sample was allowed to settle. It was observed that the sample contains solids that settle in approximately 20 minutes (Figure 3-1). There is a floating layer on top of the supernate during settling and disperses when the sample is agitated (Figure 3-2). The untreated waste inadvertently transferred from the SFT to Vault 4 was toxic for chromium and mercury. In addition, the pH of the sample is at the regulatory limit. Visually inspecting the sample indicates solids present in the sample.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Subsidence Risk Mitigation in LLW Final Covers: A Case History - 18286

Typical waste packaging and disposal practices at low-level radioactive waste (LLW) disposal facilities, while adequate for safe transportation and facility operations, introduce significant subsidence risk for the facilities' final cover systems. Subsidence is often caused by the collapse of voids in the waste packaging and surrounding cover soils that eventually propagate to the ground surface. This subsidence could result in the loss of final cover system integrity, stormwater ponding, concentrated flow of surface water and/or gas, increased leachate generation, transport of contaminants from the landfill, and potential adverse chemical reactions within the waste mass. For new LLW facilities, steps can be taken to minimize the subsidence potential of newly placed waste. However, there is a significant inventory of existing disposal facilities (trenches, pits, shafts, vaults, etc.), tank farms, and historic, subsurface burial grounds that require final covers - all of which present real subsidence risks. Final covers for these existing LLW disposal sites can be engineered to mitigate these risks. A case history of a 60-acre LLW final cover system design and construction project illustrates an innovative approach to this problem that offers superior risk mitigation compared to typical final cover design practice. This approach combines engineering simulations of the projected final cover mechanical performance, specific probabilistic performance targets, and targeted cover system improvements to manage the subsidence risk in the final design. The result is a successful final cover project that meets the needs of the community, state and federal regulators, and facility owner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Preliminary Performance Assessment to Support Single-Shell Tank Waste Retrieval - 19446

A preliminary Performance Assessment (PA) of Single-Shell Tank (SST) Waste Management Area A-AX (WMA A-AX) located at DoE's Hanford Site in southeastern Washington is being conducted to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO), as well as other Federal and State requirements of closure plans and permits. The WMA A-AX PA effort is assessing the fate, transport, and impacts of radionuclides and hazardous chemicals within residual wastes left in tanks, ancillary equipment, and facilities in their assumed closed configuration, and the subsequent risks to humans into the far future. WMA A-AX includes the 241-A Tank Farm (A Farm), the 241-AX Tank Farm (AX Farm), and the ancillary equipment associated with each Farm. There are six underground SSTs in A Farm, and four underground SSTs in AX Farm. Each of these SSTs have a storage capacity of 1,000,000 gallons. A complex waste transfer system of ancillary equipment supported the transfer and storage of waste within WMA A-AX SSTs. This ancillary equipment includes transfer lines, catch tanks, diversion boxes, vaults, valve pits, and other miscellaneous structures. This paper emphasizes the development of the PA effort focused on radiological impacts to meet the requirements for a closure authorization under DOE Order 435.1. Lessons learned from retrieval and development of a recently completed PA of the nearby Waste Management Area C (WMA C) led to the decision to develop a preliminary PA for WMA A-AX prior to initiation of retrieval efforts so that a site-specific risk management capability could be available to support anticipated retrieval decisions. The technical approach for the PA analysis includes developing both a process-level model using site-specific hydrogeological data, as well as a system-level model. The system model is being developed to facilitate uncertainty and sensitivity analyses being conducted in the PA effort. Preliminary results of the DOE Order 435.1 PA are evaluating potential impacts to the groundwater and air pathways to determine radiation exposure once radionuclides are released to the environment from residual waste after closure of the tank farm. To meet other analysis requirements in DOE Order 435.1, the PA effort must also evaluate potential radiological impacts from inadvertent intruder scenarios into the closed WMA A-AX facility. The results of the PA evaluation will be compared to performance objectives and measures in the DOE Order 435.1 to support retrieval and eventual closure decisions at WMA A-AX. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Skylab neutron environment experiment (Science Demonstration SD-34 (TV108)). Description and preliminary results

Neutron and proton induced radioactivity at various locations within Skylab were measured. Samples of five metals were formed into activation packets and deployed at the following locations on the Skylab 4 mission: orbital workshop film vault, water storage tank, and two opposing orbital workshop internal locations. Radioactive nuclides were produced in the packets by nuclear interactions of high-energy protons and secondary neutrons within Skylab. Low-level gamma ray spectroscopy measurements were made on the returned packets to determine the incident neutron and proton fluxes and spectra and their variations with mass distribution.

Fishman, G. J.↗

West Valley Demonstration Project Annual Site Environmental Report (CY2019)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2019. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2019 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2020. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2020 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Resource Conservation and Recovery Act↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2021

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2021. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2021 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2017

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2017. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2017. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2017 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2018

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2018. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2018 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