Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

GeoRePORT Protocol Volume III: Technical Assessment Tool

Technical Project Readiness Level is an assessment of the development of a geothermal area as a power generation facility. Five separate progression levels ranging from 'unrecognizable' to 'demonstrated' are designated, with criteria specific to technical development that must be completed to move up the scale.

15 GEOTHERMAL ENERGY↗

GeoRePORT Protocol Volume III: Technical Assessment Tool

The GeoRePORT System is based on the concept that a geothermal system can be described both in terms of the quality of the geothermal resource as it relates to the potential to extract heat (resource grade) and the progress of research and development over the lifetime of the project (project readiness level). By assessing the major characteristics of a geothermal resource and categorizing the techniques used and how well the research technique was implemented, users can report a resource grade. The resource grade covers multiple geological, technological, and socioeconomic attributes that can be compared across play types and geothermal areas. Resource grade and project readiness level are reported for three assessment categories: geological, technical, and socioeconomic. This protocol document applies to the Technical Assessment Tool and is intended for use with an excel-based spreadsheet tool, published separately.

15 GEOTHERMAL ENERGY↗

Sustainable Hydropower in Lower Mekong Countries: Technical Assessment and Training Travel Report Thailand

The U.S. Agency for International Development (USAID), through their partnership with the U.S. Department of the Interior (DOI), requested the support of Oak Ridge National Laboratory (ORNL) to provide specialized technical assistance as part of the Smart Infrastructure for the Mekong (SIM) Program in Thailand. Introduced in July 2013 by U.S. Secretary of State John Kerry, SIM is a U.S. Government Inter-Agency program that provides Lower Mekong partner countries with targeted, demand-driven technical and scientific assistance to support environmentally sound, climate conscious and socially equitable infrastructure, clean energy development, and water resources optimization. The U.S. Government is committed to supporting sustainable economic development within the region by providing tools, best practices, technical assistance, and lessons learned for the benefit of partner countries. In response to a request from the Electricity Generating Authority of Thailand (EGAT), a SIM project was developed with two main activities: 1) to promote hydropower sustainability and efficiency through technical assessment training at two existing hydropower assets in Thailand, and 2) the design and implementation of one national and two or three regional science and policy workshops, to be co-hosted with EGAT, to build common understanding of and commitment to environmental and social safeguards for Mekong Basin hydropower projects. The U.S. Department of Energy (DOE) is leading the technical assessment (Activity 1), and has contracted ORNL to provide expert technical assistance focused on increasing efficiency at existing projects, with the goal of increasing renewable energy generation at little to no capital cost. ORNL is the leading national laboratory in hydropower analysis, with a nationally recognized and highly qualified team of scientists addressing small to large-scale systems (basin-, regional-, and national-scale) energy generation optimization analysis for DOE. The mission of the ORNL Water Power Program is to develop technologies, decision-support tools, and methods of analysis that enable holistic management of water-dependent energy infrastructure and natural resources in support of the DOE Energy Efficiency and Renewable Energy Office (DOE-EERE), Federal hydropower agencies, Federal Energy Regulatory Commission (FERC), Nuclear Regulatory Commission (NRC), energy producers, and other entities. In support of SIM, ORNL completed technical assessments of two hydropower plants owned and operated by the Electricity Generating Authority of Thailand (EGAT): Vajiralongkorn (VRK), with an installed capacity of 300 MW, and Rajjaprabha (RPB), with an installed capacity of 240MW. Technical assessment is defined as the assessment of hydropower operation and performance, and the identification of potential opportunities for performance improvement through plant optimization. At each plant, the assessment included an initial analysis of hydropower operating and performance metrics, provided by dam owners. After this analysis, ORNL engaged with the plant management team in a skills exchange, where best practices, operational methods, and technical challenges were discussed. The technical assessment process was outlined to plant management followed by a presentation of preliminary results and analysis based on 50 days of operational data. EGAT has agreed to provide a full year of operational data so a complete and detailed assessment that captures seasonal variability can be completed. The results of these assessments and discussions will be used to develop a set of best practices, training, and procedure recommendations to improve the efficiency of the two assessed plants.

