Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Technology readiness levels and technology status for selected long term/high payoff technologies on the RLV program

The development of a new space transportation system in a climate of constant budget cuts and staff reductions can be and is a difficult task. It is no secret that NASA's current launching system consumes a very large portion of NASA funding and requires a large army of people to operate & maintain the system. The new Reusable Launch Vehicle (RLV) project and it's programs are faced with a monumental task of making the cost of access to space dramatically lower and more efficient than NASA's current system. With pressures from congressional budget cutters and also increased competition and loss of market share from international agencies RLV's first priority is to develop a 'low-cost, reliable transportation to earth orbit.' One of the RLV's major focus in achieving low-cost, reliable transportation to earth orbit is to rely on the maturing of advanced technologies. The technologies for the RLV are numerous and varied. Trying to assess their current status, within the RLV development program is paramount. There are several ways to assess these technologies. One way is through the use of Technology Readiness Levels (TRL's). This project focused on establishing current (summer 95) 'worst case' TRL's for six selected technologies that are under consideration for use within the RLV program. The six technologies evaluated were Concurrent Engineering, Embedded Sensor Technology, Rapid Prototyping, Friction Stir Welding, Thermal Spray Coatings, and VPPA Welding.

Rosmait, Russell L.↗

Readying technology for a super SST

A technology readiness evaluation is made of the configurational, propulsion system, avionics, and materials/manufacturing methods which could be integrated to produce an economically viable SST by the year 2000. Aerodynamically, promising results are noted in the cases of arrow-wing planforms and blended wing/body cross sections, as well as in vortex flaps. In structures, metal matrix composites with high specific strength at high temperatures and thermoplastically formed/diffusion-bonded titanium alloy sandwich structures are identified as being of primary importance. Performance improvement prospects are also noted for engine efficiencies and sonic boom overpressures. The various technologies are envisaged as the bases for a two-engine, two-crew cockpit, 250-seat arrow-winged SST.

Petersen, R. H.↗

Solar sail-solar electric technology readiness and transfer assessment

A method of conducting a technology readiness assessment was developed. It uses existing OAST technology readiness and risk criteria to define a technology readiness factor that considers both the required gain in technology readiness level to achieved technology readiness plus the degree of effort associated with achieving the gain. The results indicate that Solar Electric Propulsion is preferred based on technology readiness criteria. Both Solar Sail and Solar Electric Propulsion have a high level of transfer potential for future NASA missions, and each has considerable technology spillover for non-NASA applications.

Chase, R. L.↗

Technology readiness assessment of magnetohydrodynamic stability control

The technology readiness level scale is revised with clear definitions for magnetohydrodynamic stability control technologies for magnetic confinement fusion. The definitions are in the form of a sentence with three dimensions, which are the system complexity, the test environment, and the cost. A clear and simple definition is sought after to make an assessment based on the evidence which is agreeable to the fusion energy development community. A sample technology readiness assessment (TRA) for the electron cyclotron current drive-based control of neoclassical tearing mode for ST Advanced Reactor, using the proposed scale, reveals that the risk of a TRA being misinterpreted is high, which can only be avoided with an understanding of the procedure described in this paper.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Technology Readiness Assessment for Stirling Power Convertor

Stirling-based power conversion system could represent a critical enabling technology for future NASA missions, offering significantly enhanced power efficiency over traditional thermoelectric systems. To ensure the successful infusion of this technology into deep space and planetary surface missions, a rigorous evaluation of its maturity and associated risks is essential. The objective of this Technology Readiness Assessment (TRA) is to determine the current technology readiness level (TRL) of the Stirling power convertor and identify key technical risks and challenges associated with its maturation and potential infusion into a targeted flight system. The evaluation process will rigorously follow the NASA TRA procedure: (1) determining the requirements that underpin the design, function, and performance; (2) finding and listing all new technology elements (NTEs) and critical technology elements (CTEs); (3) identifying the level of integration assumed for the assessment; and (4) assessing the TRL for each NTE and CTE. The overall subassembly TRL will then be determined via a roll-up using the “weakest link” criterion, culminating in a final (5) assessment of risks to further progression of maturity. This paper will present the results of a comprehensive technology readiness assessment (TRA) conducted on the Stirling-based dynamic power conversion subassembly, excluding the radioisotope heat source. The paper will also describe a detailed breakdown of the TRL roll-up and a matrix of identified risks and recommended mitigation paths, along with identified key technical risks and challenges to achieve the required long-duration performance. Key Words: Radioisotope Power Conversion, Technology Readiness Assessment

