Search NASA⌕ Search

SEARCH · Search NASA

Results for “tertiary control layer”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Chapter 32 - Power Grid Resilience

The new energy paradigm is altering the current power grid trend from synchronous generator reliant system toward power-electronics-based distributed energy resources (DERs). The resilient operation of modern power grid is highly dependent upon cyber and physical reliable operation of DERs. Power grid resilience broadly refers to the ability of the grid to be robust to eventualities and singularities that may disrupt the continuity of reliable power flow. This could involve resilience related to the physical system but more recently, the focus on cyber resilience has been evolving rapidly especially given the burgeoning growth of distributed generation and power-electronics-based DERs under smart grid and given that such threats to reliable operation do not have to evolve localized to where the physical asset is. Commonly, in power grids dominated by DERS, control and energy management are structured at a multitime scale multilayer fashion: (i) primary control layer at microseconds time scale, (ii) secondary control layer at millisecond time scale, and (iii) tertiary control layer at seconds to minutes time scale. The cyber-related issues that may affect the power grid resilience can be introduced in through primary, secondary, and tertiary control layers. The failure of each of these control layers may impact the reliable and resilient operation of the overall network and cause widespread failures which leads to unintended blackouts. As such, this chapter focuses on cyber-related resilience issues in primary control layer, secondary control layer, tertiary control layer, wide area/utility control, and anomaly detection and resilient communication.

anomaly detection↗

Managing Capital Investments and Resources for Large, Complex Satellite Development Efforts

Once the schedule was baselined and the primary, secondary, and tertiary critical paths (at least) were established: Identified what entity control which portion of the schedule reserve Dollarized the time associated with the schedule reserve and segregated it off from other budget reserves authorization to spend only came when authorization to utilize the time was given Created a process to manage the control of these resources This process was above and beyond the typical schedule controls used to monitor and maintain the day-to-day schedules Webb telescope will be the premier space observatory for astronomers worldwide,extending the tantalizing discoveries of the Hubble Space telescope• An international collaboration among NASA, the European Space Agency, and theCanadian Space Agency• The largest telescope ever placed in space, Webb will be ~100 times more powerful thanHubble• It is so big it has to fold origami-style to fit in the rocket and will unfold like a transformeronce in space• The 5-layer sunshield protects the telescope from the Sun, Earth, and Moon’s infraredradiation. It’s like having sun protection of SPF 1 million• Unprecedented infrared sensitivity will peer back in time over 13.5 billion years to see thefirst galaxies born after the Big Bang• Hubble orbits ~350 miles above the Earth; Webb will orbit the sun ~1 million miles fromEarth• Launch from French Guiana in 2018

Ryan, Richard M.↗