13 HYDRO ENERGY↗

Chemical Process Safety at TRISO-Based, Metal-Based, and Salt-Based Fuel Fabrication Facilities: Technical Assessment and Guidance Assessment

As part of efforts to prepare for potential and ongoing safety reviews for licensing of advanced non-light-water reactor fuel cycles, the U.S. Nuclear Regulatory Commission (NRC) tasked Pacific Northwest National Laboratory to prepare an assessment on the state of knowledge of potential chemical processes at fuel cycle facilities supporting the front end of these fuel cycles, and to assess the associated regulatory guidance. This report provides a technical assessment of chemical process safety considerations to support NRC licensing reviews of fabrication processes for tri-structural isotropic (TRISO) based, metallic-based, and salt-based fuels. The assessments involved collecting publicly available information on the fuel fabrication processes to (i) identify the operational process steps, characteristics and chemicals involved, (ii) identify the physical safety considerations and health safety considerations during licensing reviews of the various process steps, and (iii) collect information to support assessments of severity of accidents and potential mitigative measures to be implemented. The assessment provides a foundational basis on chemical process safety considerations for advanced fuel fabrication activities, although it is recognized that licensing reviews may necessitate design-specific considerations. The specific conditions under which chemical hazards emerge will require process-specific considerations, highlighting the importance of process-informed interpretation. The assessment also determined that exposure guidelines and limits to assess the consequences of acute exposures are limited for some chemicals, although alternative limits and supplementary information from databases or safety data sheets provide sufficient information to evaluate consequences of acute exposures. In addition, it was identified that metallic and salt fuel fabrication processes may involve beryllium, which is an exposure hazard. The regulatory framework for the licensing of advanced fuel cycle facilities, per 10 CFR Part 70 Domestic Licensing of Special Nuclear Material, is deemed robust and flexible to address the chemical safety considerations in this report. A review was conducted on various regulatory guidance and technical basis documents. This included reviewing NUREG-1520, Revision 2, Standard Review Plan for Fuel Cycle Facilities License Applications – Final Report and the process descriptions in Appendix A of NUREG/CR-6410, Nuclear Fuel Cycle Facility Accident Analysis Handbook, to address advanced fuel types. As new fuels will involve process-specific chemical uses, process-specific considerations are provided in this report. Additionally, it is noted that the U.S. Department of Energy protective action criteria database includes Temporary Emergency Exposure Limits (TEELs) for process-specific chemicals. This report provides technical information to support chemical safety assessments of new advanced fuel cycle facilities and identifies technical and safety information to support licensing reviews. No regulatory barriers were identified for the licensing of advanced fuel cycle facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

American Samoa Initial Technical Assessment Report

This document is an initial energy assessment for American Samoa, the first of many steps in developing a comprehensive energy strategy. On March 1, 2010, Assistant Secretary of the Interior Tony Babauta invited governors and their staff from the Interior Insular Areas to meet with senior principals at the National Renewable Energy Laboratory (NREL). Meeting discussions focused on ways to improve energy efficiency and increase the deployment of renewable energy technologies in the U.S. Pacific Territories. In attendance were Governors Felix Camacho (Guam), Benigno Fitial (Commonwealth of the Northern Mariana Islands), and Togiola Tulafono, (American Samoa). This meeting brought together major stakeholders to learn and understand the importance of developing a comprehensive strategic plan for implementing energy efficiency measures and renewable energy technologies. For several decades, dependence on fossil fuels and the burden of high oil prices have been a major concern but never more at the forefront as today. With unstable oil prices, the volatility of fuel supply and the economic instability in American Samoa, energy issues are a high priority. In short, energy security is critical to American Samoa's future economic development and sustainability. Under an interagency agreement, funded by the Department of Interior's Office of Insular Affairs, NREL was tasked to deliver technical assistance to the islands of American Samoa. Technical assistance included conducting an initial technical assessment to define energy consumption and production data, establish an energy consumption baseline, and assist with the development of a strategic plan. The assessment and strategic plan will be used to assist with the transition to a cleaner energy economy. NREL provided an interdisciplinary team to cover each relevant technical area for the initial energy assessments. Experts in the following disciplines traveled to American Samoa for on-island site assessments: (1) Energy Efficiency and Building Technologies; (2) Integrated Wind-Diesel Generation; (3) Transmission and Distribution; (4) Solar Technologies; and (5) Biomass and Waste-to-Energy. In addition to these core disciplines, team capabilities also included expertise in program analysis, project financing, energy policy and energy planning. The intent of the technical assessment was to provide American Samoa with a baseline energy assessment. From the baseline, various scenarios and approaches for deploying cost effective energy efficiency and renewable energy technologies could be created to meet American Samoa's objectives. The information provided in this energy assessment will be used as input in the development of a draft strategic plan and the development of scenarios and strategies for deploying cost-effective energy efficiency and renewable products.