Radioisotope Power Conversion↗

Considerations for Nuclear Thermal Propulsion Reactor Technology Readiness Level Advancement

Nuclear thermal propulsion (NTP) is a candidate in-space propulsion technology for crewed missions to Mars. An NTP engine relies on the use of a reactor as a heat exchanger to directly heat a hydrogen propellant which is expanded through a nozzle for high specific impulse (> 850s), high thrust (>15 klbf) propulsion. NTP reactor and engine technologies are currently being developed to enable a future NTP engine prototype demonstration. Technology readiness level (TRL) definitions are a useful tool to plan necessary technology advancement tasks as they provide guidance on expected development activities and necessary level of fidelity of test article or testing conditions for demonstration tasks. However, technology readiness definitions for an NTP reactor and related demonstration tasks have not yet been defined. This paper identifies relevant TRL definitions by the National Aeronautics and Space Administration (NASA) and Department of Energy (DOE). Based on these definitions, preliminary recommendations on testing conditions and important parameters to consider for NTP reactor technology development planning are provided for TRL 1 - 6. As a part of this effort, functional characteristics and important performance parameters for the reactor are identified, as well as a summary of relevant literature which was considered when assessing development tasks capable of meeting TRL definition criteria.

nuclear thermal propulsion↗

Considerations for Nuclear Thermal Propulsion Reactor Technology Readiness Level Advancement

Nuclear thermal propulsion (NTP) is a candidate in-space propulsion technology for crewed missions to Mars. An NTP engine relies on the use of a reactor as a heat exchanger to directly heat a hydrogen propellant which is expanded through a nozzle for high specific impulse (> 850s), high thrust (>15 klbf) propulsion. NTP reactor and engine technologies are currently being developed to enable a future NTP engine prototype demonstration. Technology readiness level (TRL) definitions are a useful tool to plan necessary technology advancement tasks as they provide guidance on expected development activities and necessary level of fidelity of test article or testing conditions for demonstration tasks. However, technology readiness definitions for an NTP reactor and related demonstration tasks have not yet been defined. This paper identifies relevant TRL definitions by the National Aeronautics and Space Administration (NASA) and Department of Energy (DOE). Based on these definitions, preliminary recommendations on testing conditions and important parameters to consider for NTP reactor technology development planning are provided for TRL 1 - 6. As a part of this effort, functional characteristics and important performance parameters for the reactor are identified, as well as a summary of relevant literature which was considered when assessing development tasks capable of meeting TRL definition criteria.

nuclear thermal propulsion↗

Technology Readiness Level as the Foundation of Human Readiness Level

Communication of the maturity of technology through the program/product life cycles helps enhance risk management from the beginning and support decision-making strategies for research, development, and allocation of resources. Currently, many organizations use the technology readiness level (TRL) as a simple metric to indicate the maturity of the technology. This article will discuss the TRL history, define the TRL levels, show how the TRL relates to the technology life cycle, and how the TRL framework contributes to the human readiness level (HRL) structure. Through the TRL advantages and disadvantages, this article will show how the TRL falls short in numerous areas of engineering, including the integration readiness of system/subsystem components and assessment of the readiness of the technology to operate within the human capabilities and limitations. Yet the article also shows how the TRL serves as the foundation for HRL.

George Salazar↗

The Importance of Technology Readiness in NASA Earth Venture Missions

The first set of Venture-class investigations share the characteristic that the technology should be mature and all investigations must use mature technology that has been modeled or demonstrated in a relevant environment (Technology Readiness Level (TRL) >5). Technology Readiness Levels are a systematic metric/measurement system that supports assessments of the maturity of a particular technology and the consistent comparison of maturity between different types of technology. The TRL is used in NASA technology planning. A major step in the level of fidelity of the technology demonstration follows the completion of TRL 5. At TRL 6, a system or subsystem model or prototype must be demonstrated in a relevant environment (ground or space) representative model or prototype system or system, which would go well beyond ad hoc, "patch-cord," or discrete component level breadboarding. These TRL levels are chosen as target objectives for the Program. The challenge for offerors is that they must identify key aspects (uncertainty, multi subsystem complexity, etc) of the TRL estimate that should be properly explained in a submitted proposal. Risk minimization is a key component of the Earth Venture missions. Experiences of prior airborne missions will be shared. The discussion will address aspects of uncertainty and issues surrounding three areas of airborne earth science missions: (1) Aircraft or proposed flight platform -- Expressing the capability of the aircraft in terms of the supporting mission requirements. These issues include airplane performance characteristics (duration, range, altitude, among others) and multiship complexities. (2) Instruments -- Establishing that the instruments have been demonstrated in a relevant environment. Instruments with heritage in prior space missions meet this requirement, as do instruments tested on the ground. Evidence that the instruments have demonstrated the ability to collect data as advertised will be described. The complexity of the integration of multiple subsystems will also be addressed. Issues associated with tailoring the instrument to meet the specific Venture mission objectives must be thoroughly explained and justified. (3) Aircraft/Instrument Integration -- Explicitly defining what development may be required to harden the instrument and integrate the instrument. The challenges associated with this key aspect of major airborne earth science investigations will be presented.

Wells, James E.↗

JPL Technology Readiness Assessment Guideline

New capabilities in spaceflight missions are enabled by new technologies. Transitioning new technology to spaceflight elements is difficult and introduces risk, but finding the right balance between benefit and risk leads to scientific advancements and novel space missions. A clear understanding of the risks of new technology can create an environment where innovation is nurtured rather than avoided. The Technology Readiness Level (TRL) was developed as a metric for the maturity of new technology, but, in the past, assessing the TRL was often done informally and inconsistently. This frequently led to discrepancies between the TRL as perceived by the technologist and that perceived by a project. JPL has developed a guideline for their projects to provide a basis for a consistent Technology Readiness Assessment (TRA). Highlights of this guideline are presented here. It is anticipated that the implementation of this guideline will enable the hand-off from technologists to project engineers leading to greater acceptance of technologies by flight projects. On completion of a satisfactory TRA, an agreement can be made between the parties on the maturation plan required for successful infusion of the technology into a flight mission.

Frerking, Margaret A.↗

Technology Readiness Level Assessment Process as Applied to NASA Earth Science Missions

Technology assessments of fourteen science instruments were conducted within NASA using the NASA Technology Readiness Level (TRL) Metric. The instruments were part of three NASA Earth Science Decadal Survey missions in pre-formulation. The Earth Systematic Missions Program (ESMP) Systems Engineering Working Group (SEWG), composed of members of three NASA Centers, provided a newly modified electronic workbook to be completed, with instructions. Each instrument development team performed an internal assessment of its technology status, prepared an overview of its instrument, and completed the workbook with the results of its assessment. A team from the ESMP SEWG met with each instrument team and provided feedback. The instrument teams then reported through the Program Scientist for their respective missions to NASA's Earth Science Division (ESD) on technology readiness, taking the SEWG input into account. The instruments were found to have a range of TRL from 4 to 7. Lessons Learned are presented; however, due to the competition-sensitive nature of the assessments, the results for specific missions are not presented. The assessments were generally successful, and produced useful results for the agency. The SEWG team identified a number of potential improvements to the process. Particular focus was on ensuring traceability to guiding NASA documents, including the NASA Systems Engineering Handbook. The TRL Workbook has been substantially modified, and the revised workbook is described.