09 BIOMASS FUELS↗

Waste Isolation Pilot Plant Technical Assessment Team Report

This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Technical Assessment Team Report

This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Parametric Study to Assess Technical Prospect Feasibility for Offshore CO 2 Storage

This report is a white paper on the parametric study to assess technical prospect feasibility for CO 2 storage with and without CO 2 -EOR. The SECARB Offshore GOM team reviewed key parameters that previous modeling experience suggests have the largest impact on CO 2 plume size and CO 2 -EOR performance (SSEB, 2019) These parameters include tectonic impacts (reservoir dip and fault block size), reservoir properties (permeability) and development strategies (well field payout, waterflood, and CO 2 flooding strategies). These parameters are further evaluated in this study in order to identify upper and lower boundary conditions for the parametric values. The boundary conditions are needed to set constraints for key parameters when performing modeling assessments. Understanding the key parametric values for the GOM will facilitate locating successful offshore carbon capture utilization and storage (CCUS) projects in terms of plume size, CO 2 stored and, in the case of EOR, oil recovery. Importantly, this white paper focuses on both technical factors (geologic and engineering), but does not address economic, commercial, or stakeholder considerations. The report is organized into four sections and includes a review of the datasets used to define the parameter ranges, the results of a full-physics reservoir simulation, a summary of a reduced order modeling approach to evaluate the impact of the study parameters, and, finally, a discussion of the work that will occur during the next phase of the project.

02 PETROLEUM↗

Technical Assessment of Organic Liquid Carrier Hydrogen Storage Systems for Automotive Applications

In 2007-2009, the DOE Hydrogen Program conducted a technical assessment of organic liquid carrier based hydrogen storage systems for automotive applications, consistent with the Program’s Multiyear Research, Development, and Demonstration Plan. This joint performance (ANL) and cost analysis (TIAX) report summarizes the results of this assessment. These results should be considered only in conjunction with the assumptions used in selecting, evaluating, and costing the systems discussed here and in the Appendices.

08 HYDROGEN↗

National and International Assistance in the Technical Assessment of Nuclear and other Radiological Materials out of Regulatory Control

Considerable resources are dedicated worldwide to detect illicit materials of all types amid the concern of their potential use in criminal acts or acts of terrorism. Of particular concern are illicit nuclear and radiological materials as they have potential to cause serious harm to the general public if not maintained under regulatory control. As such, the international community has developed recommendations and guidance for States and their Competent Authorities to establish, implement, maintain, and strengthen their nuclear security regimes. The International Atomic Energy Agency (IAEA) provides recommendations for the security of nuclear and other radioactive material out of regulatory control through the publication Nuclear Security Recommendations on Nuclear and Other Radioactive Material out of Regulatory Control, Nuclear Security Series No.15. Based on this guidance and national/international practical experience and best practices, the international community has made considerable advances in the detection, interdiction, and adjudication of nuclear and other radiological materials out of regulatory control. The United States Department of Energy, National Nuclear Security Administration (DOE/NNSA), Office of Nuclear Incident Policy and Cooperation has national/international experience to share on providing emergency responders and front line officers assistance in the technical assessment of interdicted nuclear and other radioactive Materials Out of Regulatory Control (MORC).

61 RADIATION PROTECTION AND DOSIMETRY↗

Guam Initial Technical Assessment Report

Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conductfuture analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technical Assessment of Novel Hydrogen Producing Solid Oxide Fuel Cell Power System

Solid oxide cell-based electrolysis (SOEC) systems are being considered for hydrogen production due to their potential for high efficiencies and for their integrability with base load power generation systems when operated in solid oxide fuel cell (SOFC) mode. However, a cost prohibitive combination of SOFC power systems and SOEC systems may be required to operate the plant flexibly to produce a combination of H 2 and power on-demand. A single (consequently less expensive) reversible SOFC/SOEC system, on the other hand, poses technological challenges related to the on demand switching between power and H 2 production. This report provides a high-level technical assessment of a novel SOFC based H 2 production concept that averts the potential drawbacks of the SOEC systems. The novel concept combines the advantages of steam-reforming of natural gas to produce H 2 with the high efficiency power generation capabilities of a SOFC in a single package.

30 DIRECT ENERGY CONVERSION↗

Technical Assessment of Compressed Hydrogen Storage Tank Systems for Automotive Applications

This technical report describes DOE's assessment of the performance and cost of compressed hydrogen storage tank systems for automotive applications. The on-board performance (by Argonne National Lab) and high-volume manufacturing cost (by TIAX LLC) were estimated for compressed hydrogen storage tanks. The results were compared to DOE's 2010, 2015, and ultimate full fleet hydrogen storage targets. The Well-to-Tank (WTT) efficiency as well as the off-board performance and cost of delivering compressed hydrogen were also documented in the report.

08 HYDROGEN↗

Technical Assessment of Cryo-Compressed Hydrogen Storage Tank Systems for Automotive Applications

Technical report describing DOE's second assessment report on a third generation (Gen3) system capable of storing hydrogen at cryogenic temperatures within a pressure vessel on-board a vehicle. The report includes an overview of technical progress to date, including the potential to meet DOE onboard storage targets, as well as independent reviews of system cost and energy analyses of the technology paired with delivery costs.

08 HYDROGEN↗

Technical Assessment for the CPC FD-7x-1500 Wind Turbine located at Tooele Army Base, Tooele Utah

The CPC FD-7x-1500 Wind Turbine was installed with funding from the Energy Conservation Investment Program (ECIP). Since its installation, the turbine has been plagued with multiple operational upsets causing unacceptable down time. In an effort to reduce down time, the Army Corps of Engineers requested the Idaho National Laboratory conduct an assessment of the turbine to determine its viability as an operational turbine.

17 WIND ENERGY↗

Republic of the Marshall Islands. Energy Project Development Options and Technical Assessment (2013)

The advancement of renewable energy and energy efficient technologies continues to be fluid. There are many technical opportunities and strategies that can be utilized to guide communities to deploy cost-effective commercial alternative energy options; however, to achieve aggressive economic, environmental, and security goals, it requires a comprehensive, integrated approach. This document reports on the initial findings of an energy assessment that was conducted for the Republic of the Marshall Islands.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Achieving groundwater monitoring optimization at SRS: a core team process based on rigorous technical assessment - 15273

The optimization of groundwater monitoring at Savannah River Site (SRS) was achieved through a core team process based on the application of a comprehensive, technical evaluation of individual regulated groundwater units. Groundwater monitoring at SRS is required at dozens of waste sites and includes about 4,000 samples annually. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost to the environmental management budget. The core team, consisting of representatives from the Department of Energy (DOE); U.S. Environmental Protection Agency (USEPA); and the South Carolina Department of Health and Environmental Control (SCDHEC), recognized that monitoring needs for individual plumes evolve as remediation work progresses. The technical evaluation plan was generally based on the availability of many years of monitoring data. In addition, it was recognized that the well network, sampling frequency, and analytical suite had been the same for years and warranted evaluation to determine if the existing monitoring was meeting the current objectives. In order to systematically evaluate monitoring at eighteen different groundwater units, SRS developed a decision-logic analysis using flow sheets to address five areas of optimization identified with core team agreement, including: (1) current monitoring vs regulatory requirements, (2) spatial optimization, (3) temporal assessment, (4) analyte assessment, and (5) reporting assessment. The evaluation resulted in SRS proposing changes in the spatial, temporal, analyte, and reporting aspects of groundwater monitoring for fifteen of the eighteen individual groundwater units evaluated. Overall, these changes have resulted in annual savings of $370 K to date, with an additional $200 K in annual savings pending. Early and frequent core team deliberations helped ensure the success of this optimization effort. The technical evaluation was conducted after receiving core team buy-in for the goals and methods of the project. Technical evaluations for each unit were proposed to the regulators in unit-specific regulatory submittals. The technical justifications and core team decisions were all documented and implemented in accordance within the framework of the SRS Federal Facility Agreement or Resource Conservation and Recovery Act (RCRA) Permit process. This optimization approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