Systems Engineering↗

Orbit transfer rocket engine integrated control and health monitoring system technology readiness assessment

The objectives of this task were to: (1) estimate the technology readiness of an integrated control and health monitoring (ICHM) system for the Aerojet 7500 lbF Orbit Transfer Vehicle engine preliminary design assuming space based operations; and (2) estimate the remaining cost to advance this technology to a NASA defined 'readiness level 6' by 1996 wherein the technology has been demonstrated with a system validation model in a simulated environment. The work was accomplished through the conduct of four subtasks. In subtask 1 the minimally required functions for the control and monitoring system was specified. The elements required to perform these functions were specified in Subtask 2. In Subtask 3, the technology readiness level of each element was assessed. Finally, in Subtask 4, the development cost and schedule requirements were estimated for bringing each element to 'readiness level 6'.

Bickford, R. L.↗

Assessment of Technology Readiness Level of a Carbon Dioxide Reduction Assembly (CRA) for use on International Space Station

When technologies are traded for incorporation into vehicle systems to support a specific mission scenario, they are often assessed in terms of Technology Readiness Level (TRL). TRL is based on three major categories of Core Technology Components, Ancillary Hardware and System Maturity, and Control and Control Integration. This paper describes the Technology Readiness Level assessment of the Carbon Dioxide Reduction Assembly (CRA) for use on the International Space Station. A team comprising of the NASA Johnson Space Center, Marshall Space Flight Center, Southwest Research Institute and Hamilton Sundstrand Space Systems International have been working on various aspects of the CRA to bring its TRL from 4/5 up to 6. This paper describes the work currently being done in the three major categories. Specific details are given on technology development of the Core Technology Components including the reactor, phase separator and CO2 compressor.

Murdoch, Karen↗

Definition, technology readiness, and development cost of the orbit transfer vehicle engine integrated control and health monitoring system elements

An Integrated Control and Health Monitoring (ICHM) system was conceived for use on a 20 Klb thrust baseline Orbit Transfer Vehicle (OTV) engine. Considered for space used, the ICHM was defined for reusability requirements for an OTV engine service free life of 20 missions, with 100 starts and a total engine operational time of 4 hours. Functions were derived by flowing down requirements from NASA guidelines, previous OTV engine or ICHM documents, and related contracts. The elements of an ICHM were identified and listed, and these elements were described in sufficient detail to allow estimation of their technology readiness levels. These elements were assessed in terms of technology readiness level, and supporting rationale for these assessments presented. The remaining cost for development of a minimal ICHM system to technology readiness level 6 was estimated. The estimates are within an accuracy range of minus/plus 20 percent. The cost estimates cover what is needed to prepare an ICHM system for use on a focussed testbed for an expander cycle engine, excluding support to the actual test firings.

Cannon, I.↗

Technology Readiness Assessment Best Practices Guide

This guide establishes standard definitions and best practices for conducting technology readiness assessments (TRAs) for in flight projects and NASA’s research and technology missions. These best practices originated from a NASA TRA Committee that met weekly in 2014. The team was co-led by the Headquarters (HQ) Office of the Chief Engineer (OCE) and the HQ Office of the Chief Technologist (OCT), and included one to two representatives from each Center.

Technology readiness level↗

Solar Sail Propulsion Technology Readiness Level Database

The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 solar sail system design and development hardware demonstration activities over the past 20 months. Able Engineering Company (AEC) of Goleta, CA is leading one team and L Garde, Inc. of Tustin, CA is leading the other team. Component, subsystem and system fabrication and testing has been completed successfully. The goal of these activities is to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by 2006. These activities will culminate in the deployment and testing of 20-meter solar sail system ground demonstration hardware in the 30 meter diameter thermal-vacuum chamber at NASA Glenn Plum Brook in 2005. This paper will describe the features of a computer database system that documents the results of the solar sail development activities to-date. Illustrations of the hardware components and systems, test results, analytical models, relevant space environment definition and current TRL assessment, as stored and manipulated within the database are presented. This database could serve as a central repository for all data related to the advancement of solar sail technology sponsored by the ISPT, providing an up-to-date assessment of the TRL of this technology. Current plans are to eventually make the database available to the Solar Sail community through the Space Transportation Information Network (STIN).